BIM Services in Ireland
Ireland’s public works contracts are bringing in BIM in stages. Since January 2026, contractors and supply chains on public projects above €10m are expected to deliver BIM, and the threshold keeps falling. Optimar Precon is certified to ISO 19650-1 and gives Irish contractors, subcontractors and design teams the models and information management these jobs require.
- Models, file naming and status codes set up to ISO 19650
- Uniclass 2015 classification and IFC exchange as the framework expects
- Coordinated architectural, structural and MEP models for public and private work
Irish BIM Enquiry
Attach the employer’s information requirements, if you have them, plus drawings or models. We’ll reply with a plan and a fixed fee.
The Threshold Drops Every Few Months
How BIM requirements are being extended across Irish public works contracts.
Capital Works Management Framework BIM guidance. Always check the BIM requirements in your own tender documents.
Meet the BIM Clauses Without Building a BIM Department
Many Irish contractors and M&E subcontractors are meeting formal BIM requirements for the first time on public jobs. You need a BIM execution plan, ISO 19650 file naming, classified models and coordination reports, often within weeks of award. We provide that capacity while your team learns the process.
BIM execution plan support
We help draft the plan in response to the employer’s requirements, ready for your review.
Uniclass on every object
Elements and systems classified to Uniclass 2015, so the information can be used later.
Open exchange
IFC exports checked before they go to the common data environment.
Schools, Hospitals, Housing and Commercial
The BIM work Irish teams hand us, and where to read more.
Architectural and structural models
Revit models built from the design team’s drawings, at the level of information the contract asks for.
BIM modeling →MEP models for M&E contractors
Ductwork, pipework, containment and plant modelled for coordination and installation.
MEP BIM →Clash detection and coordination
Federated models checked in Navisworks, with issues tracked until they’re closed.
Clash detection →Information management
Naming audits, delivery plans and model checks, so your files are accepted by the client’s CDE.
BIM coordination →Existing buildings
Scans of schools, hospitals and offices turned into models for refurbishment projects.
Point cloud to BIM →Data centre BIM
Dense MEP and electrical coordination for Ireland’s data centre projects.
Data centre BIM →Records an Irish Public Client Will Check
Alongside the models, each package includes the information management records.
Responsibility matrix
Who produces what, at which stage, for each model and drawing.
Delivery plans
Task and master information delivery plans kept current as the job moves.
Naming and status audit
Every file checked against the project’s naming and suitability codes.
Clash reports
Issues by zone and trade with owner and due date, ready for the coordination meeting.
Asset data
Equipment parameters filled in for handover to the facility manager.
Secure handling
Public sector data handled under our ISO/IEC 27001 and 27701 certified controls.
Optimar Precon is certified to ISO 19650-1:2018, ISO 9001:2015, ISO/IEC 27001:2022 and ISO/IEC 27701:2019. Design responsibility stays with the appointed design team.
Typical Irish BIM Requests
Common requests from Irish contractors and design teams.
School building for a main contractor
A contractor has won a €14m school and must meet BIM requirements for the first time.
- You send
- Employer’s requirements, design drawings
- You get
- BEP support, models, clash reports
- Typical time
- Set-up in 2 weeks, then ongoing
MEP model for a hospital extension
An M&E subcontractor needs its services modelled and coordinated with the structure.
- You send
- M&E design, structural model
- You get
- MEP model, coordination reports
- Typical time
- 4–6 weeks
Scan to BIM for a refurbishment
A design team needs an accurate model of an existing office block before redesign.
- You send
- Point cloud, photos
- You get
- Revit model of the existing building
- Typical time
- 2–3 weeks
These are example scopes, not completed client projects. For documented ISO 19650 work, see our UK university ISO 19650 project.
Your First Weeks on a BIM Job
Read the requirements
We go through the employer’s requirements and list what you must deliver.
Plan and set up
BEP support, naming rules, templates and CDE folders ready.
Model and coordinate
Models built and clash cycles run ahead of each coordination meeting.
Hand over
Models, asset data and records issued in the agreed formats.
BIM in Ireland: FAQs
Can you meet the BIM requirements in a CWMF public works contract?
Yes. We work to the client’s Exchange Information Requirements, prepare the BIM Execution Plan content you need, and deliver models and data to ISO 19650 with Uniclass 2015 classification and IFC exports.
Do we need our own BIM team to bid for BIM projects?
No. Many Irish contractors and consultants use us as their modelling and coordination team, while their own staff stay responsible for the design and the client relationship.
Which software do you use?
Mainly Revit and Navisworks, with AutoCAD for 2D outputs. We exchange IFC files with teams using ArchiCAD, Tekla or other platforms.
Can you model an existing building for a retrofit or extension?
Yes. We build models from point cloud scans, surveys or legacy drawings, to the level of detail the project needs.
How do we start?
Email support@optimarprecon.com or call +44 74 2787 2167 with the project stage, drawings and any information requirements. We reply with a scope, programme and fixed fee.
Related services
BIM Clause in Your Next Tender?
Send the requirements. We’ll tell you what they mean for your team and what we can take on.