Ireland | Data Centre BIM and Coordination

Data Centre BIM Modelling Services Ireland

Optimar Precon provides data centre BIM modelling services in Ireland for contractors and design teams: coordinated Revit models of the data halls, the on-site power plant and the battery storage compound that Irish connection rules now require.

Models are delivered to I.S. EN ISO 19650 and organised by energisation phase, so each stage of the campus can be coordinated, built and handed over in turn.

Data Hall & Power Plant Models
Phased Models by Energisation
I.S. EN ISO 19650 Delivery
Same Time Zone as Dublin
Discuss Your Irish BIM Requirements →
Ireland Data Centre BIM

Send Your BIM Brief

Tell us about the campus layout, power plant scope and exchange dates, and we will propose a modelling team and schedule.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports GDPR-aligned data handling
ISO19650
BIM InformationUK BIM Framework compatible
The Whole Campus

Modelling the Data Centre and Its Power Plant Together

On an Irish data centre, the generation plant and storage compound sit beside the data halls. Coordinating them in one federated model prevents clashes at the boundaries.

Campus zoneModelling focusCoordination risk we check
Data hallsCooling, power distribution and containmentBusway, cable tray and pipework congestion
Electrical roomsHV and LV switchgear, UPS and transformersWorking clearances and equipment replacement routes
Generation plantGas engines or turbines, exhaust stacks, fuel systemsStack heights, access and maintenance zones
Battery storage compoundBESS containers, inverters, transformersSeparation distances and fire access routes
Connection corridorsGas pipeline, export cables and grid substationCrossings between gas, power and drainage routes
Renewable interfacesSolar arrays or private-wire connectionsCable routes and point-of-connection equipment
Phased Models

Phased Models for Phased Energisation

Irish data centres are often energised in steps as generation comes online. The model is set up so every phase can be coordinated and recorded on its own.

Phase-Based Model Structure

Models split by phase, so each energisation stage can be issued, coordinated and approved separately.

Capped Connections

Future connection points, valves and spare ways modelled so later phases tie in cleanly.

Future Tie-In Zones

Space reserved for later plant, cabling and pipework, protected in the coordination model.

As-Built by Phase

Each completed phase recorded as built before the next phase starts.

From Planning to Handover

Data Centre Models at Each Irish Project Stage

StageModel deliverablePurpose
PlanningMassing models, site layouts and visualisationsSupports planning drawings and environmental assessment inputs
Detailed designCoordinated discipline modelsResolves clashes between data halls, plant and connection routes
ConstructionFabrication and installation modelsSupports prefabricated plant, risers and pipework
HandoverAs-built models with asset dataGives the operator verified records for each phase

Ireland adopts ISO 19650 as I.S. EN ISO 19650 through NSAI. Optimar Precon is certified to ISO 19650 for BIM information management and to ISO/IEC 27001 for information security.

What We Deliver

Ireland Data Centre BIM Deliverables

Federated Campus Model

Data halls, power plant, BESS and corridors in one coordination model.

Revit M&E Models

Electrical, mechanical and fire protection models for each building.

Power Plant Models

Generation sets, stacks, fuel systems and BESS compound layouts.

Clash Reports

Navisworks clash tests with issues tracked to closure.

Planning Support Models

Massing and layout models for planning submissions.

Phased As-Builts

Verified as-built models and asset data for each energisation phase.

Coordinating a Data Centre With Its Own Power Plant?

Send the current models and site layout, and we will scope the coordination for the data halls and plant together.

Send Your Models →
Frequently Asked Questions

Ireland Data Centre BIM Modelling: FAQs

Why model the power plant with the data centre in Ireland?

Most new Irish data centres need on-site generation or storage, which sits beside the data halls. Modelling both in one federated model catches clashes between plant, cable routes, gas pipework and access roads before construction.

Can you model battery storage compounds?

Yes. BESS containers, inverters, transformers and cable routes are modelled with separation distances and fire access routes, so the compound layout can be checked against the rest of the campus.

How do you handle phased energisation in the model?

Models are split by phase, with capped connections and reserved tie-in zones for later stages. Each phase is coordinated, issued and recorded as built on its own.

Can BIM models support Irish planning applications?

Yes. Massing models, site layouts and visualisations from the BIM model can support planning drawings and environmental assessment inputs, and are carried forward into detailed design.

Is your BIM delivery aligned with I.S. EN ISO 19650?

Yes. Ireland adopts ISO 19650 as I.S. EN ISO 19650, and Optimar Precon is certified to ISO 19650 for BIM information management.

Which software and file formats do you model in?

Models are built in Revit and coordinated in Navisworks, with exchanges through Autodesk Construction Cloud or the client’s common data environment and IFC exports for other platforms.

Coordinate the Whole Irish Campus

Data halls, power plant and grid connections, modelled and coordinated together.

Send Your BIM Brief →