Ireland · ARM4 bills of quantities · Public works tenders · Euro pricing

Construction Estimating Services Across Ireland

Irish tenders have their own rules. Bills of quantities follow ARM4, public jobs run on the Public Works Contracts, and most building work carries 13.5% VAT. Optimar Precon prices Irish tenders in euro, item by item, in the format your client issued, for main contractors, subcontractors and developers.

  • Bills of quantities measured and priced to ARM4
  • Public works tender pricing with risk and inflation allowances shown openly
  • Cost plans for developers, from feasibility to pre-tender

Irish Estimate Request

Tell us the client (public or private), the contract form and the closing date. We’ll reply with a fee and a programme.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO9001 & 27001 certified
Pricing in Ireland

A Busier Market, and More Tenders to Price

Key figures that shape an Irish estimate.

11,994homes completed in Q4 2025, the busiest quarter on record
+38.5%on the same quarter a year earlier
ARM4the Irish measurement rules most bills of quantities follow
13.5%VAT rate on most construction services, shown on its own line

CSO completions data and Irish pricing conventions. More homes being built means more tenders to price, and the estimating desk is usually where the queue forms.

Pricing public works

Fixed-Price Tenders Need Visible Risk

Public works contracts put much of the risk on the contractor. If the risk sits inside the rates, nobody can see it at the bid review. We price measured work, preliminaries and risk as separate lines, so your directors can decide what to carry and what to qualify.

ARM4

Measured to the rules

Quantities and item descriptions that follow ARM4, so the bill matches what the QS expects.

Prelims

Preliminaries from the programme

Site staff, welfare, cranes, scaffolding and insurances priced against the contract period.

Risk

Risk register priced

Ground, design, inflation and programme risks listed with an allowance for each.

Quantity surveyor pricing an ARM4 bill of quantities for an Irish tender
Estimating in Ireland

From Bill of Quantities to Board Approval

The estimating work Irish companies outsource most.

ARM4 bills of quantities

Bills prepared from drawings and specifications, or your issued bill checked and priced.

BOQ estimation →

Main contractor tenders

Full tender pricing for schools, housing, healthcare and commercial buildings.

Bid estimating →

M&E subcontract pricing

Mechanical and electrical packages priced from supplier quotes and installation outputs.

MEP estimating →

Developer cost plans

Elemental cost plans from feasibility to pre-tender, updated at each design stage.

Cost planning →
Delivered in: ExcelCostXYour client’s bill formatEuro
In every estimate

What Your Bid Review Will See

Everything laid out for an Irish tender adjudication meeting.

Euro summary

Totals by section, with preliminaries, overheads, profit and VAT each on their own line.

Rate build-ups

Labour, plant and materials behind every major rate, open to challenge.

Supplier comparison

Quotes for each package levelled on scope, with gaps flagged.

Risk register

Each risk with an allowance, so the final margin is a clear decision.

Tender queries

Gaps and conflicts listed for the clarification period.

Qualifications

Assumptions and exclusions written up for your tender letter.

We prepare the pricing. Your company sets the final figure and signs the tender.

Example scopes

Three Typical Irish Pricing Jobs

One public, one private, one subcontract.

Example scope · Public works

Priced bill for a primary school

A contractor needs the issued ARM4 bill priced, preliminaries built and risks listed before closing.

You send
Bill, drawings, contract conditions
You get
Priced bill, risk register, letter
Typical time
5–8 working days
Example scope · Developer

Cost plan for an apartment scheme

A developer needs an elemental cost plan to test viability before lodging for planning.

You send
Design drawings, accommodation schedule
You get
Cost plan, cost per unit and per m²
Typical time
4–6 working days
Example scope · Subcontract

Electrical package for a nursing home

An electrical contractor needs a priced tender from the specification and layouts.

You send
Spec, layouts, supplier quotes
You get
Priced package, labour build-up
Typical time
3–5 working days

These are example scopes, not completed client projects. See also our sample deliverables.

Through the tender period

How an Irish Tender Runs With Us

Documents in

Bill, drawings, specification and contract conditions shared.

Queries out

Gaps listed early for the clarification deadline.

Pricing

Rates built up, quotes levelled, preliminaries and risk priced.

Review pack

Summary, risks and qualifications ready before your bid review.

FAQs

Estimating in Ireland: FAQs

Do you measure to ARM4?

Yes. Bills of quantities can follow the Agreed Rules of Measurement (ARM4), or the format in the tender documents if it differs.

Which rates do you use for Irish projects?

We build rates from current Irish labour, plant and material costs, and we use your own rates or supplier quotes where you provide them.

Can you price a public works tender?

Yes. We price the bill or schedule in the tender, list the risks and allowances behind the price, and keep VAT at 13.5% on construction separate from the net figures.

How fast can you turn an estimate round?

Small packages often take a few days; larger tenders are planned around your closing date, with priority trades sent first.

How do I send a tender?

Email support@optimarprecon.com or call +44 74 2787 2167 with the documents and closing date. We confirm scope, fee and delivery date before starting.

Tender Closing Soon?

Send the documents. You’ll have a fee and a pricing plan within one working day.

Scroll to Top