Construction Estimating Services in the UAE
Quantities are only half an estimate. The bid is won or lost on the rates. Optimar Precon prices UAE work in AED, with every rate built up from labour, plant and materials, preliminaries priced line by line, and 5% VAT shown on its own line.
- Rate build-ups your estimator can audit, item by item
- Supplier quotes levelled and compared before they go into the price
- Emirate-specific costs (logistics, authority fees, accommodation) flagged separately
UAE Estimate Request
Tell us the emirate, the project type and the closing date.
Fixed quote within 24 working hours, depending on complexity. NDA available on request.
From Quantity to Rate, With Nothing Hidden
Two contractors can measure the same quantities and still end up far apart on price. The gap is in the rates, the preliminaries and the risk allowance. We show how every rate is built, so your team can adjust a figure with confidence instead of guessing.
Rates built from the ground up
Gang sizes, output per day, plant hours, material with waste, and overhead, all shown for each major rate.
Supplier quotes levelled
Quotes for each major package compared on the same scope, with exclusions and gaps highlighted.
Risk priced, not buried
A short risk register with an allowance against each item, so management decides the final margin.
Estimates for Contractors, Subcontractors and Developers
Six estimating jobs UAE companies hand us, with the service page behind each.
Main contractor tenders
Full priced bids: measured work, preliminaries, provisional sums and the summary your board signs off.
Bid estimating →Priced bills of quantities
Your client’s BOQ, or one we prepare, priced line by line with rate analysis for the high-value items.
BOQ estimation →MEP subcontract packages
HVAC, plumbing, drainage, electrical and fire systems priced from supplier quotes and installation outputs.
MEP estimating →Frame and structure
Concrete, rebar and formwork priced with the pour sequence and formwork reuse built into the rates.
Concrete estimating →Variations and change orders
Instructed changes priced with backup, using contract rates where they apply and new rates where they don’t.
Change pricing →Savings options
Alternative materials and methods priced side by side, so the client can choose before the contract is signed.
Value engineering →What a UAE Estimate File Contains
Everything your commercial manager needs at the tender review meeting.
AED summary sheet
Totals by trade and section, with preliminaries, overhead, profit and VAT each on their own line.
Rate analysis
Build-ups for the items that make up most of the value, so they can be challenged and changed.
Preliminaries schedule
Staff, site facilities, equipment, insurances and bonds, priced against the programme length.
Supplier comparison
Side-by-side quote tables with scope gaps and the figure we carried.
Qualifications and exclusions
A ready-to-send list of assumptions for your tender letter.
Open queries
Items priced on assumption, listed so they can be raised before the bid closes.
We prepare the estimate. Your team sets the final margin and signs the tender.
Priced Under Deadline Before
A published bid we supported, plus three UAE estimating requests in the shape they usually arrive.
A multi-trade bid priced in four days
The contractor came to us with the bid already half done. Each trade was priced and handed over as soon as it was ready, every assumption was written down, and the substitutions we proposed were accepted by the client.
Retail roll-out across three emirates
A fit-out contractor prices six store fit-outs in Dubai, Abu Dhabi and Ajman, with logistics priced separately for each location.
- You send
- Store drawings, finishes schedule
- You get
- Per-store estimate, combined summary
- Typical time
- 5–7 working days
Change pricing for an MEP subcontractor
Twelve site instructions on a live job need pricing with backup before the next payment application.
- You send
- Instructions, contract rates, drawings
- You get
- Priced variations with build-ups
- Typical time
- 3–5 working days
Second opinion on a tender price
An estimating manager wants an independent check of the 20 biggest rates before submission.
- You send
- Priced BOQ, key quotes
- You get
- Rate review with comments
- Typical time
- 2–3 working days
The three cards are typical requests, not completed client projects. See also our sample deliverables.
How a UAE Tender Gets Priced With Us
Documents reviewed
We read the tender, flag missing information and confirm the scope and fee with you.
Quantities confirmed
We measure, or check the BOQ you were issued, so the pricing starts from reliable numbers.
Rates and quotes
Rates are built up, supplier quotes are levelled and the preliminaries are priced against the programme.
Review pack
Summary, risks and exclusions sent ahead of your internal tender review.
UAE Estimating FAQs
Do you price in AED and include VAT?
Yes. All estimates are in AED, with 5% VAT shown as its own line so it can be adjusted for the contract terms.
Where do your UAE rates come from?
From build-ups using labour outputs, plant and material costs, plus supplier quotes you provide or that we request on your behalf. Every rate can be traced, so your team can replace any input with its own figure.
Can you price variations on a live project?
Yes. Send the instruction, the contract rates and the drawings. We price each change with backup that is ready for your payment application.
Which emirates do you cover?
How much does a UAE estimate cost, and how do I get a quote?
Each tender gets a fixed fee based on the size of the document set and the deadline, quoted within 24 working hours, depending on complexity. Teams with a steady flow of tenders can hire a dedicated estimator by the month. Send your documents through the form, email support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA).
Related services
Need a Price You Can Defend?
Send the tender pack. You’ll receive a fixed fee and delivery date within 24 working hours, depending on complexity.