Construction Takeoff Services in Dublin
Dublin subcontractors price apartment blocks floor by floor and housing schemes house type by house type, often with several tenders due in the same week. Optimar Precon’s construction takeoff services in Dublin measure the quantities for you, set out by block, level and unit type, so your estimators can go straight to pricing.
- Quantities split by block, floor and apartment type
- House-type takeoffs for schemes in Fingal and the suburbs
- Single-trade measurement for drylining, M&E, flooring and more
Dublin Takeoff Quote
Which trades do you need measured, and when does the tender close?
Apartments in the City, Houses in Fingal
Each one needs measuring a different way.
Central Statistics Office new dwelling completions, 2025.
Quantities in the Order You Build
On an apartment block, quantities are most useful split by core, floor and unit, so they match your programme and your valuations. On a scheme, they work best per house type, times the number of each. We set up every takeoff that way from the start, so the numbers are useful for buying and valuations as well as pricing.
By level and core
Apartment quantities grouped to match your build sequence.
By house type
Each type measured once and multiplied by its count.
Ready for valuations
The same breakdown supports monthly applications for payment.
Takeoffs for Dublin Subcontractors
Pick one trade or the full set.
Drylining and ceilings
Partitions, linings and ceilings by apartment and corridor.
Takeoff Ireland →Mechanical and electrical
Pipework, ductwork, cabling and fittings counted per floor.
MEP takeoff →Concrete and frames
Slabs, columns, cores and reinforcement for multi-storey blocks.
Concrete takeoff →Blockwork and brickwork
Walls, façades and openings for houses and low-rise blocks.
Masonry takeoff →Flooring and finishes
Floor finishes, tiling and skirting measured room by room.
Flooring takeoff →Groundworks and drainage
Excavation, foundations, roads and drainage for schemes.
Earthwork takeoff →Quantities You Can Check Line by Line
Every number traceable to a drawing.
Excel quantity sheet
Laid out to your pricing template or to ARM4.
Marked-up drawings
Colour-coded PDFs showing what was measured.
Floor and unit split
Totals by block, level and apartment type.
House-type schedule
Quantities per type and for the whole scheme.
Query list
Drawing gaps and clashes noted for your RFIs.
Revision updates
Changes re-measured when new drawings are issued.
Quantities only, unless you also want them priced. See our Dublin estimating service.
What Dublin Firms Send Us
Three typical takeoff requests.
Two apartment blocks, 140 units
A drylining contractor needs partitions and ceilings measured per unit.
- You send
- Plans, sections, finishes schedule
- You get
- Quantities by unit and floor
- Typical time
- 3–5 days
Fingal scheme, six house types
A builder needs blockwork, roofing and groundworks for every type.
- You send
- House type drawings, site layout
- You get
- Per-type and total quantities
- Typical time
- 4–6 days
Office fit-out, three floors
An electrical contractor needs containment, cabling and fittings counted.
- You send
- Electrical layouts, spec
- You get
- Counts and lengths by floor
- Typical time
- 2–3 days
These are example scopes, not completed client projects. See finished work in our success stories.
Several Tenders, One Week
Upload
Send drawings by email or a cloud link.
Confirm
Fee and delivery date agreed for each tender.
Measure
Urgent tenders measured first, others queued behind.
Deliver
Quantities sent with mark-ups, ready to price.
Construction Takeoff in Dublin: FAQs
Can you split quantities by floor and apartment?
Yes. Apartment takeoffs can be grouped by block, core, level and unit type to match your programme and valuations.
Do you measure one trade only?
Yes. Drylining, M&E, concrete, masonry, flooring or groundworks can each be measured on their own.
What if new drawing revisions arrive?
We re-measure the changes and show what moved, so you can update your price quickly.
Can you handle several tenders at once?
Yes. We agree a delivery date for each one and measure the most urgent first.
How do I send drawings?
Email support@optimarprecon.com or call +44 74 2787 2167. Large sets can be shared by cloud link.
Related services
Tenders Piling Up?
Send the drawings for the most urgent one. We’ll confirm a fee and date the same day.