UAE · AED rate build-ups · Tender pricing · Variations

Construction Estimating Services in the UAE

Quantities are only half an estimate. The bid is won or lost on the rates. Optimar Precon prices UAE work in AED, with every rate built up from labour, plant and materials, preliminaries priced line by line, and 5% VAT shown on its own line.

  • Rate build-ups your estimator can audit, item by item
  • Supplier quotes levelled and compared before they go into the price
  • Emirate-specific costs (logistics, authority fees, accommodation) flagged separately

UAE Estimate Request

Tell us the emirate, the project type and the closing date.

Fixed quote within 24 working hours, depending on complexity. NDA available on request.

24 hrsFixed quote turnaround
3,270+Projects completed
3 officesDallas, Chertsey UK, New Delhi
ISO9001 & 27001 certified
Where bids are won

From Quantity to Rate, With Nothing Hidden

Two contractors can measure the same quantities and still end up far apart on price. The gap is in the rates, the preliminaries and the risk allowance. We show how every rate is built, so your team can adjust a figure with confidence instead of guessing.

L+P+M

Rates built from the ground up

Gang sizes, output per day, plant hours, material with waste, and overhead, all shown for each major rate.

3×

Supplier quotes levelled

Quotes for each major package compared on the same scope, with exclusions and gaps highlighted.

Risk

Risk priced, not buried

A short risk register with an allowance against each item, so management decides the final margin.

Estimator building up AED unit rates for a UAE tender
What we price

Estimates for Contractors, Subcontractors and Developers

Six estimating jobs UAE companies hand us, with the service page behind each.

Main contractor tenders

Full priced bids: measured work, preliminaries, provisional sums and the summary your board signs off.

Bid estimating →

Priced bills of quantities

Your client’s BOQ, or one we prepare, priced line by line with rate analysis for the high-value items.

BOQ estimation →

MEP subcontract packages

HVAC, plumbing, drainage, electrical and fire systems priced from supplier quotes and installation outputs.

MEP estimating →

Frame and structure

Concrete, rebar and formwork priced with the pour sequence and formwork reuse built into the rates.

Concrete estimating →

Variations and change orders

Instructed changes priced with backup, using contract rates where they apply and new rates where they don’t.

Change pricing →

Savings options

Alternative materials and methods priced side by side, so the client can choose before the contract is signed.

Value engineering →
Delivered in: ExcelCostXYour client’s BOQ formatPDF summary
Inside the estimate

What a UAE Estimate File Contains

Everything your commercial manager needs at the tender review meeting.

AED summary sheet

Totals by trade and section, with preliminaries, overhead, profit and VAT each on their own line.

Rate analysis

Build-ups for the items that make up most of the value, so they can be challenged and changed.

Preliminaries schedule

Staff, site facilities, equipment, insurances and bonds, priced against the programme length.

Supplier comparison

Side-by-side quote tables with scope gaps and the figure we carried.

Qualifications and exclusions

A ready-to-send list of assumptions for your tender letter.

Open queries

Items priced on assumption, listed so they can be raised before the bid closes.

We prepare the estimate. Your team sets the final margin and signs the tender.

Proof and example scopes

Priced Under Deadline Before

A published bid we supported, plus three UAE estimating requests in the shape they usually arrive.

Multi-trade bid estimate prepared in 96 hours
Success story · General contractor · US

A multi-trade bid priced in four days

The contractor came to us with the bid already half done. Each trade was priced and handed over as soon as it was ready, every assumption was written down, and the substitutions we proposed were accepted by the client.

96 hRequest to final price
14Written assumptions
AllProposed substitutions accepted
Read the case study →
Example scope · Multi-emirate

Retail roll-out across three emirates

A fit-out contractor prices six store fit-outs in Dubai, Abu Dhabi and Ajman, with logistics priced separately for each location.

You send
Store drawings, finishes schedule
You get
Per-store estimate, combined summary
Typical time
5–7 working days
Example scope · Variations

Change pricing for an MEP subcontractor

Twelve site instructions on a live job need pricing with backup before the next payment application.

You send
Instructions, contract rates, drawings
You get
Priced variations with build-ups
Typical time
3–5 working days
Example scope · Rate check

Second opinion on a tender price

An estimating manager wants an independent check of the 20 biggest rates before submission.

You send
Priced BOQ, key quotes
You get
Rate review with comments
Typical time
2–3 working days

The three cards are typical requests, not completed client projects. See also our sample deliverables.

Working together

How a UAE Tender Gets Priced With Us

Documents reviewed

We read the tender, flag missing information and confirm the scope and fee with you.

Quantities confirmed

We measure, or check the BOQ you were issued, so the pricing starts from reliable numbers.

Rates and quotes

Rates are built up, supplier quotes are levelled and the preliminaries are priced against the programme.

Review pack

Summary, risks and exclusions sent ahead of your internal tender review.

FAQs

UAE Estimating FAQs

Do you price in AED and include VAT?

Yes. All estimates are in AED, with 5% VAT shown as its own line so it can be adjusted for the contract terms.

Where do your UAE rates come from?

From build-ups using labour outputs, plant and material costs, plus supplier quotes you provide or that we request on your behalf. Every rate can be traced, so your team can replace any input with its own figure.

Can you price variations on a live project?

Yes. Send the instruction, the contract rates and the drawings. We price each change with backup that is ready for your payment application.

Which emirates do you cover?

All seven: Dubai, Abu Dhabi, Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah. Logistics, accommodation and authority costs are set up for the project’s location. See our Dubai and Abu Dhabi pages for more on those markets.

How much does a UAE estimate cost, and how do I get a quote?

Each tender gets a fixed fee based on the size of the document set and the deadline, quoted within 24 working hours, depending on complexity. Teams with a steady flow of tenders can hire a dedicated estimator by the month. Send your documents through the form, email support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA).

Need a Price You Can Defend?

Send the tender pack. You’ll receive a fixed fee and delivery date within 24 working hours, depending on complexity.

Scroll to Top