Construction Estimating Services in Dublin
In Dublin, whether a scheme goes ahead often depends on the cost per apartment. Developers need numbers they can take to funders, and contractors need tender prices that hold up when the bill is checked. Optimar Precon provides construction estimating services in Dublin: cost plans, priced bills and tender estimates for developers, main contractors and subcontractors.
- Cost per unit type for apartment and mixed-use schemes
- Priced bills for main contract and subcontract tenders
- Refurbishment and fit-out budgets for city buildings
Dublin Estimate Request
What needs pricing, how far is the design, and when is the number due?
A Lot of Building to Price
Dublin output in 2025, and what it means for estimators.
Central Statistics Office and Revenue figures, 2025.
Cost Per Apartment, Not Just a Total
A single total doesn’t tell a developer which apartment types make money. We split the cost of each scheme into units, shared areas, basement and external works, so you can see the cost of each one-, two- and three-bed type and test changes before the design is fixed.
Cost by unit type
Each apartment type priced with its share of common areas.
Options compared
Frame, façade and basement choices priced side by side.
Funder-ready layout
Elemental summaries that lenders and investors can follow.
Estimates for Every Stage of a Dublin Job
From site appraisal to subcontract tender.
Development appraisals
Early cost plans for site purchases and planning applications.
Construction estimating →Main contract tenders
Full tender estimates with preliminaries and risk priced.
Bid estimating →Bills of quantities
BoQs measured to ARM4 for tendering and cost control.
BoQ estimation →M&E package pricing
Mechanical and electrical estimates for subcontractors.
MEP estimating →Refurbishment and fit-out
Budgets for office floors, retail units and older buildings.
Estimating Ireland →Value engineering
Cost-saving options priced against the base design.
Value engineering →A Number You Can Explain
Made to be checked by a director, a funder or a client’s QS.
Elemental summary
Costs grouped by building element with rates per square metre.
Unit cost table
Cost for each apartment or unit type on residential jobs.
Measured quantities
Backed by marked-up drawings for checking.
Assumptions list
Every assumption written down where the design is incomplete.
Exclusions
Items outside the price stated plainly.
VAT shown separately
Net and gross figures so the totals are clear.
We prepare the estimate. Your team decides margin and submits the price.
Common Dublin Pricing Jobs
Three requests we see from Dublin teams.
120-unit apartment scheme
A developer needs a cost per unit type before a funding meeting.
- You send
- Planning drawings, schedule
- You get
- Cost plan, unit cost table
- Typical time
- 1–2 weeks
Main contract for a mixed-use block
A contractor needs a full tender estimate on a tight closing date.
- You send
- Tender package
- You get
- Priced BoQ, risk list
- Typical time
- 2–3 weeks
Georgian building conversion
An owner needs a budget to convert upper floors to apartments.
- You send
- Survey, proposed drawings
- You get
- Budget estimate, exclusions
- Typical time
- 1 week
These are example scopes, not completed client projects. See finished work in our success stories.
From Drawings to a Dublin Price
Brief
Drawings and deadline received; fee and date confirmed.
Measure
Quantities taken off and queries raised early.
Price
Current Irish rates applied, with your own rates where supplied.
Walk-through
Estimate reviewed with you online before it goes out.
Construction Estimating in Dublin: FAQs
Can you show the cost of each apartment type?
Yes. We split the scheme cost into unit types, shared areas, basement and external works, so each one-, two- and three-bed type has its own cost.
Will a funder accept your cost plan?
Our cost plans use an elemental layout with quantities, rates and assumptions set out, which is what funders usually review. Check any specific format your funder needs.
Do you price refurbishment of older Dublin buildings?
Yes. We price from surveys and proposed drawings, and list the allowances for unknowns that come with older buildings.
Which rates do you use?
Current Irish labour, plant and material rates, or your own rates and supplier quotes when you provide them.
How quickly can you turn round a Dublin estimate?
Email support@optimarprecon.com or call +44 74 2787 2167 with the drawings and deadline. Small budgets can take days; full tenders are planned around your closing date.
Related services
Need a Dublin Number This Week?
Send the drawings and your deadline. We’ll confirm a fee and delivery date.