Quantity Takeoff and Construction Takeoff Services in Ireland
When three tenders close in the same fortnight, measuring is usually what holds up the price. Optimar Precon takes off metric quantities from your drawings, trade by trade, laid out to ARM4 or your own format. Your estimators can then spend their time on rates and suppliers.
- House-type multipliers for schemes, typical floors for apartments
- Trade packages ready to send to Irish subcontractors and suppliers
- Trades released one at a time, so pricing starts early
Irish Takeoff Quote
List the trades you need and the tender closing date. We’ll reply with a fee and a release plan.
Half of Ireland’s New Homes Are Scheme Houses
How 2025 completions split, and what that means for takeoffs.
CSO new dwelling completions, 2025. Repetition is where a structured takeoff saves the most time.
Quantities That Match How You Price
A takeoff is only useful if it fits your pricing sheet. We set ours up to match how Irish estimators and subcontractors work: by house type or floor, by trade package, and in the units your suppliers quote in. You price straight from it instead of reworking it.
House-type multipliers
Each house type measured once and multiplied by the number on the site layout.
Trade packages
Groundworks, frame, roofing, drylining, windows and M&E split out for subcontract enquiries.
Marked-up drawings
Colour-coded PDFs that show what was counted, so any figure can be checked.
Takeoffs for Every Irish Trade Package
Order one trade or the whole building.
Groundworks and drainage
Excavation, fill, foundations, drainage runs and manholes for estates and sites.
Earthwork takeoff →Concrete and reinforcement
Volumes, formwork and rebar tonnage, with bar schedules on request.
Concrete takeoff →Blockwork and timber frame
Block walls by type, or timber frame panels, studs and sheathing by house type.
Masonry takeoff →Structural steel
Member tonnage, connections and decking for commercial and industrial frames.
Steel takeoff →Mechanical and electrical
Heat pumps, ventilation, pipework, containment and fittings counted by system.
MEP takeoff →Floors and finishes
Floor, wall and ceiling finishes by room, ready for drylining and flooring subcontractors.
Flooring takeoff →A Takeoff You Can Price From Straight Away
Each Irish takeoff includes the following.
ARM4 or your layout
Items described and ordered to ARM4, or to your own pricing template.
Metric units
m, m², m³, tonnes and counts, matching how Irish suppliers quote.
Waste shown separately
Net quantities with waste factors in their own column.
Package sheets
One tab per trade, ready to send out for subcontract quotes.
Query list
Missing information listed for the tender clarification period.
Addendum changes
Revised drawings re-measured, with old and new quantities side by side.
We measure what the drawings show. Rates, risk and the final price stay with your team.
Staged Takeoffs Under a Tight Deadline
A published bid we supported, plus three Irish requests.
Every trade measured in 96 hours
The contractor came to us halfway through a bid. Takeoffs went out trade by trade so pricing could run in parallel, and the last package arrived three hours before the deadline. We use the same staged approach on Irish tenders.
Timber frame houses for a 60-unit estate
A builder needs frame, roof and finishes quantities per house type, plus site totals.
- You send
- House types, site layout
- You get
- Per-type and site quantities
- Typical time
- 4–5 working days
Drylining package for a Dublin block
A drylining subcontractor needs partitions, ceilings and boards measured by floor.
- You send
- Plans, wall types, ceiling plans
- You get
- Quantities by floor and type
- Typical time
- 2–4 working days
Groundworks for an industrial site
A civil contractor needs earthworks, drainage and paving quantities for a warehouse yard.
- You send
- Levels, drainage, external works
- You get
- Cut and fill, drainage, paving
- Typical time
- 3–5 working days
The three cards are example scopes, not completed client projects. See our sample deliverables.
Trades Delivered in the Order You Price Them
Drawings in
Upload the tender set and tell us the closing date.
Release plan
A fee and a date for each trade, with long-lead packages first.
Trades out
Each trade sent as soon as it’s measured and checked.
Addenda
Late revisions re-measured and sent back as change lists.
Takeoff Services in Ireland: FAQs
What format do the quantities come in?
Excel by default, laid out to match your pricing sheet or ARM4, with marked-up drawings so every quantity can be checked.
Can you measure a full housing scheme by house type?
Yes. We measure each house type once, multiply by the unit count, and measure roads, drainage and external works separately.
Do you measure single trades?
Yes. Groundworks, concrete, blockwork, roofing, drylining, finishes and MEP can each be measured on their own.
How quickly can you deliver?
Most single-trade takeoffs take two to four working days. For larger jobs we send trades in the order you need to price them.
How do I send drawings?
Email support@optimarprecon.com or call +44 74 2787 2167. Large drawing sets can be shared by a cloud link.
Related services
Measuring Holding Up Your Price?
Upload the drawings. You’ll get a fee and a trade-by-trade release plan within one working day.