Construction Takeoff Services in Dubai
Dubai tenders move fast, and most of them are either multi-storey buildings or villa communities. Optimar Precon measures both the way Dubai estimators price them: towers by typical floor and podium, villas by type and count, fit-outs by landlord package.
- Tower quantities split into substructure, podium, typical floors and roof
- Villa quantities per villa type, multiplied by the plot schedule
- Trades released one by one, so pricing starts before the full package is done
Quote for a Dubai Takeoff
Tell us the building type, the trades and the tender closing date. We reply with scope, fee and a release schedule.
More Permits Means More Tenders to Price
Dubai Municipality’s own figures show how busy estimating teams are, and what kind of buildings they are pricing.
Figures from Dubai government data. That split is why this page focuses on tower and villa quantities.
Measuring Capacity for Overlapping Tenders
When three tenders close in the same fortnight, the measuring is what falls behind. We take the takeoff off your desk, so your estimators spend their time on supplier quotes, rates and the tender strategy.
Long-lead trades first
Concrete, rebar and steel go out first so you can get supplier prices early. Finishes follow.
Addenda handled before closing
Revised sheets are re-measured and you get a list of what changed, item by item.
Queries answered the same day
India is 1.5 hours ahead of Dubai, so missing details are raised and closed within your working day.
How We Measure Each Kind of Dubai Project
Pick the project type closest to yours. Each card links to the trade service behind it.
Residential and commercial towers
We measure one typical floor in full, apply it to the floor count, then add transfer, podium and roof levels separately. That keeps a 40-storey takeoff easy to check.
Concrete and frame takeoff →Villa communities
Each villa type is measured once, then multiplied by the plot schedule. Boundary walls, landscaping and infrastructure are kept as separate sections.
Blockwork and masonry takeoff →Mall, office and hotel fit-outs
Gypsum partitions and ceilings, floor and wall finishes, joinery and doors, counted to the landlord or developer fit-out package boundary.
Finishes takeoff →MEP subcontractor packages
Chilled water, ductwork, cable trays, small power, lighting and fire fighting, grouped by system and floor so you can send them straight to suppliers.
MEP takeoff →Jebel Ali and Dubai South warehouses
Portal frame steel tonnage, cladding and roof sheeting areas, slab-on-grade concrete and external paving for logistics buildings.
Steel takeoff →Bar bending schedules
Rebar schedules to BS 8666 from your structural drawings, by element and pour, ready for the steel fixer or for supplier pricing.
Rebar and BBS →Quantities Laid Out the Way You Price Them
Six things you’ll find in every Dubai takeoff we send.
Typical-floor multipliers
Typical floors shown once with the multiplier beside them, so a reviewer can check one floor instead of forty.
Villa-type matrix
Quantities per villa type in columns, with plot counts at the top and community totals at the bottom.
Tender BOQ order
Items follow the BOQ issued with the tender, usually POMI or NRM2, with item references kept intact.
Supplier enquiry sheets
Separate tabs for rebar, blocks, tiles and MEP materials that you can forward to suppliers as they are.
Change list for each addendum
Each revised drawing gets a short list of increased, reduced and new items, with the old and new quantities.
Colour-coded mark-ups
Every measured sheet comes back as a marked PDF, so your QS can trace any line to the drawing.
We measure what the tender documents show. Rates, risk allowances and the bid price stay with your team.
Staged Delivery Under Tender Pressure
A published bid we supported, plus three Dubai packages of the kind estimators send us.
A full multi-trade takeoff in 96 hours
A contractor brought us in halfway through a bid. Takeoffs were released trade by trade so pricing could run in parallel, and the last package landed three hours before the deadline. Staged release is the same method we use on Dubai tenders.
Frame and blockwork for a 2B+G+30 tower
A main contractor needs concrete, rebar and blockwork split into basement, podium and typical floors before supplier prices are due.
- You send
- Structural and architectural tender set
- You get
- Quantities by level, BBS, marked PDFs
- Typical time
- 5–7 business days
Shell and core for four villa types
A contractor pricing 120 villas across four types needs per-type quantities and community totals for structure and blockwork.
- You send
- Villa type drawings, plot schedule
- You get
- Villa-type matrix with totals
- Typical time
- 3–5 business days
Finishes for a retail fit-out package
A fit-out contractor needs partitions, ceilings, flooring and joinery counted to the landlord’s package boundary.
- You send
- Design drawings, finishes schedule
- You get
- Quantities by area and finish code
- Typical time
- 2–3 business days
The three cards describe typical requests, not completed client projects. Your fee is set from your own drawings. See our sample deliverables.
From Tender Issue to Bid Submission
Day 0: you send the set
Drawings, specification, tender BOQ and the closing date, by upload or WhatsApp link.
Day 1: fee and release plan
You get a fixed fee and a date for each trade, with the long-lead trades scheduled first.
Days 2–6: trades released
Each trade arrives as soon as it has been measured and checked, with its query list attached.
Before closing: addenda
Late revisions are re-measured and returned as a change list you can price straight away.
Dubai Takeoff Questions
How do you handle a tower with many identical floors?
We measure one typical floor in full and apply it to the number of typical floors. Basements, podium, transfer and roof levels are measured on their own, so any differences between floors are not lost.
Can you price against the developer’s tender BOQ?
We don’t price, but we measure against it. Quantities are placed under the BOQ item references you were issued, and any item the drawings don’t support is flagged for a tender query.
What if addenda arrive a few days before tender closing?
Send them as soon as they arrive. We re-measure only the affected sheets and send a change list showing old and new quantities, so you don’t have to recheck the whole takeoff.
Do you do takeoffs for fit-out contractors?
Yes. Mall, office and hotel fit-outs are a large share of Dubai work. We measure partitions, ceilings, finishes, joinery and MEP to the package boundary in your contract or landlord guide.
How is a Dubai takeoff priced?
A fixed fee per package, based on the number of sheets, the trades and how soon you need it. Estimating teams with steady tender volumes can also hire a dedicated quantity surveyor monthly. WhatsApp us at +91 88008 75774 for a quick figure.
Related services
Tender Closing Soon?
Send the set today and we’ll come back with a fee and a trade-by-trade release plan within one working day.