Data Centre Preconstruction Services Ireland
Optimar Precon supports Irish contractors with data centre preconstruction services built around the new grid rules: ARM4 bills of quantities, MEP takeoff and BIM coordination, including the on-site generation and storage now required on most new sites.
Coordinated from our UK office in the same time zone as Dublin, with estimates priced in EUR and measured to Irish rules.
Send Your Irish Tender Package
Share the site location, connection tier, trades and tender date. We will reply with scope, fee and programme.
Group-wide figures across all Optimar Precon services.
How the CRU Connection Policy Changes Data Centre Scope
The CRU decision of December 2025 sets new conditions for data centre grid connections. Most new sites now carry generation or storage as part of the build.
| Connection class | Maximum Import Capacity | What the site must provide |
|---|---|---|
| De minimis | Below 1 MVA | No generation requirement; locational constraints still apply |
| Tier A | 1 MVA to below 10 MVA | Behind-the-meter generation or storage meeting 100% of MIC (de-rated), registered in the Single Energy Market |
| Tier B | 10 MVA and above | Dispatchable on-site or nearby generation and/or storage meeting 100% of MIC (de-rated), separately connected and metered |
Sites of 1 MVA and above must also provide or procure new Irish renewable electricity covering at least 80% of annual demand over a six-year glide path. Tier B sites cannot ramp to full import capacity until their generation is delivered.
The Generation and Storage Scope Irish Tenders Now Include
Under the new rules, the power plant is part of the data centre. We estimate and model it as its own set of packages.
Dispatchable Generation
Gas engines or turbines sized to de-rated MIC, with fuel supply, exhaust, acoustic enclosures and controls.
Battery Energy Storage
BESS containers, inverters, transformers and protection, priced as a separate package.
Separate Grid Connection
The generation plant’s own connection, MV switchgear, export metering and protection.
Phased Ramp-Up
Import capacity released in steps as generation comes online, with phasing reflected in the estimate.
Renewable Interfaces
Connections for on-site or private-wire renewables where the 80% requirement is met locally.
Grid Code Compliance
Allowances for fault ride-through and other grid code requirements as standards develop.
Irish Measurement Rules and Standards
Estimates in EUR, measured and structured the way Irish quantity surveyors and contractors expect.
| Area | Irish approach | How we deliver it |
|---|---|---|
| Measurement | Agreed Rules of Measurement (ARM4) | ARM4 BoQs, or RICS NRM2 and client formats where specified |
| Electrical | I.S. 10101 National Rules for Electrical Installations | MEP scope priced to I.S. 10101 requirements |
| Grid interfaces | EirGrid (transmission) and ESB Networks (distribution) | Connection scope split by operator and connection class |
| BIM | ISO 19650 | Models and information exchanges to the project BIM requirements |
| Currency and units | EUR, metric | All rates, quantities and reports in EUR and SI units |
Locational constraints apply in parts of the network, so regional sites with available capacity are attracting more data centre proposals.
How Irish Projects Start With Us
Share Site and Tier
Send the location, expected MIC and connection class, with drawings and the tender date.
Agree Format and Fee
We confirm ARM4 or client format, packages, fee and programme in writing.
Deliver and Review
Your BoQ or models arrive with a scope log, including generation and storage assumptions.
Ireland data centre services: data centre estimating Ireland and data centre BIM modelling Ireland. Service details: construction estimating, quantity takeoff, BIM services, shop drawings, dedicated professionals.
Pricing a Tier A or Tier B Site?
Send the drawings and connection details, and we will scope the data centre and its generation packages together.
Irish Data Centre Projects Built Around Their Own Power
New Irish schemes increasingly pair the data centre with on-site generation and storage, in line with the new connection rules.
Data Centre With Integrated Power Plant
County Westmeath, Midlands- Scale
- 250 MW data centre proposal
- Status
- Pre-application planning stage
- Power
- 160 MW solid oxide fuel cells, battery storage and a 130 MW solar array
Preconstruction takeaway: fuel cells, battery storage and solar become major cost packages of their own, so they need separate estimates and interfaces with the data centre MEP.
Six-Building Regional Campus
Ennis, County Clare- Scale
- Six 33 MW buildings on 145 acres, with 200 MW from the grid
- Status
- Planning approval granted; completion targeted for 2030
- Power
- On-site gas turbines capable of running on green hydrogen
Preconstruction takeaway: regional sites with on-site turbines add gas supply, generation and grid connection scope that must be phased with each building.
Anonymized examples of publicly reported Irish projects, shown for market context. These are not Optimar Precon projects, and figures may have changed since the dates shown.
Ireland Data Centre Preconstruction: FAQs
What does the CRU connection policy mean for data centre construction?
Most new data centres of 1 MVA or more must provide generation or storage matching their import capacity, plus new renewable supply covering 80% of demand. That adds power plant, storage, metering and a separate grid connection to the construction scope.
What is the difference between Tier A and Tier B?
Tier A covers sites from 1 MVA to below 10 MVA and needs behind-the-meter generation or storage. Tier B covers 10 MVA and above and needs dispatchable generation or storage that is separately connected, metered and participating in the Single Energy Market.
Which stages of an Irish data centre project do you support?
Support can start at site selection with feasibility budgets, continue through planning and detailed design with BIM models, and run into tender and construction with measured bills and coordination.
Which Irish electrical standard do you price to?
Electrical scope is priced to I.S. 10101, the National Rules for Electrical Installations, with grid interface scope split between EirGrid and ESB Networks connections as appropriate.
Can you scope on-site renewables and private wire connections?
Yes. The physical works behind the renewable requirement, such as on-site solar, private wire cabling, substations and metering, can be measured and modelled. Power purchase agreements themselves are commercial contracts and sit outside our scope.
How do you work with Irish project teams?
Coordination runs from our UK office in the same time zone as Dublin, with named contacts, agreed review meetings and ISO/IEC 27001 certified handling of all project documents.
Ready for Ireland’s New Data Centre Rules?
Estimates and models that include generation, storage and grid scope from the first cost plan.