Construction Estimating Services Across Ireland
Irish tenders have their own rules. Bills of quantities follow ARM4, public jobs run on the Public Works Contracts, and most building work carries 13.5% VAT. Optimar Precon prices Irish tenders in euro, item by item, in the format your client issued, for main contractors, subcontractors and developers.
- Bills of quantities measured and priced to ARM4
- Public works tender pricing with risk and inflation allowances shown openly
- Cost plans for developers, from feasibility to pre-tender
Irish Estimate Request
Tell us the client (public or private), the contract form and the closing date. We’ll reply with a fee and a programme.
A Busier Market, and More Tenders to Price
Key figures that shape an Irish estimate.
CSO completions data and Irish pricing conventions. More homes being built means more tenders to price, and the estimating desk is usually where the queue forms.
Fixed-Price Tenders Need Visible Risk
Public works contracts put much of the risk on the contractor. If the risk sits inside the rates, nobody can see it at the bid review. We price measured work, preliminaries and risk as separate lines, so your directors can decide what to carry and what to qualify.
Measured to the rules
Quantities and item descriptions that follow ARM4, so the bill matches what the QS expects.
Preliminaries from the programme
Site staff, welfare, cranes, scaffolding and insurances priced against the contract period.
Risk register priced
Ground, design, inflation and programme risks listed with an allowance for each.
From Bill of Quantities to Board Approval
The estimating work Irish companies outsource most.
ARM4 bills of quantities
Bills prepared from drawings and specifications, or your issued bill checked and priced.
BOQ estimation →Main contractor tenders
Full tender pricing for schools, housing, healthcare and commercial buildings.
Bid estimating →M&E subcontract pricing
Mechanical and electrical packages priced from supplier quotes and installation outputs.
MEP estimating →Developer cost plans
Elemental cost plans from feasibility to pre-tender, updated at each design stage.
Cost planning →Frame and structure
Concrete, steel and timber frame options priced side by side.
Structure estimating →Data centre estimating
Electrical, cooling and on-site power packages for Irish data centre projects.
Data centre estimating →What Your Bid Review Will See
Everything laid out for an Irish tender adjudication meeting.
Euro summary
Totals by section, with preliminaries, overheads, profit and VAT each on their own line.
Rate build-ups
Labour, plant and materials behind every major rate, open to challenge.
Supplier comparison
Quotes for each package levelled on scope, with gaps flagged.
Risk register
Each risk with an allowance, so the final margin is a clear decision.
Tender queries
Gaps and conflicts listed for the clarification period.
Qualifications
Assumptions and exclusions written up for your tender letter.
We prepare the pricing. Your company sets the final figure and signs the tender.
Three Typical Irish Pricing Jobs
One public, one private, one subcontract.
Priced bill for a primary school
A contractor needs the issued ARM4 bill priced, preliminaries built and risks listed before closing.
- You send
- Bill, drawings, contract conditions
- You get
- Priced bill, risk register, letter
- Typical time
- 5–8 working days
Cost plan for an apartment scheme
A developer needs an elemental cost plan to test viability before lodging for planning.
- You send
- Design drawings, accommodation schedule
- You get
- Cost plan, cost per unit and per m²
- Typical time
- 4–6 working days
Electrical package for a nursing home
An electrical contractor needs a priced tender from the specification and layouts.
- You send
- Spec, layouts, supplier quotes
- You get
- Priced package, labour build-up
- Typical time
- 3–5 working days
These are example scopes, not completed client projects. See also our sample deliverables.
How an Irish Tender Runs With Us
Documents in
Bill, drawings, specification and contract conditions shared.
Queries out
Gaps listed early for the clarification deadline.
Pricing
Rates built up, quotes levelled, preliminaries and risk priced.
Review pack
Summary, risks and qualifications ready before your bid review.
Estimating in Ireland: FAQs
Do you measure to ARM4?
Yes. Bills of quantities can follow the Agreed Rules of Measurement (ARM4), or the format in the tender documents if it differs.
Which rates do you use for Irish projects?
We build rates from current Irish labour, plant and material costs, and we use your own rates or supplier quotes where you provide them.
Can you price a public works tender?
Yes. We price the bill or schedule in the tender, list the risks and allowances behind the price, and keep VAT at 13.5% on construction separate from the net figures.
How fast can you turn an estimate round?
Small packages often take a few days; larger tenders are planned around your closing date, with priority trades sent first.
How do I send a tender?
Email support@optimarprecon.com or call +44 74 2787 2167 with the documents and closing date. We confirm scope, fee and delivery date before starting.
Related services
Tender Closing Soon?
Send the documents. You’ll have a fee and a pricing plan within one working day.