Mechanical, Electrical, Plumbing and Fire Protection
MEP Estimating Services
Optimar Precon prepares MEP quantity takeoffs, labor and material estimates, trade breakdowns and bid-support documentation for contractors in the USA, UK, UAE and Canada. Send your drawings for a fixed quote within 24 working hours, then add estimating capacity per bid or with a dedicated MEP estimator.
Project enquiry
Send Your MEP Estimate Requirements
Share the drawings, specifications, required trades, project location and bid date.
Fixed quote within 24 working hours of receiving your drawings, depending on complexity. NDA available on request.
MEP trade estimating
Mechanical, Electrical, Plumbing and Fire Protection Estimating
MEP estimating is the building-services part of our construction estimating services. Each trade can be priced as its own package or as one combined MEP estimate.
What do MEP estimating services include?
MEP estimating services measure and price HVAC, mechanical piping, electrical power, lighting, low-voltage, plumbing, drainage and fire protection systems from the drawings and specifications. The estimate includes labor hours, material and equipment pricing, trade summaries, alternates, allowances, assumptions and exclusions.
Mechanical Estimating Services
HVAC equipment, air distribution, hydronic systems, mechanical piping, insulation and controls.
- Air handlers and terminal units
- Ductwork and fittings
- Mechanical piping and valves
- Insulation and supports
Electrical Estimating Services
Distribution equipment, feeders, branch wiring, lighting, devices, controls, containment and low-voltage systems.
- Switchgear, panels and transformers
- Conduit, cable and wire
- Lighting fixtures and controls
- Devices and low-voltage
Plumbing Estimating Services
Domestic water, sanitary, vent, storm, gas, fixtures, equipment, valves, insulation and accessories.
- Fixtures and equipment
- Domestic water piping
- Sanitary, vent and storm
- Valves, supports and insulation
Fire Protection Estimating
Sprinkler and fire protection systems shown or specified in the bid documents.
- Sprinkler heads and devices
- Piping and fittings
- Valves, risers and accessories
- Fire pumps and equipment
Deliverables and workflow
What You Receive and How We Get There
Every estimate follows your bid structure, cost codes and trade divisions, with the documents used, the pricing basis and any information gaps stated clearly.
Quantity takeoff
Itemized equipment, fixtures, piping, ductwork, conduit, cable, devices and accessories, with marked-up drawings.
Priced estimate
Material, labor and equipment extensions using your rates, supplier quotes or another agreed pricing source.
Trade and system summaries
Breakdowns by trade, building, level, zone, system or bid package.
Clarifications and exclusions
Assumptions, scope gaps, allowances, alternates and RFI prompts kept visible for your review.
How we work with you
Per Bid, Hourly or a Dedicated MEP Estimator
Every engagement starts with a fixed quote within 24 working hours, depending on complexity. You keep control of supplier pricing, markups and the final bid.
Fixed price per estimate
One fee for a defined trade package or a full MEP bid, agreed before work starts.
Hourly estimating support
For addenda, revisions, change orders and quote comparisons.
Dedicated MEP estimator
A full-time estimator in your templates and bid calendar (VCC, BOT or BOM).
See the output first
Review Sample MEP Estimates
Check the structure and level of detail of our MEP takeoffs and estimates before you send a project.
- HVAC / mechanical takeoff sample (PDF)
- Electrical takeoff sample (PDF)
- Plumbing estimating sample (PDF)
Bidding MEP work every week?
Hire a Dedicated MEP Estimator
Add a full-time offshore MEP estimator who works inside your templates, cost codes and bid calendar, without the cost and delay of a local hire.
- Mechanical, electrical, plumbing and fire protection experience
- Working-hour overlap with US and UK teams
- ISO 9001 quality and ISO/IEC 27001 information security
Project types
MEP Estimates for Commercial, Residential and Technical Projects
System capacity, redundancy and service density change MEP cost far more than floor area, so each estimate reflects the way that building type is actually serviced.
Commercial and mixed use
HVAC zoning, lighting, controls and tenant/landlord scope splits.
Residential and multifamily
Repeated unit types, risers, common areas and floor-by-floor quantities.
Data centers
Redundant power distribution, cooling, controls and phased capacity. See data center estimating.
Healthcare and life sciences
Specialist ventilation, medical gases, emergency power and phasing.
Education and institutional
Labs, kitchens, auditoriums, campus utilities and occupied-building work.
Industrial and logistics
Process utilities, large equipment, high-bay systems and power demand.
Hospitality and retail
Guest rooms, commercial kitchens, public areas and tenant services.
Transport and infrastructure
Terminals, stations and depots with large distribution systems.
Frequently asked questions
MEP Estimating Services FAQs
Quotes, pricing, trade packages, design stages, revisions and dedicated estimators.
How quickly can I get a quote for MEP estimating services?
Send your drawings, specifications, required trades and bid date and you will receive a fixed quote within 24 working hours. Larger or more complex packages may take a little longer, and the delivery date is confirmed before work starts.
How much do MEP estimating services cost?
It depends on the trades, project size, drawing quality and level of detail. We price per estimate, hourly for revisions and open-ended work, or monthly for a dedicated MEP estimator. Every job starts with a fixed quote within 24 working hours.
What can be included in an MEP estimate?
Mechanical, electrical, plumbing and fire protection quantity takeoffs; labor and material extensions; equipment and supplier items; trade summaries; alternates; allowances; assumptions; exclusions; and estimate files in your format.
Can mechanical, electrical and plumbing be estimated separately?
Yes. Each trade can be measured and reported as its own package, or combined into one MEP estimate following your cost codes, bid packages, buildings, floors, zones or systems.
Can I hire a dedicated MEP estimator instead of paying per project?
Yes. Contractors with a steady bid pipeline can hire a dedicated construction estimator with MEP experience on a monthly model, working in your templates and review process.
Can MEP estimates be prepared before the design is complete?
Yes. Conceptual and design-development estimates use the available drawings, narratives and schedules, with the document stage, allowances and items still subject to design clearly stated.
How are addenda and drawing revisions handled?
Revised documents are compared with the estimate baseline, affected systems are re-measured, and the additions and omissions are recorded in the trade summaries for your review.
Who approves the final bid price?
You do. We prepare the agreed takeoffs and estimates from the supplied documents; your team confirms supplier pricing and labor conditions, sets markups and risk allowances, and authorizes the final bid.
Related services
Send your project requirements
Get a Fixed Quote for Your MEP Estimate
Send the drawings, specifications, required trades, pricing basis and bid date. You’ll receive a fixed quote within 24 working hours.