Construction Estimating Services in Dubai

Dubai developers need to know what a project will cost long before the drawings are finished, and contractors need a price they can stand behind. Optimar Precon prepares cost plans that follow the design from concept to tender, plus priced bids for the contractors who build it.

  • Elemental cost plans at concept, schematic and detailed design
  • Main contractor and subcontract tender pricing in AED
  • Cost movement reported each time the design changes

Dubai Estimating Enquiry

Are you a developer or a contractor? Tell us the design stage, the building type and when you need the figure.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO9001 & 27001 certified
Dubai’s pipeline

More Projects Are Being Costed Than Ever

Dubai building permit activity in the first half of 2025.

30,000+building permit applications in six months
+20%compared with the first half of 2024
5.5M m²of licensed built-up area
15%of permits for industrial and public buildings

Dubai figures for H1 2025. Every one of those permits started with a budget, and most were priced by more than one contractor.

For Dubai developers

Know the Cost Before the Design Locks It In

Most cost overruns are fixed at design stage, long before a contractor prices anything. A cost plan updated at each design stage shows where the money is going while it is still cheap to change, whether that’s façade, MEP, basements or finishes.

m²

Cost per square metre by element

Substructure, frame, envelope, finishes and services split out, so you can compare them with your past projects.

±

What moved since the last stage

A short reconciliation explains every increase or saving between one cost plan and the next.

A/B

Options priced side by side

Two façade systems or two parking solutions costed equally, so the design team can decide on numbers.

Elemental cost plan for a Dubai residential development
Both sides of the table

Dubai Estimates for Developers and Builders

From the first budget to the subcontract package, the estimates Dubai teams ask us for.

Feasibility budgets

Order-of-cost estimates from a massing study or area schedule, to test a plot before design fees are spent.

Early cost advice →

Design-stage cost plans

Elemental cost plans updated at each design stage, with the cost of each design change reported.

Cost planning →

Main contractor bids

Priced tenders for towers, villa phases and mixed-use buildings, with preliminaries tied to the programme.

Bid estimating →

MEP and façade packages

Specialist subcontract estimates for building services and curtain wall, priced from supplier quotes.

MEP estimating →

Steel-framed buildings

Warehouses and industrial units priced on steel tonnage, connections, cladding and erection.

Steel estimating →

Office and retail fit-out budgets

Cat A and Cat B fit-out costs for landlords, tenants and fit-out contractors, by area and specification level.

All estimating services →
Delivered in: ExcelCostXNRM1 elemental formatBoard-ready PDF
Report format

A Cost Plan a Dubai Board Can Read

Built to be read quickly in an investment meeting and checked line by line afterwards.

One-page summary

Total cost, cost per m² of built-up area, and the main changes since the last report.

Elemental breakdown

Costs grouped by building element in NRM1 style, so they can be compared with other projects.

Escalation allowance

A separate line for price rises between the estimate date and the expected tender date.

Design and risk contingency

Contingencies shown openly and reduced as the design develops.

Exclusions up front

Land, fees, authority charges and furniture listed as included or excluded, so nobody is surprised later.

Basis of estimate

The drawings, revisions and assumptions each figure is based on.

Prices are in AED, with VAT shown separately. Cost plans are advisory and are prepared from the design information you provide.

Example scopes

Three Dubai Estimating Requests

One developer, one contractor, one fit-out. The shape of what we’re usually sent.

Example scope · Developer

Concept cost plan for a mid-rise residential block

A developer has massing drawings and an area schedule and needs a budget before appointing the full design team.

You send
Massing, area schedule, outline spec
You get
Elemental cost plan, cost per m²
Typical time
4–6 working days
Example scope · Contractor

Priced tender for a 2B+G+20 tower

A main contractor needs the BOQ priced, preliminaries built and supplier quotes levelled before closing.

You send
Tender documents, BOQ, quotes
You get
Priced BOQ, summary, risk list
Typical time
7–10 working days
Example scope · Fit-out

Cat B budget for an office floor

A tenant’s project manager wants a fit-out budget from a test-fit layout before going to tender.

You send
Test-fit plan, brief, spec level
You get
Fit-out budget by trade and area
Typical time
3–4 working days

These are example scopes, not completed client projects. For finished work, see our success stories.

Cost follows design

An Estimate That Grows With the Project

Concept

A budget per m² from massing and brief, to confirm the project stacks up.

Schematic design

An elemental cost plan, with the biggest cost drivers highlighted for the design team.

Detailed design

Measured quantities replace allowances, and changes are reconciled against the last plan.

Tender

A pre-tender estimate to compare contractor bids against, line by line.

FAQs

Dubai Cost Estimating FAQs

What’s the difference between a cost plan and a tender estimate?

A cost plan is prepared for the developer during design to set and control the budget. A tender estimate is prepared for a contractor to price the finished documents and submit a bid. We prepare both, but never for both sides of the same project.

Can you estimate from concept drawings only?

Yes. Early estimates use areas, an outline specification and allowances, with a higher contingency. The figure gets firmer as the design develops.

How do you deal with price rises in Dubai?

Escalation is shown as its own line, based on the time between the estimate and the expected tender or construction date. That way it can be reviewed separately from the base cost.

Do you prepare fit-out budgets?

Yes. Cat A and Cat B fit-out budgets for offices, retail and F&B, priced by area and specification level, with landlord works separated out.

How much does a Dubai cost plan cost?

There’s a fixed fee per stage, based on project size and design stage. Ask about bundled pricing if you need cost plans at several stages. WhatsApp +91 88008 75774 for a figure.

Budget Meeting Coming Up?

Send what you have, even if it’s only a massing study. We’ll tell you what figure we can give and when.