Dublin · Apartment blocks · Fingal housing schemes · Subcontractor packages

Construction Takeoff Services in Dublin

Dublin subcontractors price apartment blocks floor by floor and housing schemes house type by house type, often with several tenders due in the same week. Optimar Precon’s construction takeoff services in Dublin measure the quantities for you, set out by block, level and unit type, so your estimators can go straight to pricing.

  • Quantities split by block, floor and apartment type
  • House-type takeoffs for schemes in Fingal and the suburbs
  • Single-trade measurement for drylining, M&E, flooring and more

Dublin Takeoff Quote

Which trades do you need measured, and when does the tender close?

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO 19650Certified for BIM, plus ISO 9001 & 27001
Two kinds of Dublin job

Apartments in the City, Houses in Fingal

Each one needs measuring a different way.

79.8%share of Ireland’s 2025 apartment completions that were in Dublin
12,047apartments completed nationally, up 38.7% on 2024
1,900scheme houses in Fingal, more than any other council
18,308scheme houses nationally, half of all new homes

Central Statistics Office new dwelling completions, 2025.

How we measure Dublin work

Quantities in the Order You Build

On an apartment block, quantities are most useful split by core, floor and unit, so they match your programme and your valuations. On a scheme, they work best per house type, times the number of each. We set up every takeoff that way from the start, so the numbers are useful for buying and valuations as well as pricing.

Lvl

By level and core

Apartment quantities grouped to match your build sequence.

Type

By house type

Each type measured once and multiplied by its count.

Val

Ready for valuations

The same breakdown supports monthly applications for payment.

Quantity takeoff for a Dublin apartment development
Trades we measure

Takeoffs for Dublin Subcontractors

Pick one trade or the full set.

Drylining and ceilings

Partitions, linings and ceilings by apartment and corridor.

Takeoff Ireland →

Mechanical and electrical

Pipework, ductwork, cabling and fittings counted per floor.

MEP takeoff →

Concrete and frames

Slabs, columns, cores and reinforcement for multi-storey blocks.

Concrete takeoff →

Blockwork and brickwork

Walls, façades and openings for houses and low-rise blocks.

Masonry takeoff →
Platforms: BluebeamPlanSwiftCostXExcel
What arrives in your inbox

Quantities You Can Check Line by Line

Every number traceable to a drawing.

Excel quantity sheet

Laid out to your pricing template or to ARM4.

Marked-up drawings

Colour-coded PDFs showing what was measured.

Floor and unit split

Totals by block, level and apartment type.

House-type schedule

Quantities per type and for the whole scheme.

Query list

Drawing gaps and clashes noted for your RFIs.

Revision updates

Changes re-measured when new drawings are issued.

Quantities only, unless you also want them priced. See our Dublin estimating service.

Example scopes

What Dublin Firms Send Us

Three typical takeoff requests.

Example scope · Drylining

Two apartment blocks, 140 units

A drylining contractor needs partitions and ceilings measured per unit.

You send
Plans, sections, finishes schedule
You get
Quantities by unit and floor
Typical time
3–5 days
Example scope · Housing

Fingal scheme, six house types

A builder needs blockwork, roofing and groundworks for every type.

You send
House type drawings, site layout
You get
Per-type and total quantities
Typical time
4–6 days
Example scope · Electrical

Office fit-out, three floors

An electrical contractor needs containment, cabling and fittings counted.

You send
Electrical layouts, spec
You get
Counts and lengths by floor
Typical time
2–3 days

These are example scopes, not completed client projects. See finished work in our success stories.

Turnaround

Several Tenders, One Week

Upload

Send drawings by email or a cloud link.

Confirm

Fee and delivery date agreed for each tender.

Measure

Urgent tenders measured first, others queued behind.

Deliver

Quantities sent with mark-ups, ready to price.

FAQs

Construction Takeoff in Dublin: FAQs

Can you split quantities by floor and apartment?

Yes. Apartment takeoffs can be grouped by block, core, level and unit type to match your programme and valuations.

Do you measure one trade only?

Yes. Drylining, M&E, concrete, masonry, flooring or groundworks can each be measured on their own.

What if new drawing revisions arrive?

We re-measure the changes and show what moved, so you can update your price quickly.

Can you handle several tenders at once?

Yes. We agree a delivery date for each one and measure the most urgent first.

How do I send drawings?

Email support@optimarprecon.com or call +44 74 2787 2167. Large sets can be shared by cloud link.

Tenders Piling Up?

Send the drawings for the most urgent one. We’ll confirm a fee and date the same day.

Scroll to Top