Optimar Precon provides data centre BIM modelling services in Germany for planners and building services contractors: Revit MEP models to the employer’s information requirements (AIA), openBIM exchange in IFC and installation models for the contractor’s Werk- und Montageplanung.

Models carry the heat recovery, heat pump and metering systems that German efficiency rules bring into a data centre, coordinated with the rest of the building from the first model.

Models to AIA and BAP
openBIM IFC Exchange
Heat Reuse Plant Modelled
Installation-Ready Models
Discuss Your German BIM Requirements →
Germany Data Centre BIM

Send Your German BIM Scope

Tell us the HOAI work stage, the disciplines and whether an AIA is in place, and we will propose a team and model programme.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports GDPR-aligned data handling
ISO19650
BIM InformationUK BIM Framework compatible
German BIM Requirements

Working to German BIM Requirements on Data Centres

German clients set BIM requirements in their own terms. The model set-up follows them from the first exchange.

RequirementGerman termWhat we deliver
Employer’s information requirementsAIA (Auftraggeber-Informationsanforderungen)Models structured to the information the client asks for
BIM execution planBAP (BIM-Abwicklungsplan)Contribution to the BAP and modelling to its agreed rules
Guidelines and standardsVDI 2552 series and DIN EN ISO 19650Naming, level of information and processes to the guidelines specified
Data exchangeopenBIM with IFCIFC exports checked before each exchange
Issue trackingBCFClashes and queries exchanged as BCF issues
Efficiency Systems in the Model

Modelling Heat Reuse and Metering in German Data Centres

Heat reuse and energy reporting add plant, pipework and sensors that compete for space with cooling and power. They are coordinated like any other system.

Heat Recovery Plant Rooms

Heat exchangers and buffer tanks modelled at full size with maintenance space.

Heat Pump Locations

Heat pumps placed with acoustic, access and electrical supply requirements checked.

Heat Network Routes

Pipe routes to the site boundary modelled for the handover point to the network operator.

Metering Points

Energy and heat meters placed in the model for efficiency and reuse reporting.

From Planning to Installation

Data Centre Models Through German Planning Stages

In Germany, the planner’s design and the contractor’s installation planning are separate steps. Models are set up for both.

StageModel deliverableWho uses it
LP 2 VorplanungConcept models of plant rooms and main routesPlanners and the client
LP 3 EntwurfsplanungCoordinated design models by disciplinePlanners, for approval and costing
LP 5 AusführungsplanungDetailed coordinated MEP modelsTender and construction teams
Werk- und MontageplanungInstallation models with supports, spools and openingsTGA contractors and fabrication
LP 8 handoverAs-built models with asset dataOperator and facilities team
What We Deliver

Germany Data Centre BIM Deliverables

Revit MEP Models

Electrical, cooling, heat supply and fire protection models.

IFC Exchange Models

openBIM exports checked before each model exchange.

BCF Clash Reports

Clash tests run in Navisworks, with issues shared as BCF.

Montageplanung Models

Installation models with supports, spools and wall openings.

Opening and Slot Plans

Openings for pipes, ducts and containment taken from the model.

As-Built Models

Verified models and asset data for the operator.

Starting Montageplanung?

Send the Ausführungsplanung models and your installation schedule, and we will scope the installation modelling.

Send Your Models →
Frequently Asked Questions

Germany Data Centre BIM Modelling: FAQs

Do you model to an AIA and BAP?

Yes. Models are structured to the client’s employer’s information requirements (AIA) and modelled to the rules agreed in the BIM execution plan (BAP).

Do you exchange models in IFC?

Yes. Models are exported to IFC for openBIM exchange and checked before each issue, with clashes and queries shared as BCF issues.

Which BIM guidelines do you follow in Germany?

We follow the guidelines the project specifies, typically the VDI 2552 series and DIN EN ISO 19650, for naming, level of information and processes.

Can you produce models for Werk- und Montageplanung?

Yes. Installation models with supports, spools and wall openings are produced from the planner’s Ausführungsplanung for TGA contractors and fabrication.

Do you model heat reuse systems?

Yes. Heat recovery plant, heat pumps, heat network pipe routes and metering points are modelled and coordinated with cooling and power systems.

Which HOAI stages do you model for?

Models can be produced for Vorplanung, Entwurfsplanung and Ausführungsplanung, for the contractor’s installation planning, and as-built at handover.