California · Hospital seismic upgrades · Healthcare · Labs · Existing buildings

BIM Services in California

By January 1, 2030, California’s general acute care hospitals must be able to keep operating after a major earthquake. That means retrofitting or replacing many hospital buildings, often while patients are still being treated next door. Optimar Precon provides BIM services in California for contractors, engineers and healthcare facility teams working on those projects, along with labs and other complex buildings.

  • Existing hospital wings modeled from laser scans
  • MEP, bracing and equipment coordinated in tight ceilings
  • Phased models for work inside operating facilities

California BIM Enquiry

Facility type, whether it’s a retrofit or new build, and the disciplines to model.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO 19650Certified for BIM, plus ISO 9001 & 27001
The 2030 hospital deadline

A Statewide Hospital Upgrade Program

California’s hospital seismic law is driving years of complex retrofit work.

Jan 1, 2030deadline for hospitals to stay operational after an earthquake
45%of hospitals statewide on track to meet it, according to the state’s health facility agency
$143–176Bestimated statewide cost of compliance
1994year the law was passed, after the Northridge earthquake

California HCAI and RAND Corporation figures, as reported in 2025.

Why hospitals need BIM

Staying Open Means Services Must Survive Too

A hospital that stands after an earthquake still can’t operate if its pipes, ducts and equipment fail. Upgrades therefore touch structure and nonstructural systems at once: bracing, anchorage, medical gases and emergency power, in ceilings already full of services. Coordinating that in a model is far cheaper than discovering conflicts during a shutdown.

Brace

Bracing in the model

Seismic bracing and supports placed and checked against other trades.

Live

Work in live facilities

Phasing that keeps patient areas and critical systems running.

Rev

Review-ready drawings

Clear coordinated drawings to support your team’s agency submittals.

BIM model of a California hospital retrofit
California BIM work

BIM for California’s Complex Buildings

Healthcare first, plus labs, campuses and commercial projects.

Hospital retrofits

Existing wings modeled, new structure and services coordinated.

BIM modeling →

MEP coordination

Medical gas, HVAC, plumbing and electrical coordinated with bracing.

MEP BIM →

Structural models

Steel and concrete upgrades modeled with the systems they affect.

Structural BIM →

Labs and life science

Fume hoods, exhaust and process services in research buildings.

BIM coordination →
Platforms: RevitNavisworksRecapACC
Deliverables

What Healthcare Project Teams Receive

For general contractors, engineers and facility teams.

Existing-conditions model

Wings, plant rooms and ceilings as they are today.

Coordinated upgrade model

New structure, bracing and services together.

Phasing plans

Work areas and shutdowns shown stage by stage.

Clash reports

Issues by room and zone, tracked to closure.

Installation drawings

Coordinated layouts for each trade.

As-built model

Final conditions for the facility’s records.

We model from your design. Seismic design, agency submittals and stamped drawings remain with your licensed engineers and architects.

Example scopes

Typical California Requests

Three kinds of job California teams send us.

Example scope · Healthcare

Hospital wing seismic upgrade

A contractor needs the existing wing and new bracing modeled together.

You send
Scan, upgrade design
You get
Coordinated model, phasing plans
Typical time
6–12 weeks
Example scope · Life science

Lab fit-out in a Bay Area building

An MEP contractor needs exhaust and process services coordinated.

You send
MEP design, base building model
You get
Coordinated model, shop drawings
Typical time
4–6 weeks
Example scope · Survey

Medical office building as-built

A facility team needs a model before planning upgrades.

You send
Point cloud, old drawings
You get
As-built Revit model
Typical time
2–4 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

How it runs

Modeling an Occupied Hospital

Capture

Scan data and records gathered for each work area.

Model existing

Structure and services modeled as built.

Coordinate upgrades

New work and bracing checked against retained systems.

Plan shutdowns

Phasing views issued for each stage.

FAQs

BIM Services in California: FAQs

Can you help with hospital seismic upgrade projects?

Yes. We model existing hospital buildings and coordinate new structure, bracing and services, working from your engineers’ design.

Do you prepare agency submittals or seismic design?

No. Seismic design, agency submittals and stamped drawings remain with your licensed California engineers and architects. We provide modeling and coordination support.

Can you model occupied facilities?

Yes. We build phased models so work can be planned around patient areas and critical systems that must keep running.

Do you work on labs and life science buildings?

Yes. We coordinate exhaust, process piping and MEP services for lab fit-outs and research buildings.

How is California BIM work priced?

As a fixed fee based on area, disciplines and level of detail. Email support@optimarprecon.com or call +1 (469) 210-7530 for a quote.

Working Toward the 2030 Deadline?

Send the scope and what you know about the building. We’ll suggest a modeling plan.

Scroll to Top