Singapore | Data Centre BIM and Coordination

Data Centre BIM Modelling Services Singapore

Optimar Precon provides data centre BIM modelling services in Singapore for consultants and M&E contractors: IFC-SG models prepared for each CORENET X gateway, coordination for multi-storey data halls and models that feed prefabrication.

Models are built so the same data supports approvals, installation and handover, in line with Singapore’s push for integrated digital delivery.

IFC-SG Models by Gateway
Multi-Storey Coordination
Prefabrication Models
Handover-Ready Data
Discuss Your Singapore BIM Requirements →
Singapore Data Centre BIM

Send Your Singapore BIM Scope

Tell us the gateway you are preparing for, the disciplines and the model dates, and we will propose a team and programme.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports PDPA-aligned handling
ISO19650
BIM InformationStructured model and data exchange
CORENET X Gateways

Data Centre Models for Each CORENET X Gateway

CORENET X approvals run through a series of gateways. The model develops at each one, so it is planned from the start to carry what each review needs.

GatewayWhat the model supportsOur focus
Design GatewayDesign approval by the regulatory agenciesCoordinated architectural, structural and M&E models exported to IFC-SG
Piling Gateway (optional)Early start on piling worksStructural and site models for the piling submission
Construction GatewayApproval to start building worksDetailed M&E models, fire protection and services coordination
Completion GatewayApproval to occupyAs-built models updated with installed changes

IFC-SG exports are checked for the required properties before each submission, so models are not returned for missing data.

Multi-Storey Data Halls

Coordinating Multi-Storey Data Centres in Singapore

Limited land means Singapore data centres stack halls and plant over several levels. Vertical coordination becomes the main challenge.

Vertical Risers

Power, cooling and fire services risers coordinated floor by floor, with spare capacity reserved.

Plant on Several Levels

Chillers, pumps and electrical rooms placed with structural loads and access checked.

Liquid Cooling per Floor

Secondary loops and CDUs routed on each data hall level without clashing with containment.

Hoisting Routes

Paths for lifting heavy equipment to upper floors kept clear in the model.

Integrated Digital Delivery

Data Centre Models Across BCA’s Integrated Digital Delivery Stages

BCA’s Integrated Digital Delivery (IDD) links design, fabrication, construction and operation through one set of digital data. The data centre model is set up to serve each stage.

IDD stageModel deliverableOn a Singapore data centre
Digital designCoordinated models exported to IFC-SGSubmitted through the CORENET X gateways
Digital fabricationSpool, rack and module modelsSupports DfMA and prefabricated M&E for faster, safer installation
Digital constructionModel views by level and zoneProgress on stacked data halls checked floor by floor
Digital asset deliveryAs-built models with equipment dataHanded to the operator for facilities management
What We Deliver

Singapore Data Centre BIM Deliverables

IFC-SG Submission Models

Models exported and checked for each CORENET X gateway.

Revit M&E Models

Electrical, mechanical, plumbing and fire protection models.

Clash Reports

Navisworks clash tests across levels, with issues tracked to closure.

Combined Services Drawings

Coordinated drawings for installation and builder’s work.

Prefabrication Models

Spool, rack and module models for offsite fabrication.

As-Built Models

Verified models with equipment data at completion.

Preparing for a CORENET X Gateway?

Send the current models and gateway date, and we will scope the IFC-SG modelling and checks.

Send Your Models →
Frequently Asked Questions

Singapore Data Centre BIM Modelling: FAQs

How do you prepare models for CORENET X gateways?

Models are developed for the Design, Construction and Completion Gateways, and the optional Piling Gateway, with IFC-SG exports checked for required properties before each submission.

What does IFC-SG require from a data centre model?

IFC-SG requires specific properties on building elements so regulatory agencies can check them. Exports are checked before issue so models are not returned for missing data.

How do you coordinate multi-storey data centres?

Risers, plant on several levels, liquid cooling loops on each data hall floor and hoisting routes are coordinated floor by floor in a federated model.

Do your models support BCA’s Integrated Digital Delivery?

Yes. The same model supports digital design for CORENET X, digital fabrication of prefabricated M&E, construction progress by floor and as-built data for the operator.

Do you coordinate fire protection for SCDF submissions?

Yes. Sprinkler, gas suppression and detection layouts are coordinated in the model to the SCDF Fire Code, ready for the fire safety submission.

Is IFC-SG needed for every data centre project?

IFC-SG is required for new erections and major addition and alteration works with new gross floor area of 5,000 m² or more, which covers most new data centres. Smaller works follow other CORENET X submission routes.

Model Singapore Data Centres From Approval to Handover

IFC-SG models by gateway, coordinated across every level and ready for fabrication.

Send Your BIM Scope →
Scroll to Top