Ireland | Data Centre Cost Estimating

Data Centre Estimating Services Ireland

Optimar Precon provides data centre estimating services in Ireland for main contractors, M&E contractors and developers: ARM4 bills of quantities, phase-by-phase cost plans and priced packages for the on-site power plant that most new Irish data centres now need.

Rates are priced in EUR with Irish labour rules, VAT treatment and tender price escalation built in, so your numbers hold up under an Irish quantity surveyor’s review.

ARM4 BoQs in EUR
Power Plant & BESS Pricing
Phase-by-Phase Cost Plans
Sectoral Employment Order Rates
Request an Irish Data Centre Estimate →
Ireland Data Centre Estimates

Send Your Irish Tender Documents

Share the site, connection class, trades and tender date. We will confirm scope, fee and delivery date.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports GDPR-aligned data handling
ISO19650
BIM InformationUK BIM Framework compatible
Pricing the Power Plant

How We Measure and Price On-Site Generation and Storage

Under Ireland’s connection rules, generation and storage can rival the data halls in value. Each item is measured and priced on its own basis.

PackageTakeoff unitWhat we captureTypical cost basis
Gas engines or turbinesEachRating, de-rated output, enclosures, exhaust stacksVendor quote + installation labour
Battery energy storage (BESS)Each container / MWhContainers, inverters, transformers, fire separationVendor quote + civils and cabling
Gas supply connectionLinear metre + eachPipeline route, above-ground installation, meteringNetwork operator charges + mechanical works
Generation grid connectionEach + linear metreMV/HV switchgear, export metering, protection, cable routeEquipment quotes + civils and cabling
Fuel and backup systemsEach / litreStandby fuel storage, day tanks, polishingMaterial + labour
Plant civilsm² / m³Plinths, bunds, acoustic walls, access roadsARM4-measured rates

Generation packages are estimated separately from the data halls, so they can be procured, programmed and approved as their own contracts.

Irish Pricing Rules

What Makes an Irish Data Centre Estimate Different

Irish rates, taxes and escalation differ from UK and US practice. We build them into the estimate from the start.

Sectoral Employment Orders

Labour rates checked against the construction and electrical contracting Sectoral Employment Orders that set minimum pay and pension terms.

VAT Treatment

Costs shown net of VAT, with the 13.5% construction services rate or other applicable rates applied in line with the client’s reporting.

Tender Price Escalation

Escalation to the tender and construction period referenced to Irish tender price indices such as the SCSI index.

Measurement to ARM4

Bills measured to the Agreed Rules of Measurement, so Irish quantity surveyors can check them without re-measuring.

Phased Import Capacity

Cost plans split by phase where import capacity ramps up as generation comes online.

Renewable Supply Interfaces

Connections for private-wire or on-site renewables priced where the 80% renewable requirement is met locally.

Cost Planning by Stage

Irish Data Centre Estimates From Planning to Tender

Irish data centres often spend a long time in planning. Cost plans need to stay current through that period.

StageEstimate deliverableWhy it matters in Ireland
Site selectionOrder-of-cost estimate per MW and per site optionCompares constrained and regional sites with different generation needs
Planning applicationElemental cost plan including power plantGeneration and storage scope is fixed early in the planning submission
Post-planning designUpdated cost plan with escalationAccounts for time spent in planning and any conditions attached
TenderARM4 bills of quantities by packageData halls, M&E and power plant tendered as separate packages
ConstructionPhase re-estimates and change pricingImport capacity and generation delivered in steps
What We Deliver

Ireland Data Centre Estimating Deliverables

ARM4 Bills of Quantities

Measured BoQs for main contract, M&E and power plant packages.

Elemental Cost Plans

Cost plans from site selection through planning to tender, in EUR.

Power Plant Estimates

Gas generation, BESS and grid connection packages priced in full.

Tender Analysis

Levelling of M&E and power plant subcontractor returns.

Cash Flow by Phase

Expenditure profiles aligned to each energisation phase.

Change Pricing

Variations priced from measured quantities and agreed rates.

Pricing a Tier B Site?

Send the drawings and connection details, and we will scope the data centre and its power plant estimate together.

Send Your Drawings →
Frequently Asked Questions

Ireland Data Centre Estimating: FAQs

How do you estimate on-site generation for an Irish data centre?

Gas engines or turbines are counted by rating and de-rated output, with enclosures, exhaust, fuel and controls. Battery storage is priced per container or MWh, and the gas supply and separate grid connection are measured as their own packages.

Do your Irish estimates comply with Sectoral Employment Orders?

Yes. Labour rates are checked against the construction and electrical contracting Sectoral Employment Orders, which set minimum pay and pension terms for workers on Irish sites.

How do you handle escalation on Irish data centre projects?

Estimates are escalated to the tender and construction period using Irish tender price indices such as the SCSI index, which matters where projects spend a long time in planning.

Are Irish estimates shown with or without VAT?

Costs are shown net of VAT, with the 13.5% rate for construction services, or other applicable rates, applied separately in line with the client’s reporting, so the construction cost is clear.

Can you split the cost plan by energisation phase?

Yes. Where import capacity ramps up as generation comes online, the cost plan and cash flow are split by phase so each stage can be funded and approved.

Do you measure Irish bills of quantities to ARM4?

Yes. Bills for data halls, M&E and power plant packages are measured to the Agreed Rules of Measurement (ARM4), so Irish quantity surveyors can check them directly.

Price Irish Data Centres With Confidence

ARM4 BoQs and power plant packages, priced to Irish rates and phasing.

Send Your Tender →
Scroll to Top