Birmingham · Digbeth · Solihull · Black Country · West Midlands

Construction Takeoff Services in Birmingham

Birmingham’s pipeline runs from Digbeth and Smithfield regeneration to new schools, hospital upgrades and logistics sheds along the M6 and M42. Optimar Precon provides construction takeoff services in Birmingham for contractors, subcontractors and quantity surveyors who need accurate quantities measured from drawings before a tender closes.

  • Material takeoffs for every major trade
  • Quantities measured to NRM2 or your BOQ format
  • Marked-up drawings so every figure can be checked

Birmingham Takeoff Request

Drawings, trades to measure, quantity format and your deadline.

Fixed quote within 24 working hours, depending on complexity. NDA available on request.

24 hrsFixed quote turnaround
3,270+Projects completed
ChertseyUK office, Surrey
ISO 9001Certified quality management
Birmingham projects

Where Birmingham Teams Need Quantities

Four project types that keep West Midlands estimators busy.

City-centre regeneration

Mixed-use, residential and office schemes in Digbeth, Smithfield and the Jewellery Quarter.

Logistics and industrial

Large-span sheds, slabs and cladding along the M6, M42 and Black Country corridor.

Schools and healthcare

Phased education and hospital works with heavy M&E content.

Housing and refurbishment

New homes across Solihull and Sutton Coldfield, plus alterations to existing buildings.

Why outsource takeoffs

Spend Your Time Pricing, Not Measuring

Measuring is the slowest part of a tender. We take that off your estimators, so they can spend their time on rates, supplier quotes and tender strategy. You get quantities you can check line by line against the drawings.

QTO

Trade-by-trade quantities

Lengths, areas, volumes, tonnages and counts.

NRM

Measured to your rules

NRM2, CESMM or your own BOQ structure.

Rev

Addenda re-measured

Changed items updated when new drawings arrive.

Construction drawings measured for a Birmingham quantity takeoff
Takeoff services

Takeoff Services for Birmingham Projects

Send one trade or the full package.

Tools: CostXBluebeamPlanSwiftOn-Screen TakeoffExcel
Deliverables

What Birmingham Teams Receive

In your template, ready to price.

Quantity workbook

Quantities by trade, element or location.

Marked-up drawings

Colour-coded sheets showing what was measured.

BOQ quantities

Items set out to NRM2 or your bill structure.

Metric units

m, m², m³, tonnes and item counts.

Revision log

Changes tracked against each drawing issue.

Query list

Gaps and conflicts in the drawings flagged.

Takeoffs cover quantities only. Add pricing with our estimating services in Birmingham.

Example scopes

Typical Birmingham Requests

Three common jobs from West Midlands firms.

Example scope · Logistics

Distribution shed frame and slab

A steel subcontractor needs tonnages and a groundworker needs slab volumes.

You send
Structural and civil drawings
You get
Steel and concrete takeoffs
Typical time
3–4 days
Example scope · Education

School extension M&E

An M&E contractor needs services measured for a phased school project.

You send
M&E layouts and schedules
You get
M&E quantity schedules
Typical time
4–5 days
Example scope · Residential

Digbeth apartment block BOQ

A QS needs multitrade quantities set out in a bill for tender.

You send
Full drawing set, specification
You get
NRM2 quantities for the BOQ
Typical time
1–2 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

Working with us

How a Birmingham Takeoff Runs

Send

Drawings, specification and the trades to measure.

Get a fixed quote

Fee and delivery date within 24 working hours.

Measure and check

Quantities taken off, then checked by a second estimator.

Receive

Workbook, marked-up drawings and query list.

FAQs

Takeoff Services in Birmingham: FAQs

Which trades can you measure for Birmingham projects?

Concrete and rebar, structural steel, groundworks, brickwork and masonry, drylining, roofing, flooring, finishes and M&E. You can send a single trade or the full package.

Do you measure to NRM2?

Yes. We measure building works to NRM2 and civil works to CESMM where the tender requires it, or to your own BOQ structure and coding.

Is pricing included in a takeoff?

No. A takeoff gives you measured quantities. If you want rates applied, we can add a priced estimate through our estimating service.

Can you update quantities when drawings change?

Yes. When revised drawings or tender addenda arrive, we re-measure the affected items and log the changes against each drawing issue.

Which areas around Birmingham do you cover?

Birmingham and the wider West Midlands, including Digbeth, Edgbaston, Solihull, Sutton Coldfield, West Bromwich and Wolverhampton. We work from your drawings, so location is never a limit.

How do I get a quote?

Send your drawings and deadline through the form, by email to support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA). You’ll receive a fixed quote within 24 working hours, depending on complexity.

Birmingham Tender on the Go?

Send the drawings. You’ll receive a fixed fee and delivery date within 24 working hours.

Scroll to Top