Dubai · Shop drawings · Tenant fit-out NOCs · As-built handover

CAD Drafting Services in Dubai

A Dubai building goes through three rounds of drawings: shop drawings while it’s built, as-builts before the completion certificate, and fit-out sets once tenants move in. Optimar Precon drafts all three for contractors, fit-out firms and consultants, on your title blocks and to each reviewer’s checklist.

  • Shop drawings released ahead of each pour, install and inspection
  • As-built sets that pick up every site change before handover
  • Tenant fit-out packages for developer and authority NOCs

Dubai Drafting Quote

Tell us which stage you’re at (shop, as-built or fit-out), how many sheets, and when they’re due.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO9001 & 27001 certified
One quarter of Dubai construction

Every Inspection and Handover Needs Drawings

What Dubai’s site teams got through in the first three months of 2026.

3,154building completion certificates issued
10,855structural inspections carried out on site
824,381 m³of concrete covered by those inspections
10,776new building permits, so the next wave is already coming

Dubai figures for Q1 2026. Each completion certificate depends on as-built drawings, and each inspection on approved shop drawings.

Where drawings hold up a project

Don’t Let Paperwork Delay Handover

On many Dubai projects the building is finished before the drawings are. Site changes never reached the CAD files, shop drawings are on revision F, and the handover pack is due. We take the backlog so your engineers can stay on site.

Red

Site mark-ups into clean CAD

Photos of marked-up prints, foreman sketches and site instructions turned into proper revisions.

Log

One register for every sheet

Drawing number, revision, status and reviewer for each sheet, so you always know what’s still open.

24h

Comments back the next day

Most consultant comments on shop drawings are closed and reissued within one working day.

Drafter turning site mark-ups into as-built CAD drawings for a Dubai building
Drafting by project stage

Construction, Completion and Fit-Out

Six Dubai drawing packages, grouped by the stage you are at.

Rebar and formwork shop drawings

Pour-by-pour reinforcement and formwork details for cores, slabs and podiums, ready before the structural inspection.

Structural CAD →

MEP coordinated shop drawings

Ductwork, pipework, cable tray and sprinkler layouts with sections through tight ceilings and risers.

MEP CAD →

Joinery, ceiling and façade details

Fabrication drawings for specialist subcontractors, with setting-out dimensions taken from the approved design.

Shop drawings →

As-built drawings for completion

Architectural, structural and MEP as-builts updated from site records for the completion certificate and handover pack.

As-built drawings →

Tenant fit-out sets

Layouts, reflected ceilings, finishes and fire life safety plans for shops, F&B units and offices in newly completed towers.

Architectural CAD →

Old PDFs to editable DWG

Scanned or PDF drawings of older Dubai buildings redrawn in CAD before a renovation or change of use.

CAD conversion →
Drafted in: AutoCADAutoCAD MEPRevit sheetsBluebeam
What’s in the pack

Drawings a Dubai Reviewer Can Sign Off

The details that decide whether a set is approved or comes back with comments.

Revision clouds and tables

Every change clouded and listed, so reviewers see only what is new.

Developer fit-out checklists

Tenant sets laid out to the landlord’s fit-out guide, sheet order and naming included.

Fire and life safety plans

Exits, travel distances, fire-rated walls and detector layouts on separate sheets for the fire consultant.

Site change register

Each site instruction or RFI tied to the as-built sheet it changed, for the handover file.

DWG and signed-ready PDF

Native CAD files plus PDFs set up for your stamp and signature.

Your title block

Drawn on your template, so the set goes out under your company name.

Optimar Precon drafts from your design and site records. Your engineer of record reviews, stamps and submits.

Example scopes

One Request From Each Stage

The kind of Dubai packages we’re sent, with what usually comes back.

Example scope · During construction

Slab rebar shop drawings for a tower

A main contractor needs reinforcement drawings for the next six slabs, released two at a time ahead of each pour.

You send
Structural drawings, pour sequence
You get
Shop drawings per pour, BBS on request
Typical time
3–4 days per release
Example scope · Before completion

MEP as-builts for a residential building

An MEP contractor has a stack of marked-up prints and a handover date four weeks away.

You send
IFC drawings, site mark-ups, RFIs
You get
As-built DWG and PDF, change register
Typical time
2–3 weeks
Example scope · After handover

Café fit-out in a new tower

A fit-out firm needs a full NOC set for a ground-floor café in a building that has just opened.

You send
Design sketches, base-build drawings
You get
Layout, ceiling, finishes, FLS sheets
Typical time
4–6 working days

These cards describe common requests, not completed client projects. Your fee depends on your own sheet count. For finished work, see our success stories.

How a backlog gets cleared

From Drawing List to Approved Set

Share the list

Send the drawing register, or just the sheets that are late, plus your deadline.

Sequence agreed

We order the work around your inspections, submissions and handover date.

Sheets released daily

Finished sheets come back every day, so reviews can start before the full set is done.

Comments closed

Reviewer comments are fixed, clouded and logged until the set is approved.

FAQs

Dubai Drafting FAQs

Can you produce as-built drawings from site mark-ups?

Yes. Photos or scans of marked-up prints, site instructions and RFI replies are enough. Each change is drawn in, clouded and listed in a change register for your handover file.

Do you prepare fit-out drawings for developer NOCs?

Yes. Send the landlord’s fit-out guide and we lay the set out to it, including the sheet list, fire and life safety plans and any forms the guide asks for. Your consultant submits it.

How fast can you turn around shop drawing comments?

Most comment rounds are closed and reissued the next working day. Our team is 1.5 hours ahead of Dubai, so comments received in the morning are often done the same day.

Can you draw on our title block and CAD standards?

Yes. Send your template, layer standard and a sample set. Everything we draft goes out under your company name.

How is Dubai drafting priced?

Per sheet or per package for one-off work, or a monthly rate for a dedicated drafter. Send the drawing list or WhatsApp +91 88008 75774 for a quote.

Handover Date Getting Close?

Send the list of sheets still open. We’ll tell you how fast we can clear them.

Scroll to Top