Construction Takeoff Services in the USA
Measuring is the slowest part of most bids, and it’s the work estimators most want to hand off. Optimar Precon provides construction takeoff services in the USA: trade-by-trade material quantities with color-coded mark-ups, set out to match your pricing sheet, so you can price straight from them.
- Quantities by trade, CSI division, floor or area
- Every quantity traceable to a marked-up plan
- Plans sent in the afternoon can be measured overnight
US Takeoff Quote
Which trades do you need measured, and when is the bid due?
Residential, Nonresidential, Public
Each one is measured differently, and we take off for all three.
US Census Bureau construction spending figures, September 2026.
Your Estimators Price, We Count
An estimator who spends two days measuring a job has two fewer days to look at pricing, subcontractor coverage and risk. We do the measuring in your format, then hand it back with mark-ups so your team can check any number in seconds.
Your format
Quantities laid out to match your pricing sheet or estimating software.
Color-coded mark-ups
Bluebeam or PDF mark-ups showing exactly what was measured.
Addenda handled
Revised sheets re-measured and changes listed.
Takeoffs for Every Major Trade
One trade or the whole job.
Concrete and rebar
Footings, slabs, walls and reinforcement by pour or area.
Concrete takeoff →Structural steel
Members, connections and miscellaneous metals by tonnage.
Steel takeoff →MEP
Pipe, duct, conduit, wire and fixture counts by system.
MEP takeoff →Earthwork and sitework
Cut and fill, utilities and paving from civil sets.
Earthwork takeoff →Masonry
CMU, brick and accessories measured by wall type.
Masonry takeoff →Flooring and finishes
Flooring, wall finishes and ceilings room by room.
Flooring takeoff →A Takeoff You Can Check in Seconds
Every number linked back to the plans.
Quantity workbook
Excel quantities by trade, division and area.
Marked-up plans
Color-coded PDFs or a Bluebeam session.
Waste factors shown
Net quantities with waste allowances listed separately.
Assumption list
Where drawings were unclear and what we assumed.
RFI prompts
Missing details flagged for your RFIs.
Addendum updates
Changes re-measured and highlighted.
Quantities only, unless you’d also like them priced. See our US estimating service.
Staged Takeoffs on a Tight Deadline
A published US bid, plus three typical requests.
Every trade measured in 96 hours
The contractor came to us halfway through a bid. Takeoffs were issued one trade at a time, in the order the estimators needed them, so pricing ran alongside measuring. The last package landed three hours before the deadline.
Multifamily framing and drywall
A drywall contractor needs studs, board and finishes by unit type.
- You send
- Architectural plans, wall types
- You get
- Quantities by unit and floor
- Typical time
- 2–4 days
Retail pad site
A site contractor needs earthwork, utilities and paving.
- You send
- Civil set, geotech report
- You get
- Cut/fill, pipe, paving quantities
- Typical time
- 2–3 days
Tilt-up warehouse electrical
An electrical contractor needs conduit, wire and devices counted.
- You send
- Electrical sheets, panel schedules
- You get
- Counts and lengths by system
- Typical time
- 2–3 days
The three cards are example scopes, not completed client projects. See more in our success stories.
From Plans to Quantities
Upload plans
PDF or DWG sets by link or email, with the bid date.
Fee and date
Confirmed before we start, trade by trade if needed.
Measure overnight
Our team works the plans while your office is closed.
Ready to price
Workbook and mark-ups waiting in the morning.
Construction Takeoff Services in the USA: FAQs
What is the difference between a takeoff and an estimate?
A takeoff measures quantities from the plans. An estimate adds labor, material and equipment pricing to those quantities. We offer both.
Do you provide takeoffs in all US states?
Yes. We measure from plans, so we can take off projects anywhere in the USA.
What do you need to start a takeoff?
The full plan set as PDF or DWG, the specifications if available, any addenda, the trades to measure and your bid date.
How do you check takeoff accuracy?
Every takeoff goes through an internal check against the plans before delivery, and the mark-ups let you verify any quantity yourself.
How much do takeoff services cost?
It depends on the trades and the size of the plan set. Most single-trade takeoffs are priced per job. Email support@optimarprecon.com or call +1 (469) 210-7530 for a fixed quote.
Related services
Measuring Holding Up Your Bid?
Send the plans this afternoon. We’ll confirm a fee and delivery time.