Data Centre Estimating Services Ireland
Optimar Precon provides data centre estimating services in Ireland for main contractors, M&E contractors and developers: ARM4 bills of quantities, phase-by-phase cost plans and priced packages for the on-site power plant that most new Irish data centres now need.
Rates are priced in EUR with Irish labour rules, VAT treatment and tender price escalation built in, so your numbers hold up under an Irish quantity surveyor’s review.
Send Your Irish Tender Documents
Share the site, connection class, trades and tender date. We will confirm scope, fee and delivery date.
Group-wide figures across all Optimar Precon services.
How We Measure and Price On-Site Generation and Storage
Under Ireland’s connection rules, generation and storage can rival the data halls in value. Each item is measured and priced on its own basis.
| Package | Takeoff unit | What we capture | Typical cost basis |
|---|---|---|---|
| Gas engines or turbines | Each | Rating, de-rated output, enclosures, exhaust stacks | Vendor quote + installation labour |
| Battery energy storage (BESS) | Each container / MWh | Containers, inverters, transformers, fire separation | Vendor quote + civils and cabling |
| Gas supply connection | Linear metre + each | Pipeline route, above-ground installation, metering | Network operator charges + mechanical works |
| Generation grid connection | Each + linear metre | MV/HV switchgear, export metering, protection, cable route | Equipment quotes + civils and cabling |
| Fuel and backup systems | Each / litre | Standby fuel storage, day tanks, polishing | Material + labour |
| Plant civils | m² / m³ | Plinths, bunds, acoustic walls, access roads | ARM4-measured rates |
Generation packages are estimated separately from the data halls, so they can be procured, programmed and approved as their own contracts.
What Makes an Irish Data Centre Estimate Different
Irish rates, taxes and escalation differ from UK and US practice. We build them into the estimate from the start.
Sectoral Employment Orders
Labour rates checked against the construction and electrical contracting Sectoral Employment Orders that set minimum pay and pension terms.
VAT Treatment
Costs shown net of VAT, with the 13.5% construction services rate or other applicable rates applied in line with the client’s reporting.
Tender Price Escalation
Escalation to the tender and construction period referenced to Irish tender price indices such as the SCSI index.
Measurement to ARM4
Bills measured to the Agreed Rules of Measurement, so Irish quantity surveyors can check them without re-measuring.
Phased Import Capacity
Cost plans split by phase where import capacity ramps up as generation comes online.
Renewable Supply Interfaces
Connections for private-wire or on-site renewables priced where the 80% renewable requirement is met locally.
Irish Data Centre Estimates From Planning to Tender
Irish data centres often spend a long time in planning. Cost plans need to stay current through that period.
| Stage | Estimate deliverable | Why it matters in Ireland |
|---|---|---|
| Site selection | Order-of-cost estimate per MW and per site option | Compares constrained and regional sites with different generation needs |
| Planning application | Elemental cost plan including power plant | Generation and storage scope is fixed early in the planning submission |
| Post-planning design | Updated cost plan with escalation | Accounts for time spent in planning and any conditions attached |
| Tender | ARM4 bills of quantities by package | Data halls, M&E and power plant tendered as separate packages |
| Construction | Phase re-estimates and change pricing | Import capacity and generation delivered in steps |
Ireland Data Centre Estimating Deliverables
ARM4 Bills of Quantities
Measured BoQs for main contract, M&E and power plant packages.
Elemental Cost Plans
Cost plans from site selection through planning to tender, in EUR.
Power Plant Estimates
Gas generation, BESS and grid connection packages priced in full.
Tender Analysis
Levelling of M&E and power plant subcontractor returns.
Cash Flow by Phase
Expenditure profiles aligned to each energisation phase.
Change Pricing
Variations priced from measured quantities and agreed rates.
Related services: Ireland data centre preconstruction, Ireland data centre BIM modelling, preconstruction services Ireland, US data centre estimating.
Pricing a Tier B Site?
Send the drawings and connection details, and we will scope the data centre and its power plant estimate together.
Ireland Data Centre Estimating: FAQs
How do you estimate on-site generation for an Irish data centre?
Gas engines or turbines are counted by rating and de-rated output, with enclosures, exhaust, fuel and controls. Battery storage is priced per container or MWh, and the gas supply and separate grid connection are measured as their own packages.
Do your Irish estimates comply with Sectoral Employment Orders?
Yes. Labour rates are checked against the construction and electrical contracting Sectoral Employment Orders, which set minimum pay and pension terms for workers on Irish sites.
How do you handle escalation on Irish data centre projects?
Estimates are escalated to the tender and construction period using Irish tender price indices such as the SCSI index, which matters where projects spend a long time in planning.
Are Irish estimates shown with or without VAT?
Costs are shown net of VAT, with the 13.5% rate for construction services, or other applicable rates, applied separately in line with the client’s reporting, so the construction cost is clear.
Can you split the cost plan by energisation phase?
Yes. Where import capacity ramps up as generation comes online, the cost plan and cash flow are split by phase so each stage can be funded and approved.
Do you measure Irish bills of quantities to ARM4?
Yes. Bills for data halls, M&E and power plant packages are measured to the Agreed Rules of Measurement (ARM4), so Irish quantity surveyors can check them directly.
Price Irish Data Centres With Confidence
ARM4 BoQs and power plant packages, priced to Irish rates and phasing.