Dublin · Apartment viability · Tender pricing · Fit-out and refurbishment costs

Construction Estimating Services in Dublin

In Dublin, whether a scheme goes ahead often depends on the cost per apartment. Developers need numbers they can take to funders, and contractors need tender prices that hold up when the bill is checked. Optimar Precon provides construction estimating services in Dublin: cost plans, priced bills and tender estimates for developers, main contractors and subcontractors.

  • Cost per unit type for apartment and mixed-use schemes
  • Priced bills for main contract and subcontract tenders
  • Refurbishment and fit-out budgets for city buildings

Dublin Estimate Request

What needs pricing, how far is the design, and when is the number due?

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO 19650Certified for BIM, plus ISO 9001 & 27001
Dublin’s pipeline

A Lot of Building to Price

Dublin output in 2025, and what it means for estimators.

4,664homes completed in Dublin in the last quarter of 2025 alone
4,325apartments in Dublin City Council’s area, the most of any council
37.7%of all new homes in Ireland that year were in Dublin
13.5%VAT on construction, kept separate from net figures in our estimates

Central Statistics Office and Revenue figures, 2025.

What decides a Dublin scheme

Cost Per Apartment, Not Just a Total

A single total doesn’t tell a developer which apartment types make money. We split the cost of each scheme into units, shared areas, basement and external works, so you can see the cost of each one-, two- and three-bed type and test changes before the design is fixed.

Unit

Cost by unit type

Each apartment type priced with its share of common areas.

Opt

Options compared

Frame, façade and basement choices priced side by side.

Fund

Funder-ready layout

Elemental summaries that lenders and investors can follow.

Construction cost estimate for a Dublin apartment scheme
Dublin estimating

Estimates for Every Stage of a Dublin Job

From site appraisal to subcontract tender.

Main contract tenders

Full tender estimates with preliminaries and risk priced.

Bid estimating →

Bills of quantities

BoQs measured to ARM4 for tendering and cost control.

BoQ estimation →

M&E package pricing

Mechanical and electrical estimates for subcontractors.

MEP estimating →
Platforms: BluebeamPlanSwiftCostXExcel
In every estimate

A Number You Can Explain

Made to be checked by a director, a funder or a client’s QS.

Elemental summary

Costs grouped by building element with rates per square metre.

Unit cost table

Cost for each apartment or unit type on residential jobs.

Measured quantities

Backed by marked-up drawings for checking.

Assumptions list

Every assumption written down where the design is incomplete.

Exclusions

Items outside the price stated plainly.

VAT shown separately

Net and gross figures so the totals are clear.

We prepare the estimate. Your team decides margin and submits the price.

Example scopes

Common Dublin Pricing Jobs

Three requests we see from Dublin teams.

Example scope · Appraisal

120-unit apartment scheme

A developer needs a cost per unit type before a funding meeting.

You send
Planning drawings, schedule
You get
Cost plan, unit cost table
Typical time
1–2 weeks
Example scope · Tender

Main contract for a mixed-use block

A contractor needs a full tender estimate on a tight closing date.

You send
Tender package
You get
Priced BoQ, risk list
Typical time
2–3 weeks
Example scope · Refurbishment

Georgian building conversion

An owner needs a budget to convert upper floors to apartments.

You send
Survey, proposed drawings
You get
Budget estimate, exclusions
Typical time
1 week

These are example scopes, not completed client projects. See finished work in our success stories.

Working together

From Drawings to a Dublin Price

Brief

Drawings and deadline received; fee and date confirmed.

Measure

Quantities taken off and queries raised early.

Price

Current Irish rates applied, with your own rates where supplied.

Walk-through

Estimate reviewed with you online before it goes out.

FAQs

Construction Estimating in Dublin: FAQs

Can you show the cost of each apartment type?

Yes. We split the scheme cost into unit types, shared areas, basement and external works, so each one-, two- and three-bed type has its own cost.

Will a funder accept your cost plan?

Our cost plans use an elemental layout with quantities, rates and assumptions set out, which is what funders usually review. Check any specific format your funder needs.

Do you price refurbishment of older Dublin buildings?

Yes. We price from surveys and proposed drawings, and list the allowances for unknowns that come with older buildings.

Which rates do you use?

Current Irish labour, plant and material rates, or your own rates and supplier quotes when you provide them.

How quickly can you turn round a Dublin estimate?

Email support@optimarprecon.com or call +44 74 2787 2167 with the drawings and deadline. Small budgets can take days; full tenders are planned around your closing date.

Need a Dublin Number This Week?

Send the drawings and your deadline. We’ll confirm a fee and delivery date.

Scroll to Top