Why do some contractors lose nine out of ten bids while others with similar manpower and overhead can win three out of every four? Price wins most of the bids, but price is only an output of the estimate. If we dig into the reasons why contractors lose bids, we will find that the problem lies further upstream: in the drawings the price was based on, the quotes used, or the time that wasn’t spent to double-check the number.
Estimating mistakes cause contractors to be unsuccessful in winning contracts more often than higher costs. Nine of the main causes are overlooking addenda, using general waste ratios, over-padding, leveling the estimates of vendors and subcontractors, confusion with exclusions, old cost per unit prices, quick estimates, bidding the wrong projects, and incomplete response to bid form. All of them either raise the cost or conceal the scope of work necessary for a winning bid.
Must Losing a Bid Be a Matter of Price?
Usually, yes, although not necessarily as most people think. It does not mean that your team’s cost is several percent more than that of the winning company. Typically, it was the additional contingency built into your estimate, the price offered by one of your suppliers, or the scope belonging to another trade.
Reliable Construction Estimating Services help contractors build bids from verified quantities, current pricing, and clearly defined scope before adding contingency.
Then there is the other kind of losing bid that doesn’t appear on the bid list. You could even get the project and end up losing money on it due to missing some scope in your estimate. That’s what makes these mistakes so double-edged.
What Estimating Errors Lose Jobs for Contractors?
1. Estimating using an old or incomplete set of drawings
An addendum adding a mechanical room or a revision changing a wall construction type could shift the numbers one way or another. Those contractors who fail to do so either estimate scope that is already removed or omit scope that is added. In both cases, they are penalized.
Fix: Write down all addenda on a list, check the most recent revision on each sheet before measuring, and indicate the addenda estimated in your bid form.
Our guide to construction takeoff and estimation explains how drawing revisions, measurement, and pricing connect during bid preparation.
2. Applying one allowance factor to everything
The use of one allowance factor is very costly because some materials are over-allocated while others are under-allocated. For instance, tile and framing allowances are higher compared to those of conduit runs and structural steel. This is not reflected in one allowance factor.
MEP Estimating Services can apply trade-specific material, labor, and waste assumptions instead of relying on one generalized factor.
Fix: Allowances must be set for materials per trade depending on the history of your projects.
3. Contingency to compensate for a takeoff that doesn’t get the nod
If the estimator is not sure of the quantities, the instinctive move is always to put in contingency. That is all it takes sometimes to make the difference between being second and winning.
Fix: Have another pair of eyes check the takeoff so that the contingency reflects the risks, rather than any uncertainty over the takeoff. Independent Construction Takeoff Services can help verify quantities before contingency is added to the bid.
4. Taking in subcontractor and supplier quotes but not leveling them
Quotes come in with their own exclusions and are never in a common format. Using the complete one, or the only one available, can result in double paying for something or completely missing the scope.
Fix: Always level the quotes with the same scope sheet before selecting, and chase up those quotes early, rather than the last minute.
5. Ambiguous qualifications and exclusions
A general contractor comparing ten subcontractor bids will level them too. If your exclusions are unclear, they may add an allowance to your number to cover what you didn’t say, and your bid suddenly looks higher than it is. Clear qualifications make your price easier to accept. Spell out:
- What’s included and excluded, line by line, not in a single sentence.
- The drawings and addenda you priced from, by sheet and revision.
- Assumptions that affect cost, such as working hours, access, or phasing.
- How long the price is valid, matched to your supplier quotes.
Fix: Use the qualifications form and customize it for your proposal.
6. Out-of-date unit costs and labor rates
If the cost of materials and labor have changed since you last updated your database, any bid you make will be based on incorrect numbers. For certain trades, this can result either in underbidding or overbidding.
Fix: Review materials like metals and fuel quarterly, and fully update your unit costs before every bid season begins.
7. Bidding too quickly due to workload pressure
When more bids come in than your estimating team can handle, corners have to be cut. Take-offs become inadequate, the leveling process doesn’t take place, and even the review stage gets skipped. There are companies that turn down potentially profitable projects simply because they don’t have time to bid on them.
Fix: Match bid volume to estimating capacity. If you can’t hire quickly, a dedicated estimator working inside your process can add capacity without a long recruiting cycle.
8. Bidding jobs that you would probably lose anyway
Every bid takes estimating hours. Chasing projects outside your sweet spot, with unfamiliar GCs or a long list of bidders, spreads those hours thin and drags down the quality of the bids you could have won. A quick bid/no-bid check helps. Look at:
- Fit. Is it the type and size of work you do well?
- Relationship. Have you won with this GC or owner before?
- Competition. How many bidders, and who are they?
- Capacity. Can you price it properly before the deadline?
Fix: Rate each invitation in relation to these questions before spending time on the estimate.
9. Submission of a non-responsive bid
On public jobs and many private ones, failure to include a bond, an unsigned document, an acknowledgment of an addendum, or an untimely submission will render the bid disqualified before any price is reviewed.
Fix: Use a checklist for every bid, having someone other than the estimator review it.
Which Mistakes Push the Price Up, and Which Push It Down?
It helps to know which way each mistake moves the number, because it tells you what to look for after a loss:
| Mistake | Usually pushes price | Main risk |
|---|---|---|
| Outdated drawings | Either way | Wrong scope |
| One waste factor for everything | Either way | Shortfalls or overpricing by trade |
| Padding an untrusted takeoff | Up | Losing on price |
| Unleveled quotes | Either way | Double-counted or missing scope |
| Vague exclusions | Up (after GC leveling) | Bid looks higher than it is |
| Stale unit costs | Usually down | Winning at a loss |
| Rushed bids | Either way | Errors nobody catches |
| Bidding poor-fit jobs | Not price | Low win rate, wasted hours |
| Non-responsive bid | Not price | Disqualified |
How Do You Find Out Why You Lost a Bid?
Most contractors never ask, which means the same mistake repeats on the next bid. A short review after each loss is worth the time:
- Ask for the bid results. Many GCs will share where you ranked, and public owners often publish bid tabulations.
- Compare by trade or division. If you were close overall but far off on one division, that’s where to look.
- Track your hit rate. Record wins and losses by project type, client, and size to see where you actually compete.
- Feed it back. Update unit costs, allowances, and your bid/no-bid criteria based on what you learn.
Losing bids you should be winning? Optimar Precon’s estimators produce checked, trade-by-trade construction estimates in your format, with clear qualifications and leveled quotes. Send your drawings for a fixed quote within 24 working hours, depending on complexity.
FAQs
More often than not, because of inaccurate estimates in the pricing process. Whether through missing addenda, padding, unleveled pricing, ambiguous exclusions, outdated cost data, or sloppy takeoff. Each of which either increases the price or conceals scope.
Bid fewer, but better-matching projects, complete each project with verified takeoff and unleveled pricing, qualify your bids, and analyze each loss to understand where the number was wrong.
It is a bid that fails to comply with the submission guidelines, e.g., lack of bond, unsigned form, or unrecognized addendum. You can turn it down regardless of the bid price.
Yes. They’re usually willing to tell you where you fell short and how far off you were, and that information is among the most valuable inputs for your next bid.
This will vary from project to project, but the bottom line is: quality. When takeoffs aren’t being reviewed, and quotes aren’t being leveled, the company is biting off more than it can chew.