London · Manchester · Birmingham · Leeds · Bristol · UK-wide

Construction Takeoff Services in the UK

Measuring drawings is the slowest part of any tender. Optimar Precon provides construction takeoff services in the UK for main contractors, subcontractors and quantity surveyors: quantities measured from your drawings, set out to NRM2 or your BOQ format, and ready for your team to price.

  • Material takeoffs for every major trade
  • Bills of quantities to NRM2 or your own structure
  • Coordinated from our UK office in Chertsey

UK Takeoff Request

Drawings, trades to measure, quantity format and your deadline.

Fixed quote within 24 working hours, depending on complexity. NDA available on request.

24 hrsFixed quote turnaround
3,270+Projects completed
ChertseyUK office, Surrey
ISO 9001Certified quality management
When UK teams call us

More Tenders Measured, Without More Staff

Most firms come to us when measuring is holding up pricing.

Busy tender periods

Several bids due at once and not enough hours to measure them all.

Revised drawings

Addenda arriving late, with changed items to re-measure fast.

Specialist trades

M&E, steel or drylining packages that take your team longest.

BOQ preparation

QSs and consultants who need a full bill measured for tender.

Why Optimar Precon

Quantities You Can Check Line by Line

A total with no backup is no use at a tender review. Every quantity we send links to a marked-up drawing, so your estimator can see exactly what was measured, query it and price it with confidence.

QTO

Marked-up drawings

Colour-coded sheets behind every quantity.

NRM

Measured to your rules

NRM2, NRM1, CESMM or your own BOQ coding.

QA

Checked before issue

Scales, units and totals reviewed by a second estimator.

Construction drawings measured for a UK quantity takeoff
Takeoff services

UK Takeoff Services by Trade

Send one trade or the full package.

Also: RoofingInsulationTimberPaintingFlooringElectrical
Tools: CostXBluebeamPlanSwiftOn-Screen TakeoffExcel
Deliverables

What You Receive

In your template, or ours if you don’t have one.

Quantity workbook

Quantities by trade, element or location.

Marked-up drawings

Colour-coded sheets showing what was measured.

Bill of quantities

Items set out to NRM2 or your bill structure.

Metric units

m, m², m³, tonnes and item counts.

Revision comparison

Changed quantities shown after each drawing issue.

Query list

Gaps and conflicts in the drawings flagged.

Takeoffs cover quantities only. Add pricing with our UK estimating services, or see the format in our sample projects.

Example scopes

Typical UK Requests

Three common jobs from UK contractors and QSs.

Example scope · Commercial

Office M&E package

An M&E contractor needs ductwork, pipework and containment measured for a tender.

You send
M&E layouts and schedules
You get
Quantities by system and floor
Typical time
4–5 days
Example scope · Industrial

Warehouse frame and slab

A main contractor needs steel tonnages and slab volumes for a distribution shed.

You send
Structural and civil drawings
You get
Steel and concrete takeoffs
Typical time
3–4 days
Example scope · Residential

Apartment block BOQ

A QS needs multitrade quantities set out in a bill for tender.

You send
Full drawing set, specification
You get
NRM2 quantities for the BOQ
Typical time
1–2 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

Working with us

How a UK Takeoff Runs

Send

Drawings, specification and the trades to measure.

Get a fixed quote

Fee and delivery date within 24 working hours.

Measure and check

Quantities taken off, then checked by a second estimator.

Receive

Workbook, marked-up drawings and query list.

FAQs

Construction Takeoff Services UK: FAQs

Which trades can you measure?

Concrete and rebar, structural steel, groundworks, brickwork and masonry, drylining, roofing, insulation, timber, flooring, painting and M&E. You can send a single trade or the full package.

Do you measure to NRM?

Yes. We measure building works to NRM2, early-stage elemental quantities to NRM1 and civil works to CESMM where the tender requires it, or to your own BOQ structure and coding.

What is the difference between a takeoff and an estimate?

A takeoff measures the quantities in your drawings, such as concrete volumes, cable lengths and floor areas. An estimate adds rates for labour, materials and plant to price them. We can supply either.

How long does a UK takeoff take?

Single-trade takeoffs often take a few working days, and full multitrade bills one to two weeks. You’ll get a fixed delivery date with your quote, built around your tender deadline.

Can you update quantities when drawings change?

Yes. When revised drawings or addenda arrive, we re-measure the affected items and show what changed against each drawing issue.

Where in the UK do you work?

Across England, Scotland, Wales and Northern Ireland. Work is coordinated from our UK office in Chertsey, Surrey, with takeoff teams in New Delhi, and everything runs from shared drawings, so location is never a limit.

How do I get a quote?

Send your drawings and deadline through the form, by email to support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA). You’ll receive a fixed quote within 24 working hours, depending on complexity.

Tender Due Soon?

Send the drawings. You’ll receive a fixed fee and delivery date within 24 working hours.

Scroll to Top