UAE · Quantity takeoffs · Bar bending schedules · MEP

Construction Takeoff Services in the UAE

Optimar Precon measures accurate quantities from your drawings for contractors, subcontractors and quantity surveyors in Dubai, Abu Dhabi, Sharjah and the wider UAE. You price the work. We do the measuring.

  • Metric quantities in Excel, CostX or your own BOQ template
  • Every item traceable to colour-coded, marked-up drawings
  • Most trade takeoffs delivered in 2–4 business days

Get a Takeoff Quote

Upload drawings and tell us the trades and your deadline. We reply with scope, fee and delivery date.

29+Years of group experience
3,270+Projects completed
98%Client retention
2–4Business days per trade takeoff
Takeoff or estimate?

Quantities You Can Price With Confidence

A takeoff gives you measured quantities only. You apply your own rates, supplier quotes and margins. If you also want the pricing done, see our estimating services in Dubai.

QTY

Measured, not guessed

Lengths, areas, volumes, counts and tonnages measured from each drawing, with waste factors shown separately.

1.5h

Same working day as your team

India is 1.5 hours ahead of the UAE, so drawing queries are answered during your office hours.

PDF

Easy to check

Marked-up Bluebeam PDFs show exactly what was counted, so your QS can check any line in minutes.

Quantity surveyor measuring construction drawings for a UAE takeoff
What we measure

Takeoff Services for UAE Trades

Order one trade or the full building. Each takeoff follows the way UAE projects are built.

Concrete and rebar

Concrete volumes, formwork areas and reinforcement tonnage for rafts, piles, podiums and high-rise frames, with bar bending schedules to BS 8666 on request.

Concrete takeoff →

Blockwork and masonry

Block walls by thickness and type, lintels, openings and plaster areas, measured floor by floor.

Masonry takeoff →

MEP

Chilled water pipework, ductwork, cable trays, conduits, drainage, fire fighting and fixture counts, grouped by system and floor.

MEP takeoff →

Structural steel

Member lengths, tonnage, plates and connections for warehouses, canopies, mezzanines and steel-framed buildings.

Steel takeoff →

Finishes and fit-out

Floor and wall tiling, gypsum ceilings and partitions, paint, skirting and joinery counts for residential, retail and hotel fit-outs.

Flooring takeoff →

Earthwork and external works

Excavation, backfill, dewatering areas, roads, paving and landscaping quantities for villa communities and infrastructure.

Earthwork takeoff →
Tools we use: Bluebeam RevuCostXPlanSwiftOn-Screen TakeoffRevit / Navisworks
What you receive

Takeoffs Set Up for UAE Tenders

What a UAE quantity surveyor needs from a takeoff, and how we provide it.

Metric units throughout

m, m², m³, kg and tonnes, with no conversions from imperial drawings needed on your side.

Your BOQ structure

Quantities arranged to POMI, NRM2 or the tender BOQ you’ve been issued, so they drop straight into pricing.

Marked-up drawings

Colour-coded PDFs for every sheet measured, so any quantity can be traced back to the drawing.

Floor-by-floor breakdown

Quantities split by level, zone or villa type, which helps with phasing, procurement and interim valuations.

Query and assumptions list

Missing details and drawing conflicts are listed in writing, not hidden inside a number.

Revision updates

When revised drawings arrive, we re-measure the changed areas and show what moved.

We measure from the documents you provide. Design responsibility, pricing and the final commercial decision stay with your team.

Proof and example scopes

How We Handle a Tight Deadline

A documented bid we supported, and three typical UAE takeoff packages.

96-hour construction takeoff and bid support for a general contractor
Success story · General contractor · US

Multi-trade takeoffs delivered in 96 hours

A contractor came to us mid-bid with the deadline at risk. We split the scope by trade and released takeoffs in stages so their estimator could start pricing straight away. The final package arrived three hours early. We run UAE takeoffs the same way.

96 hRequest to final package
14Assumptions documented
~$140KApproved substitutions
Read the case study →
Example scope · Villa

Concrete and rebar for a G+1 villa

A contractor tendering a private villa needs structural quantities and a rebar schedule to get steel prices.

You send
Structural drawings, schedules
You get
Concrete, formwork, rebar by element
Typical time
2–3 business days
Example scope · Residential building

Blockwork and finishes for a G+8 building

A fit-out subcontractor needs block, plaster, tiling, ceiling and paint quantities split by floor and apartment type.

You send
Architectural plans, finishes schedule
You get
Quantities by floor and unit type
Typical time
3–4 business days
Example scope · Warehouse

MEP takeoff for a logistics warehouse

An MEP subcontractor needs ductwork, pipework, cable tray and fire fighting quantities to send out for supplier quotes.

You send
MEP drawings, equipment schedules
You get
Quantities by system, marked-up PDFs
Typical time
3–4 business days

These are example scopes, not client case studies. Your quote is based on your own drawings. See more in our sample deliverables and success stories.

How we work

From Drawings to Checked Quantities

Scope and fee

We review your drawings and confirm trades, fee and delivery date, usually within one working day.

Queries logged

Missing details and conflicts go back to you as a written list before we assume anything.

Measured by trade

Each trade is measured and marked up on the drawings, and urgent trades are released first.

Second check

A second quantity surveyor checks the takeoff before the quantities and marked-up PDFs are issued.

FAQs

Questions UAE Contractors Ask

What is the difference between a takeoff and an estimate?

A takeoff lists measured quantities only, such as cubic metres of concrete or square metres of blockwork. An estimate adds rates and prices those quantities. Many UAE contractors order the takeoff and price it with their own rates.

Which formats do you deliver in?

Excel by default, arranged to POMI, NRM2 or your tender BOQ, plus colour-coded marked-up PDFs. We can also deliver CostX files or fill in your own template.

Do you prepare bar bending schedules?

Yes. Along with reinforcement tonnage, we can prepare bar bending schedules to BS 8666 from your structural drawings, for procurement or site use.

How long does a takeoff take?

Most single-trade takeoffs take 2–4 business days. Large multi-trade packages take longer, but we release trades in stages so you can start pricing early. Send your deadline and we’ll confirm before you commit.

Which emirates do you work in?

All of them. Most of our UAE work is in Dubai, Abu Dhabi and Sharjah. Because we work from drawings, location doesn’t affect delivery. Our team is 1.5 hours ahead of UAE time and you can reach us on WhatsApp at +91 88008 75774.

Need Quantities for a UAE Tender?

Send the drawings, the trades you need and your deadline. You’ll get a scope, a fixed fee and a delivery date, usually the same working day.

Scroll to Top