Tender Pricing and BQs in SGD

Construction Estimating Services in Singapore

Optimar Precon prepares cost estimates, bills of quantities and tender prices for Singapore main contractors, specialist subcontractors, QS consultancies and developers who need reliable numbers on a tight tender programme.

Estimates are priced in Singapore dollars with your rates and supplier quotes, and every line traces back to a measured quantity.

Quick answer: We provide cost plans, pre-tender estimates, priced bills of quantities, tender estimates, variation pricing and value engineering for Singapore building projects, with GST shown separately and a fixed quote within 24 working hours depending on project complexity.

  • Priced in SGD
  • Your rates and supplier quotes
  • Dedicated estimators available
Estimating Enquiry

Price Your Next Singapore Tender

Share the tender documents, scope to price, and the submission date.

3,270+Projects Completed
29+Years of Group Experience
98%Client Retention
7+Global Delivery Centres
Cost Pressure

Rising Costs Make Accurate Estimates Matter More

Cost consultancy Linesight forecasts overall construction costs in Singapore to rise by 3.5% to 4.5% in 2026, after cement prices jumped about 8% in a single quarter early in the year. Labour shortages, tight subcontractor capacity and long lead times for major M&E equipment add further risk.

In that market, an estimate built on old rates or rushed quantities can turn a winning tender into a loss-making contract. Contractors need more time on pricing strategy and supplier negotiation, and less on measurement and spreadsheet work.

What are construction estimating services? Construction estimating services work out how much a project is likely to cost by measuring quantities from drawings and pricing them with material, labour, plant and preliminary costs. The estimate supports budgets, bills of quantities and tender submissions.

Construction cost estimate prepared for a Singapore building tender
  • Supplier quotes and current market rates logged with dates
  • Escalation and long-lead items flagged for your review
  • Clear split between measured work, provisional sums and preliminaries
Estimates by Stage

Estimating Support From Feasibility to Final Account

StageEstimate we prepareWho uses it
FeasibilityOrder-of-cost estimate per m² GFA or per unitDevelopers, owners
Design developmentElemental cost plan updated as the design changesQS consultants, design teams
Pre-tenderPre-tender estimate to benchmark incoming bidsQS consultants, developers
Tender documentationBills of quantities ready for tenderers to priceQS consultancies
Tender submissionPriced BQ or lump-sum tender estimate with preliminariesMain contractors, subcontractors
ConstructionVariation pricing and claim supportContractors, QS consultants
Trade Estimating

Trades We Estimate for Singapore Projects

Concrete

Concrete by grade, formwork and finishes for RC frames.

Learn more →

Reinforcement

Rebar by diameter and mesh, with laps and wastage.

Learn more →

Post-Tensioning

PT slabs and beams, tendons and anchorages.

Learn more →

Structural Steel

Steelwork, connections, fire protection and erection.

Learn more →

Earthworks

Excavation, ERSS-related works and disposal.

Learn more →

Masonry

Blockwork, brickwork and lightweight panels.

Learn more →

Drywall and Ceilings

Partitions, ceilings and bulkheads for fit-outs.

Learn more →

Flooring

Tiles, screeds, vinyl, timber and raised floors.

Learn more →

Painting

Internal and external paint systems by area.

Learn more →

Roofing and Waterproofing

Roof finishes, membranes and drainage.

Learn more →

Electrical

Power, lighting, switchboards and containment.

Learn more →

ACMV

Air-conditioning and mechanical ventilation systems.

Learn more →

Plumbing and Sanitary

Water, sanitary, drainage and fittings.

Learn more →

Bid Estimating

Complete tender pricing for submission.

Learn more →

BQ Preparation

Bills of quantities for tender and procurement.

Learn more →

Value Engineering

Cost-saving options compared side by side.

Learn more →
Public and Private Tenders

Estimates Prepared for How Singapore Tenders Are Judged

Public sector construction tenders in Singapore are generally evaluated on both price and quality, not price alone. A credible, well-structured price with clear qualifications supports a stronger overall submission, while an unexplained low number can raise questions.

  • SGD pricing with GST shown separately
  • Preliminaries itemised: site set-up, supervision, safety, insurances and temporary works
  • Provisional sums and PC sums kept separate from measured work
  • Qualifications and exclusions listed so the tender letter matches the price
  • Escalation risk noted for volatile materials and long-lead equipment

Software and formats

We work in CostX, Bluebeam Revu, PlanSwift and Excel, and can price directly into your BQ template or tender return format. Quantities can also be taken from Revit and IFC models when a reliable model is available.

Request an Estimate
Process

How We Price a Singapore Tender

Tender review

Drawings, specification, BQ template, conditions and closing date.

Fee and plan

Fixed fee confirmed within 24 working hours, depending on complexity.

Measure

Quantities taken off by package with marked drawings.

Price

Your rates, supplier quotes and preliminaries applied.

Review and issue

Senior check, then estimate and queries issued, updated for addenda.

Who We Help

Estimating for Singapore’s Construction Supply Chain

  • Main contractors pricing public and private building tenders
  • Specialist subcontractors bidding several trade packages each week
  • QS consultancies needing extra hands for BQs and cost plans
  • Developers checking feasibility budgets and contractor prices

Dedicated estimators: a full-time estimator works only on your tenders, learns your rate build-ups and suppliers, and shares almost your entire working day from 2.5 hours behind Singapore.

FAQs

Construction Estimating Services in Singapore: FAQs

What estimating services do you offer in Singapore?

We prepare order-of-cost estimates, elemental cost plans, pre-tender estimates, bills of quantities, priced tender estimates, variation pricing and value engineering for Singapore building projects.

Do you price in Singapore dollars?

Yes. All Singapore estimates are priced in SGD using your rates, supplier quotes or agreed market rates, with GST shown separately.

Can you price directly into our BQ template?

Yes. We can work in your BQ template or tender return format, as well as CostX, Bluebeam Revu, PlanSwift and Excel.

How do you handle rising material costs?

We record the date and source of every rate, separate provisional and PC sums, and flag volatile materials and long-lead equipment so your team can decide on escalation allowances.

Which trades do you estimate?

We estimate concrete, reinforcement, post-tensioning, structural steel, earthworks, masonry, drywall and ceilings, flooring, painting, roofing and waterproofing, electrical, ACMV and plumbing and sanitary works.

Can you update the estimate for tender addenda?

Yes. We revise quantities and pricing when addenda arrive and highlight what changed from the previous version.

Can we hire a dedicated estimator?

Yes. A dedicated estimator works only on your tenders and overlaps almost your full working day from 2.5 hours behind Singapore time.

Tender Closing Soon?

Send the tender documents and your closing date. Expect a fixed quote within 24 working hours, depending on project complexity.

Scroll to Top