Data Centre BIM Modelling Services Germany
Optimar Precon provides data centre BIM modelling services in Germany for planners and building services contractors: Revit MEP models to the employer’s information requirements (AIA), openBIM exchange in IFC and installation models for the contractor’s Werk- und Montageplanung.
Models carry the heat recovery, heat pump and metering systems that German efficiency rules bring into a data centre, coordinated with the rest of the building from the first model.
Send Your German BIM Scope
Tell us the HOAI work stage, the disciplines and whether an AIA is in place, and we will propose a team and model programme.
Group-wide figures across all Optimar Precon services.
Working to German BIM Requirements on Data Centres
German clients set BIM requirements in their own terms. The model set-up follows them from the first exchange.
| Requirement | German term | What we deliver |
|---|---|---|
| Employer’s information requirements | AIA (Auftraggeber-Informationsanforderungen) | Models structured to the information the client asks for |
| BIM execution plan | BAP (BIM-Abwicklungsplan) | Contribution to the BAP and modelling to its agreed rules |
| Guidelines and standards | VDI 2552 series and DIN EN ISO 19650 | Naming, level of information and processes to the guidelines specified |
| Data exchange | openBIM with IFC | IFC exports checked before each exchange |
| Issue tracking | BCF | Clashes and queries exchanged as BCF issues |
Modelling Heat Reuse and Metering in German Data Centres
Heat reuse and energy reporting add plant, pipework and sensors that compete for space with cooling and power. They are coordinated like any other system.
Heat Recovery Plant Rooms
Heat exchangers and buffer tanks modelled at full size with maintenance space.
Heat Pump Locations
Heat pumps placed with acoustic, access and electrical supply requirements checked.
Heat Network Routes
Pipe routes to the site boundary modelled for the handover point to the network operator.
Metering Points
Energy and heat meters placed in the model for efficiency and reuse reporting.
Data Centre Models Through German Planning Stages
In Germany, the planner’s design and the contractor’s installation planning are separate steps. Models are set up for both.
| Stage | Model deliverable | Who uses it |
|---|---|---|
| LP 2 Vorplanung | Concept models of plant rooms and main routes | Planners and the client |
| LP 3 Entwurfsplanung | Coordinated design models by discipline | Planners, for approval and costing |
| LP 5 Ausführungsplanung | Detailed coordinated MEP models | Tender and construction teams |
| Werk- und Montageplanung | Installation models with supports, spools and openings | TGA contractors and fabrication |
| LP 8 handover | As-built models with asset data | Operator and facilities team |
Germany Data Centre BIM Deliverables
Revit MEP Models
Electrical, cooling, heat supply and fire protection models.
IFC Exchange Models
openBIM exports checked before each model exchange.
BCF Clash Reports
Clash tests run in Navisworks, with issues shared as BCF.
Montageplanung Models
Installation models with supports, spools and wall openings.
Opening and Slot Plans
Openings for pipes, ducts and containment taken from the model.
As-Built Models
Verified models and asset data for the operator.
Related services: Germany data centre preconstruction, Germany data centre estimating, preconstruction services Germany, data centre MEP clash detection case study, US data centre BIM modelling.
Starting Montageplanung?
Send the Ausführungsplanung models and your installation schedule, and we will scope the installation modelling.
Germany Data Centre BIM Modelling: FAQs
Do you model to an AIA and BAP?
Yes. Models are structured to the client’s employer’s information requirements (AIA) and modelled to the rules agreed in the BIM execution plan (BAP).
Do you exchange models in IFC?
Yes. Models are exported to IFC for openBIM exchange and checked before each issue, with clashes and queries shared as BCF issues.
Which BIM guidelines do you follow in Germany?
We follow the guidelines the project specifies, typically the VDI 2552 series and DIN EN ISO 19650, for naming, level of information and processes.
Can you produce models for Werk- und Montageplanung?
Yes. Installation models with supports, spools and wall openings are produced from the planner’s Ausführungsplanung for TGA contractors and fabrication.
Do you model heat reuse systems?
Yes. Heat recovery plant, heat pumps, heat network pipe routes and metering points are modelled and coordinated with cooling and power systems.
Which HOAI stages do you model for?
Models can be produced for Vorplanung, Entwurfsplanung and Ausführungsplanung, for the contractor’s installation planning, and as-built at handover.
Coordinate German Data Centres From Design to Installation
Models to AIA and BAP, exchanged in IFC and detailed for Montageplanung.