Abu Dhabi · Government tenders · Estidama · Design and build

Construction Estimating Services in Abu Dhabi

Abu Dhabi tenders are often issued by government and semi-government clients, with a BOQ already written, sustainability requirements attached and strict submission rules. Optimar Precon prices the issued BOQ in the client’s own format and adds the Estidama, bond and insurance costs that are easy to miss.

  • Every line of the issued BOQ priced, with no reformatting
  • Estidama Pearl requirements costed as their own allowance
  • Bonds, guarantees and insurances priced from the contract terms

Abu Dhabi Tender Pricing

Tell us the client type, the closing date and whether a BOQ was issued. We reply with a fee the same working day.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO9001 & 27001 certified
Before you price

Four Numbers Behind an Abu Dhabi Bid

Facts that change what goes into an Abu Dhabi tender price.

2,571building permits issued in Q2 2025 alone
2 PearlEstidama minimum for government-funded buildings
1 PearlEstidama minimum for all other new buildings
5%VAT, shown on its own line in every estimate

Abu Dhabi figures for 2025, and the Estidama Pearl Rating System. Higher Pearl targets change the specification, and the specification changes the price.

Pricing a client BOQ

Priced Exactly the Way the Client Issued It

Government clients compare bids line by line. A changed description, a merged item or a missing rate can mark a bid as non-compliant. We price the BOQ exactly as issued and keep anything we’d change in a separate qualifications letter.

1:1

Client format untouched

Item numbers, descriptions and units stay as issued. Only the rate and amount columns are filled in.

PS

Provisional sums left as set

PC and provisional sums carried as given, with your attendance and profit percentages added where the BOQ asks for them.

Q

Clarifications raised early

Gaps between the BOQ and the drawings are listed for the tender clarification deadline.

Priced bill of quantities for an Abu Dhabi government tender
Who’s buying

Abu Dhabi Estimates by Client and Contract

How we price depends on who issued the tender and how the contract is set up.

Government and semi-government

Schools, clinics, community and municipal buildings priced to the issued BOQ and submission forms.

BOQ pricing →

Estidama cost allowances

Efficient fixtures, insulation, metering, shading and commissioning, costed against the target Pearl level.

Cost and value →

Design-and-build industrial

Warehouses and factories in KEZAD, ICAD and Mussafah, priced from outline design with design risk allowed for.

Steel estimating →

Roads and site infrastructure

Earthworks, roads, drainage and utility networks priced for community and plot development tenders.

Earthwork estimating →

Housing programmes

Repeated villa designs across many plots, priced once per type and multiplied, with site-by-site extras.

Concrete estimating →

Building services packages

MEP subcontract pricing for public and commercial buildings, including district cooling connections.

MEP estimating →
Returned as: Client’s BOQ fileRate analysisQualifications letterSummary in AED
Submission ready

What Goes Into Your Tender Envelope

The pricing documents an Abu Dhabi evaluation committee expects to see.

Priced BOQ as issued

The client’s own file, every rate filled in, with totals checked against the summary.

Rate analysis for key items

Build-ups for high-value items, ready if the evaluators ask for them.

Bonds and guarantees

Bid bond, performance bond and advance payment guarantee costs taken from the contract conditions.

Insurances

Contractor’s all-risk and third-party cover priced for the contract value and duration.

Sustainability allowance

Estidama-related costs listed so they can be explained at evaluation.

Qualifications letter

Assumptions and clarifications kept out of the BOQ, so the bid stays compliant.

We prepare the pricing. Your company reviews it, sets the final figure and submits the tender.

Example scopes

Typical Abu Dhabi Pricing Jobs

Three requests we often receive from contractors bidding in the emirate.

Example scope · Public sector

Clinic extension for a public client

A contractor needs the issued BOQ priced, a 2 Pearl allowance added and bonds costed before closing.

You send
BOQ, drawings, contract conditions
You get
Priced BOQ, rate analysis, letter
Typical time
5–7 working days
Example scope · Design and build

Logistics shed in an industrial zone

A design-and-build bid from an employer’s requirements document and an outline layout only.

You send
Employer’s requirements, layout
You get
Estimate with design-risk allowance
Typical time
4–6 working days
Example scope · Community

Mosque and community hall

A contractor prices a community building with specialist finishes and services from the tender drawings.

You send
Tender drawings, specification
You get
Priced BOQ with supplier quotes
Typical time
5–6 working days

The cards show common requests, not completed client projects. For delivered work, see our success stories.

Through the tender period

From Invitation to Submission

Invitation received

Share the tender documents. We check the BOQ, conditions and submission rules, then confirm the fee.

Clarifications

Questions are drafted for the client’s clarification deadline, and pricing starts on the clear items.

Pricing and quotes

Rates, supplier quotes, Estidama allowances, bonds and insurances are built into the price.

Envelope ready

Priced BOQ, analysis and qualifications letter are delivered before your sign-off meeting.

FAQs

Abu Dhabi Tender Pricing FAQs

How do Estidama requirements affect the price?

Estidama Pearl targets change the specification of insulation, glazing, fixtures, metering and commissioning. We cost these items as a separate allowance against the required Pearl level, so the evaluators can see what they cover.

Can you price bonds and guarantees?

Yes. Bid, performance and advance payment guarantee costs are priced from the percentages and durations in the contract, using the bank charges you give us.

Will you keep the client’s BOQ format?

Always. Descriptions, item numbers and units are left exactly as issued. Anything we’d change goes in the qualifications letter, not the BOQ.

Do you price design-and-build tenders?

Yes. We price from the employer’s requirements and outline design, with a design-development allowance shown openly so you can decide how much risk to carry.

What does Abu Dhabi tender pricing cost?

A fixed fee per tender, based on BOQ size and the time to closing. WhatsApp +91 88008 75774 or send the documents for a same-day figure.

Tender Invitation on Your Desk?

Send it today. We’ll confirm the fee and timing before the clarification deadline.

Scroll to Top