Singapore | Green Data Centres

Data Centre Preconstruction Services Singapore

Optimar Precon supports main contractors and M&E contractors in Singapore with data centre preconstruction services: BoQs in SGD, MEP takeoff and BIM coordination for data centres built to Singapore’s green capacity rules and tropical climate.

Coordinated from our New Delhi office, two and a half hours behind Singapore, with models prepared for CORENET X submissions.

BoQs in SGD
Green Mark DC Scope
CORENET X-Ready BIM
Overlap With Singapore Hours
Discuss Your Singapore Data Centre Project →
Singapore Data Centre Projects

Send Your Singapore Project

Share the site, project stage, M&E packages and tender date, and we will confirm scope, fee and delivery.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports PDPA-aligned handling
ISO19650
BIM InformationStructured model and data exchange
Capacity Allocation

How Singapore Allocates New Data Centre Capacity

New capacity in Singapore is allocated by government call for application, and each call sets the efficiency and green energy terms the facility must be built to.

MilestoneWhat happenedWhat it means for the build
2019 to 2022Pause on new data centres, relaxed in July 2022New capacity only through government allocation
2023 pilot call80 MW allocated to four operatorsFirst facilities built to the new efficiency terms
Green Data Centre Roadmap, 2024Efficiency targets for new builds, including PUE below 1.3High-efficiency plant assumed from concept
Second call, launched December 2025200 MW provisionally allocated in August 2026, 50 MW to each of four operatorsFacilities to be built on a low-carbon data centre park on Jurong Island
Next callTo be reviewed in 18 to 24 monthsFurther capacity tied to green energy and efficiency

Second-call operators committed to powering more than half their capacity from green energy, using liquid cooling and meeting Green Mark for Data Centres Platinum.

Tropical and Green

Designing Data Centres for Singapore’s Climate and Green Rules

Singapore’s heat, humidity and land constraints shape the M&E scope as much as the allocation terms do.

No Free Cooling Season

High temperature and humidity all year mean mechanical cooling runs continuously, so plant efficiency drives cost.

Liquid Cooling

Coolant distribution units, secondary loops and rack connections priced as their own packages.

Green Mark for Data Centres

Platinum-level measures such as efficient plant, metering and controls carried as cost items.

Low-Carbon Power

Fuel systems for biomethane, hydrogen or ammonia pathways, and building-integrated solar where specified.

Multi-Storey Data Halls

Stacked halls with heavy floor loads, long vertical risers and plant on several levels.

Dehumidification

Humidity control and condensation protection for air systems and pipework.

Approvals and Format

Singapore Approvals and Estimate Structure

AreaSingapore requirementHow we deliver it
Building approvalsCORENET X, mandatory for all new projects from 1 October 2026Models and drawings organised for the approval gateways
BIM formatIFC-SG models for new erections or major A&A works with new GFA of 5,000 m² or moreIFC-SG exports checked before submission
Fire safetySCDF Fire Code approvalSuppression and detection scope to SCDF requirements
ElectricalSS 638 code of practice for electrical installationsElectrical scope priced to SS 638
Measurement and taxSingapore Standard Method of Measurement or client format, net of 9% GSTBoQs in SGD with GST shown separately
Jurong and Jurong IslandLoyangTai SengKranjiTuas
What We Deliver

Preconstruction Services for Singapore Data Centres

Priced BoQs in SGD

Main contract and M&E BoQs in SMM or the client format.

M&E Takeoff

Quantities by system, hall and level for your own pricing.

Liquid Cooling Estimates

CDUs, secondary loops and rack connections priced separately.

IFC-SG BIM Models

Revit MEP models with IFC-SG exports for CORENET X.

Clash Coordination

Navisworks clash detection across stacked halls and risers.

Dedicated Teams

Full-time estimators or BIM coordinators working Singapore hours.

Bidding a Singapore Data Centre?

Share the tender drawings and the SMM or client BoQ, and we will scope the M&E pricing around your closing date.

Send Your Tender →
Singapore Market Snapshot

Singapore Data Centre Capacity Built to Green Terms

Singapore’s latest allocation shows how capacity, location and sustainability terms are fixed before design begins.

Capacity Allocation

Low-Carbon Data Centre Park

Jurong Island
Scale
200 MW provisionally allocated across four operators, 50 MW each
Status (August 2026)
Capacity allocated; facilities to be built on a low-carbon park being developed by JTC
Requirements
More than 50% green energy, liquid cooling and Green Mark for Data Centres Platinum

Preconstruction takeaway: allocation terms fix green energy and efficiency commitments early, so the first cost plan must already price liquid cooling, low-carbon fuel systems and Platinum-level measures.

Anonymized examples of publicly reported Singapore projects, shown for market context. These are not Optimar Precon projects, and figures may have changed since the dates shown.

Frequently Asked Questions

Singapore Data Centre Preconstruction: FAQs

How does Singapore allocate new data centre capacity?

New capacity is allocated through government calls for application run by EDB and IMDA. The second call, launched in December 2025, provisionally allocated 200 MW in August 2026, with operators committing to green energy and high efficiency.

What did the second data centre call require?

Selected operators committed to powering more than 50% of their capacity from green energy, using liquid cooling and energy-efficient IT equipment, and meeting Green Mark for Data Centres Platinum certification.

Is CORENET X mandatory for new data centre projects?

Yes. CORENET X submission is mandatory for all new projects from 1 October 2026, and for ongoing projects from 1 October 2027.

Do you deliver IFC-SG models?

Yes. Revit MEP models can be exported to IFC-SG and checked before submission, as required for new erections and major A&A works with new GFA of 5,000 m² or more.

Which BoQ format do you use for Singapore tenders?

BoQs follow the Singapore Standard Method of Measurement or the client’s own format, priced in SGD with 9% GST shown separately.

How do you work with Singapore project teams?

Coordination runs from our New Delhi office, two and a half hours behind Singapore, so reviews and model exchanges happen within Singapore working hours.

Price Singapore Data Centres to Green Capacity Rules

BoQs, MEP takeoff and IFC-SG models for tropical, high-efficiency facilities.

Start Your Singapore Project →
Scroll to Top