Ireland | Data Centre Preconstruction

Data Centre Preconstruction Services Ireland

Optimar Precon supports Irish contractors with data centre preconstruction services built around the new grid rules: ARM4 bills of quantities, MEP takeoff and BIM coordination, including the on-site generation and storage now required on most new sites.

Coordinated from our UK office in the same time zone as Dublin, with estimates priced in EUR and measured to Irish rules.

ARM4 & Client-Format BoQs
On-Site Generation Scope
ISO 19650 BIM Delivery
Same Time Zone as Dublin
Discuss Your Irish Data Centre Project →
Ireland Data Centre Projects

Send Your Irish Tender Package

Share the site location, connection tier, trades and tender date. We will reply with scope, fee and programme.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports GDPR-aligned data handling
ISO19650
BIM InformationUK BIM Framework compatible
The New Connection Rules

How the CRU Connection Policy Changes Data Centre Scope

The CRU decision of December 2025 sets new conditions for data centre grid connections. Most new sites now carry generation or storage as part of the build.

Connection classMaximum Import CapacityWhat the site must provide
De minimisBelow 1 MVANo generation requirement; locational constraints still apply
Tier A1 MVA to below 10 MVABehind-the-meter generation or storage meeting 100% of MIC (de-rated), registered in the Single Energy Market
Tier B10 MVA and aboveDispatchable on-site or nearby generation and/or storage meeting 100% of MIC (de-rated), separately connected and metered

Sites of 1 MVA and above must also provide or procure new Irish renewable electricity covering at least 80% of annual demand over a six-year glide path. Tier B sites cannot ramp to full import capacity until their generation is delivered.

New Packages to Price

The Generation and Storage Scope Irish Tenders Now Include

Under the new rules, the power plant is part of the data centre. We estimate and model it as its own set of packages.

Dispatchable Generation

Gas engines or turbines sized to de-rated MIC, with fuel supply, exhaust, acoustic enclosures and controls.

Battery Energy Storage

BESS containers, inverters, transformers and protection, priced as a separate package.

Separate Grid Connection

The generation plant’s own connection, MV switchgear, export metering and protection.

Phased Ramp-Up

Import capacity released in steps as generation comes online, with phasing reflected in the estimate.

Renewable Interfaces

Connections for on-site or private-wire renewables where the 80% requirement is met locally.

Grid Code Compliance

Allowances for fault ride-through and other grid code requirements as standards develop.

How We Price Irish Work

Irish Measurement Rules and Standards

Estimates in EUR, measured and structured the way Irish quantity surveyors and contractors expect.

AreaIrish approachHow we deliver it
MeasurementAgreed Rules of Measurement (ARM4)ARM4 BoQs, or RICS NRM2 and client formats where specified
ElectricalI.S. 10101 National Rules for Electrical InstallationsMEP scope priced to I.S. 10101 requirements
Grid interfacesEirGrid (transmission) and ESB Networks (distribution)Connection scope split by operator and connection class
BIMISO 19650Models and information exchanges to the project BIM requirements
Currency and unitsEUR, metricAll rates, quantities and reports in EUR and SI units
Greater DublinCorkLimerick and ShannonGalwayMidlands sitesRegional grid-ready locations

Locational constraints apply in parts of the network, so regional sites with available capacity are attracting more data centre proposals.

Getting Started

How Irish Projects Start With Us

01

Share Site and Tier

Send the location, expected MIC and connection class, with drawings and the tender date.

02

Agree Format and Fee

We confirm ARM4 or client format, packages, fee and programme in writing.

03

Deliver and Review

Your BoQ or models arrive with a scope log, including generation and storage assumptions.

Pricing a Tier A or Tier B Site?

Send the drawings and connection details, and we will scope the data centre and its generation packages together.

Send Your Project →
Irish Market Snapshot

Irish Data Centre Projects Built Around Their Own Power

New Irish schemes increasingly pair the data centre with on-site generation and storage, in line with the new connection rules.

Self-Powered Campus

Data Centre With Integrated Power Plant

County Westmeath, Midlands
Scale
250 MW data centre proposal
Status
Pre-application planning stage
Power
160 MW solid oxide fuel cells, battery storage and a 130 MW solar array

Preconstruction takeaway: fuel cells, battery storage and solar become major cost packages of their own, so they need separate estimates and interfaces with the data centre MEP.

Regional Campus

Six-Building Regional Campus

Ennis, County Clare
Scale
Six 33 MW buildings on 145 acres, with 200 MW from the grid
Status
Planning approval granted; completion targeted for 2030
Power
On-site gas turbines capable of running on green hydrogen

Preconstruction takeaway: regional sites with on-site turbines add gas supply, generation and grid connection scope that must be phased with each building.

Anonymized examples of publicly reported Irish projects, shown for market context. These are not Optimar Precon projects, and figures may have changed since the dates shown.

Frequently Asked Questions

Ireland Data Centre Preconstruction: FAQs

What does the CRU connection policy mean for data centre construction?

Most new data centres of 1 MVA or more must provide generation or storage matching their import capacity, plus new renewable supply covering 80% of demand. That adds power plant, storage, metering and a separate grid connection to the construction scope.

What is the difference between Tier A and Tier B?

Tier A covers sites from 1 MVA to below 10 MVA and needs behind-the-meter generation or storage. Tier B covers 10 MVA and above and needs dispatchable generation or storage that is separately connected, metered and participating in the Single Energy Market.

Which stages of an Irish data centre project do you support?

Support can start at site selection with feasibility budgets, continue through planning and detailed design with BIM models, and run into tender and construction with measured bills and coordination.

Which Irish electrical standard do you price to?

Electrical scope is priced to I.S. 10101, the National Rules for Electrical Installations, with grid interface scope split between EirGrid and ESB Networks connections as appropriate.

Can you scope on-site renewables and private wire connections?

Yes. The physical works behind the renewable requirement, such as on-site solar, private wire cabling, substations and metering, can be measured and modelled. Power purchase agreements themselves are commercial contracts and sit outside our scope.

How do you work with Irish project teams?

Coordination runs from our UK office in the same time zone as Dublin, with named contacts, agreed review meetings and ISO/IEC 27001 certified handling of all project documents.

Ready for Ireland’s New Data Centre Rules?

Estimates and models that include generation, storage and grid scope from the first cost plan.

Start Your Irish Project →
Scroll to Top