Construction Takeoff Services in the UK
Measuring drawings is the slowest part of any tender. Optimar Precon provides construction takeoff services in the UK for main contractors, subcontractors and quantity surveyors: quantities measured from your drawings, set out to NRM2 or your BOQ format, and ready for your team to price.
- Material takeoffs for every major trade
- Bills of quantities to NRM2 or your own structure
- Coordinated from our UK office in Chertsey
UK Takeoff Request
Drawings, trades to measure, quantity format and your deadline.
Fixed quote within 24 working hours, depending on complexity. NDA available on request.
More Tenders Measured, Without More Staff
Most firms come to us when measuring is holding up pricing.
Busy tender periods
Several bids due at once and not enough hours to measure them all.
Revised drawings
Addenda arriving late, with changed items to re-measure fast.
Specialist trades
M&E, steel or drylining packages that take your team longest.
BOQ preparation
QSs and consultants who need a full bill measured for tender.
Quantities You Can Check Line by Line
A total with no backup is no use at a tender review. Every quantity we send links to a marked-up drawing, so your estimator can see exactly what was measured, query it and price it with confidence.
Marked-up drawings
Colour-coded sheets behind every quantity.
Measured to your rules
NRM2, NRM1, CESMM or your own BOQ coding.
Checked before issue
Scales, units and totals reviewed by a second estimator.
UK Takeoff Services by Trade
Send one trade or the full package.
Concrete and rebar
Foundations, slabs, walls, formwork and reinforcement.
Concrete takeoffs →Structural steel
Members, plates, connections and tonnages.
Steel takeoffs →Groundworks and earthworks
Excavation, fill, drainage and external works.
Earthwork takeoffs →Brickwork and masonry
Bricks, blocks, cavities, lintels and accessories.
Masonry takeoffs →Drylining and finishes
Partitions, ceilings, flooring and decorations.
Drywall takeoffs →M&E
Ductwork, pipework, containment, cabling and fittings.
MEP takeoffs →What You Receive
In your template, or ours if you don’t have one.
Quantity workbook
Quantities by trade, element or location.
Marked-up drawings
Colour-coded sheets showing what was measured.
Bill of quantities
Items set out to NRM2 or your bill structure.
Metric units
m, m², m³, tonnes and item counts.
Revision comparison
Changed quantities shown after each drawing issue.
Query list
Gaps and conflicts in the drawings flagged.
Takeoffs cover quantities only. Add pricing with our UK estimating services, or see the format in our sample projects.
Typical UK Requests
Three common jobs from UK contractors and QSs.
Office M&E package
An M&E contractor needs ductwork, pipework and containment measured for a tender.
- You send
- M&E layouts and schedules
- You get
- Quantities by system and floor
- Typical time
- 4–5 days
Warehouse frame and slab
A main contractor needs steel tonnages and slab volumes for a distribution shed.
- You send
- Structural and civil drawings
- You get
- Steel and concrete takeoffs
- Typical time
- 3–4 days
Apartment block BOQ
A QS needs multitrade quantities set out in a bill for tender.
- You send
- Full drawing set, specification
- You get
- NRM2 quantities for the BOQ
- Typical time
- 1–2 weeks
These are example scopes, not completed client projects. See finished work in our success stories.
How a UK Takeoff Runs
Send
Drawings, specification and the trades to measure.
Get a fixed quote
Fee and delivery date within 24 working hours.
Measure and check
Quantities taken off, then checked by a second estimator.
Receive
Workbook, marked-up drawings and query list.
Construction Takeoff Services UK: FAQs
Which trades can you measure?
Concrete and rebar, structural steel, groundworks, brickwork and masonry, drylining, roofing, insulation, timber, flooring, painting and M&E. You can send a single trade or the full package.
Do you measure to NRM?
Yes. We measure building works to NRM2, early-stage elemental quantities to NRM1 and civil works to CESMM where the tender requires it, or to your own BOQ structure and coding.
What is the difference between a takeoff and an estimate?
A takeoff measures the quantities in your drawings, such as concrete volumes, cable lengths and floor areas. An estimate adds rates for labour, materials and plant to price them. We can supply either.
How long does a UK takeoff take?
Single-trade takeoffs often take a few working days, and full multitrade bills one to two weeks. You’ll get a fixed delivery date with your quote, built around your tender deadline.
Can you update quantities when drawings change?
Yes. When revised drawings or addenda arrive, we re-measure the affected items and show what changed against each drawing issue.
Where in the UK do you work?
Across England, Scotland, Wales and Northern Ireland. Work is coordinated from our UK office in Chertsey, Surrey, with takeoff teams in New Delhi, and everything runs from shared drawings, so location is never a limit.
How do I get a quote?
Send your drawings and deadline through the form, by email to support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA). You’ll receive a fixed quote within 24 working hours, depending on complexity.
Takeoff services by city
Related services
Tender Due Soon?
Send the drawings. You’ll receive a fixed fee and delivery date within 24 working hours.