Dublin · Apartment blocks · Public buildings · MEP coordination · ISO 19650

BIM Services in Dublin

Most of the apartments built in Ireland go up in Dublin, and every multi-storey block brings risers, plant rooms and stacked services that have to line up floor after floor. Public clients in the city are also asking contractors for BIM on ever smaller contracts. Optimar Precon provides BIM services in Dublin: Revit modelling, clash detection and ISO 19650 information for contractors, M&E firms and design practices.

  • Apartment and mixed-use blocks modelled with typical floors reused
  • Riser, plant room and basement car park coordination
  • Information delivery set up for public works BIM clauses

Dublin BIM Enquiry

Tell us the building type, number of storeys and the disciplines to model.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO 19650Certified for BIM, plus ISO 9001 & 27001
Dublin builds upwards

The Capital of Irish Apartment Building

Taller buildings mean more services stacked on top of each other, and more to coordinate.

~80%of Ireland’s new apartments in 2025 were completed in Dublin
9,623apartments finished across the four Dublin councils that year
€10mpublic contracts where contractors now carry BIM duties
€1mwhere that threshold is heading under the public works roadmap

Central Statistics Office and Capital Works Management Framework figures, 2025–2026.

Where Dublin jobs go wrong

Stacked Services, Tight Ceilings

Dublin apartment schemes work to low floor-to-floor heights to fit the storeys planning allows. That leaves little room for drainage falls, ventilation ducts and sprinkler mains in corridor ceilings. We coordinate one typical floor in detail, repeat it up the building, and then solve the floors that differ: podiums, transfer levels, penthouses and basements.

Riser

Risers that line up

Shafts checked floor by floor so services drop straight through.

Clg

Corridor ceiling zones

Drainage falls, ducts and sprinklers fitted into the depth available.

Base

Basements and podiums

Car park ventilation, attenuation tanks and transfer structures coordinated.

BIM coordination of a Dublin apartment block
Dublin BIM work

BIM for Dublin’s Building Types

From docklands offices to suburban apartment schemes.

Apartment schemes

Architecture, structure and MEP for multi-storey residential blocks.

BIM modelling →

MEP coordination

Ventilation, drainage, sprinklers and electrical containment clash-checked.

MEP BIM →

Office retrofits

Existing Georgian and modern offices modelled from scans before refurbishment.

Point cloud to BIM →

Public buildings

Schools, healthcare and civic projects delivered to the client’s information requirements.

BIM services Ireland →

Clash detection

Federated models tested by floor, with issues tracked to closure.

Clash detection →

Data centre support

Hall and energy centre models for campuses around the city.

Data centre BIM →
Platforms: RevitNavisworksACCIFC
What you receive

Outputs a Dublin Site Team Can Use

Built for contractors, design teams and certifiers.

Typical floor model

One coordinated floor, repeated and adjusted for each level.

Riser and shaft drawings

Sections and plans showing every service in each shaft.

Ceiling zone sections

Corridor sections proving services fit the ceiling depth.

Clash report by level

Issues grouped by floor, with owners and dates.

Builder’s work drawings

Openings and sleeves for each floor slab and wall.

Records for certification

Model-based drawings to support the documents your certifier requests.

We model your design team’s work. Design, compliance and certification remain with your appointed professionals.

Example scopes

Typical Dublin BIM Requests

Three kinds of job Dublin teams send us.

Example scope · Residential

Eight-storey apartment block

An M&E contractor needs services coordinated before first fix starts.

You send
Design drawings, architecture model
You get
MEP model, riser drawings
Typical time
4–7 weeks
Example scope · Public works

School extension to ISO 19650

A contractor needs models and information delivered to the client’s requirements.

You send
Design, information requirements
You get
Federated model, IFC, records
Typical time
5–8 weeks
Example scope · Retrofit

City-centre office refurbishment

A design team needs the existing building modelled from a laser scan.

You send
Point cloud, old drawings
You get
Existing-conditions Revit model
Typical time
2–4 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

Floor by floor

How We Model a Dublin Block

Set up

Levels, grids and your naming standard agreed first.

Typical floor

One floor fully coordinated and signed off with you.

Special floors

Ground, podium, roof and basement levels resolved.

Issue for site

Drawings and models released level by level.

FAQs

BIM Modelling in Dublin: FAQs

Do you model full apartment blocks or just services?

Either. We can model architecture, structure and MEP together, or add MEP to an architect’s existing model.

How do you handle repeated floors?

We coordinate one typical floor in detail, repeat it, then resolve the floors that differ such as podiums, penthouses and basements.

Can you meet a Dublin public client’s BIM requirements?

Yes. We work to the client’s information requirements and deliver to ISO 19650 with IFC exports and the agreed naming.

Do you visit Dublin sites?

No. We work remotely from drawings, models and scans. Reviews take place online, and our UK office in Chertsey is available for meetings.

How do I get a price?

Email support@optimarprecon.com or call +44 74 2787 2167 with the drawings and programme. We send a fixed fee and timeline.

Dublin Block Going to Site Soon?

Send the drawings and the programme. We’ll come back with a scope and fixed fee.

Scroll to Top