Abu Dhabi Municipality has made BIM part of how municipal infrastructure and assets projects are delivered, with processes based on ISO 19650. Optimar Precon is certified to ISO 19650-1 and supports consultants and contractors with infrastructure models, building models and the information management around them.
- Road, drainage and utility models in Civil 3D, federated with building models
- Container naming, status codes and delivery plans set up to ISO 19650
- Revit models for schools, clinics and public buildings tendered by government clients
Abu Dhabi BIM Enquiry
Attach the client’s EIR or BIM requirements, plus drawings or models. We’ll reply with a delivery plan and a fixed fee.
What the Municipality Has Put in Place
Four public facts that shape BIM scopes on Abu Dhabi work.
The Information Side of BIM, Handled
On ISO 19650 projects, missing paperwork causes as many rejections as a wrong model. Delivery plans, naming rules, status codes and approval records all have to line up. We look after that layer as well, so your team isn’t renaming files the night before an issue.
Delivery plans kept current
Task and master information delivery plans updated as drawings and models are added or moved.
Status codes applied correctly
Work in progress, shared and published containers are moved through the CDE with the right suitability codes.
Checked before every issue
Naming, metadata and model health are checked before anything leaves your work-in-progress area.
Roads, Utilities and Public Buildings
The kinds of Abu Dhabi package where clients now expect a model and an ISO 19650 audit trail.
Roads and corridors
Alignments, carriageway layers, kerbs and junctions modelled in Civil 3D, ready to federate with structures and services.
BIM modeling →Wet and dry utilities
Storm water, sewer, potable water, power and telecom networks with manholes and chambers, checked for crossings and cover depths.
Clash detection →Schools, clinics and mosques
Architecture, structure and MEP for government-tendered buildings, coordinated before construction starts.
MEP BIM →Information management support
BEP drafting support, CDE setup, naming audits and issue registers for teams new to ISO 19650 delivery.
About BEPs →Existing assets
Laser scans of existing buildings and plant rooms turned into Revit models for upgrades and maintenance records.
Point cloud to BIM →Object libraries
Revit families and object parameters matched to the client’s catalogue, so asset data comes through at handover.
Revit families →Records an Abu Dhabi Client Can Check
Alongside the models, each package includes the records a reviewer will ask for.
Responsibility matrix
Who models what, at what level of information need, recorded against each deliverable.
Naming audit
A list of every container checked against the project naming rules, with fixes noted.
Asset parameters
Object data filled in to the client’s parameter list, so it carries through to operations.
Utility crossing report
Every place where networks cross or come too close, with level, clearance and a proposed fix.
Model health check
Warnings, duplicates, coordinates and file size checked before each issue.
Secure handling
Government and developer data handled under our ISO/IEC 27001 and 27701 certified controls.
Optimar Precon holds ISO 19650-1:2018, ISO 9001:2015, ISO/IEC 27001:2022 and ISO/IEC 27701:2019 certification. Design responsibility and authority approvals remain with the appointed consultants.
Typical Abu Dhabi BIM Requests
Three common requests from Abu Dhabi consultants and contractors, with what is usually included.
Internal roads and utilities for a community
A civil consultant needs roads and all utility networks modelled and checked for crossings before the design is issued.
- You send
- Road and utility layouts, profiles
- You get
- Civil 3D model, crossing report
- Typical time
- 3–5 weeks
School block to an ISO 19650 EIR
A contractor with a government school needs architecture, structure and MEP models plus the information records.
- You send
- EIR, BEP, design drawings
- You get
- Models, TIDP, naming audit
- Typical time
- 4–6 weeks
CDE setup and audit for a new appointment
A team new to ISO 19650 delivery needs folders, naming rules and status codes set up before modelling starts.
- You send
- EIR, team list, CDE access
- You get
- CDE structure, rules sheet, training call
- Typical time
- 1–2 weeks
These are example scopes, not client case studies. For documented ISO 19650 work, see our UK university ISO 19650 project and other success stories.
From the Client’s EIR to the First Issue
Read the requirements
We go through the EIR, any municipality guidelines named in the contract, and the object catalogue.
Agree the plan
The responsibility matrix and TIDP are agreed with your information manager before any modelling.
Model and check
Models are built, then checked for health, naming and parameters inside your work-in-progress area.
Share and publish
Containers move to shared and published status with the records the reviewer will ask for.
Abu Dhabi BIM FAQs
Is BIM mandatory in Abu Dhabi?
Abu Dhabi Municipality requires BIM on its municipal infrastructure and assets projects, with no exception for size, stage or discipline. For buildings, the requirement usually comes from the client’s EIR or contract. Check your appointment documents for the exact terms.
Do you model infrastructure as well as buildings?
Yes. Roads, drainage and utility networks are modelled in Civil 3D and federated with Revit building models, so crossings and interfaces can be checked in one place.
What does ISO 19650 certification mean for our project?
Optimar Precon is certified to ISO 19650-1:2018. Our information management process has been audited against the standard, so naming, status codes and delivery planning follow the same rules your client expects.
Can you work inside our client’s CDE?
Yes. We work in ACC, BIM 360 or the CDE named in your contract, with the permissions and folder rules your information manager sets.
How are Abu Dhabi BIM packages priced?
As a fixed fee per package, or a monthly rate for a dedicated BIM modeller or coordinator on longer programmes. Send the EIR and drawings, or WhatsApp +91 88008 75774.