BIM Services in Dubai

Since 1 January 2024, Dubai Municipality has required BIM models in IFC format with the building permit application for tall, large, specialised and government buildings. Optimar Precon prepares the submission model for your consultant and the coordinated trade models your site team will build from.

  • IFC exports checked before they’re uploaded to the Build in Dubai portal
  • Separate architectural and structural models, since the two have different thresholds
  • MEP coordination for towers, hospitals and data halls after the permit is issued

Dubai BIM Submission or Coordination

Tell us the floor count, gross area and building use, and attach drawings or models. We’ll confirm the scope and fee.

29+Years of group experience
3,270+Projects completed
98%Client retention
ISO 19650Certified for BIM, plus ISO 9001 & 27001
Dubai Municipality BIM mandate

Does Your Building Need a BIM Submission?

The four categories in the mandate that took effect on 1 January 2024. If your project meets any one of them, the permit application needs IFC models.

20 / 40floors: above 20 for architectural design, above 40 for structural design
20k / 30k m²area: above 20,000 m² for architectural, above 30,000 m² for structural
Specialisedbuildings such as hospitals and universities, whatever their size
Governmentprojects, except utility infrastructure
Avoid a returned application

Submission Models That Read Correctly in IFC

A Revit model that looks right on screen can still export badly. Levels, classifications and room data are often lost when it is converted to IFC. We test the export before your consultant uploads it, so comments are about the design rather than about the file.

IFC

Export checked in a viewer

We open each IFC file outside Revit and confirm storeys, spaces, element types and properties before it goes in.

A/S

Architecture and structure kept apart

A 30-floor tower can trigger the architectural rule but not the structural one, so each model is scoped separately.

Rev

Comment rounds turned around fast

When the municipality or your consultant returns comments, the model is updated and re-exported, usually within two working days.

Revit model of a Dubai tower being prepared for IFC export
What Dubai teams order

From the Permit Model to Site Coordination

Most Dubai projects need two kinds of BIM: one for the authority and one for the people building it.

Architectural permit model

Walls, slabs, openings, rooms and areas modelled from the design drawings and exported to IFC for the building permit.

BIM modeling →

Structural permit model

Foundations, cores, columns, transfer beams and slabs for towers above 40 floors or 30,000 m², matched to the engineer’s drawings.

Structural BIM →

Tower MEP coordination

Riser, shaft and ceiling-void coordination floor by floor, with clash reports issued before each weekly meeting.

MEP BIM →

Hospitals and universities

Specialised buildings with medical gas, heavy services and dense plant rooms. These need a submission model whatever their size.

Clash detection →

Curtain wall and façade

Unitised panels, brackets and slab-edge interfaces modelled so the façade contractor can check fixings against the frame.

Façade BIM →

Federated model management

Trade models combined in Navisworks or ACC, with an issue log that tracks each clash from detection to sign-off.

BIM coordination →
Tools: RevitNavisworksAutodesk Construction CloudIFC viewers
What you receive

A Dubai BIM Handover, File by File

Each delivery comes with the native model and everything your consultant needs to submit or coordinate.

Native Revit files

Your model, in your Revit version, built on your template or ours, ready for future design changes.

Submission-ready IFC

An IFC export for each discipline, with a short note listing what was checked and any known limits.

Area and floor schedule

Floor counts and gross areas taken from the model, so the mandate thresholds can be confirmed from data.

Clash report with views

Grouped clashes with saved viewpoints, owner and due date, sorted so the meeting starts with the critical ones.

Comment response log

Each authority or consultant comment, the change made and the sheet or element it affected.

ISO 19650 file naming

Containers named and status-coded to your BEP. We are certified to ISO 19650-1.

Optimar Precon is certified to ISO 19650-1:2018, ISO 9001:2015, ISO/IEC 27001:2022 and ISO/IEC 27701:2019. We prepare models from your design information. The appointed consultant remains responsible for the submission and for design approval.

Proof and example scopes

Dense MEP, Already Coordinated Once

A published coordination programme, plus three Dubai requests in the shape we usually receive them.

Federated MEP model of a data centre with clashes highlighted
Success story · Hyperscale data centre · US

1,268 MEP issues closed before construction release

Five trade models, two data halls and six electrical rooms, with no single coordinator. Over 11 weeks of weekly cycles, 9,847 raw clashes were filtered to 1,412 real issues and worked to closure. Dubai hospital and tower plant floors have the same kind of density.

11 wksTo construction release
1,268Issues resolved in model
68Slab penetrations fixed before pour
Read the case study →
Example scope · Residential tower

Architectural IFC for a 2B+G+28 tower

Above 20 floors, so architecture needs a submission model. Below 40, so structure doesn’t, unless the area rule applies.

You send
Permit drawing set, area statement
You get
Revit model, IFC, checked export note
Typical time
2–3 weeks
Example scope · Healthcare

Clinic block with medical gas

A specialised building that needs a submission model, followed by MEP coordination for the contractor.

You send
Arch, structure and MEP design
You get
Submission IFC, then clash cycles
Typical time
3–5 weeks
Example scope · Comment round

Model update after authority comments

A consultant has comments back on an earlier submission and needs the model and IFC revised quickly.

You send
Model, comment sheet
You get
Updated IFC, response log
Typical time
2–4 working days

The three cards are typical requests, not completed client projects. Timings depend on your drawings. More examples are in our success stories.

Permit to site

Where We Fit in a Dubai Project

Threshold check

We read the floor count, area and use from your drawings and list which models the submission needs.

Submission model

Architecture and, where needed, structure modelled and exported to IFC for your consultant to upload.

Comment rounds

Returned comments are fixed in the model and logged, then a new IFC is issued.

Construction coordination

Once the permit is in hand, MEP and façade models are added and coordinated for site.

FAQs

Dubai BIM Mandate Questions

Which Dubai buildings need a BIM model for the permit?

Under the mandate effective 1 January 2024: buildings above 20 floors or 20,000 m² for architectural design, above 40 floors or 30,000 m² for structural design, specialised buildings such as hospitals and universities, and government projects other than utility infrastructure. Your consultant should confirm how this applies to your plot.

What file format does Dubai Municipality accept?

The mandate asks for models in IFC (Industry Foundation Classes) format, submitted through the Build in Dubai platform. We deliver the IFC together with the native Revit model.

Can you submit the model for us?

No. The submission is made by your appointed consultant. We prepare and check the model and the IFC export, and we update them when comments come back.

We only have AutoCAD drawings. Can you still build the model?

Yes. Most submission models we build start from 2D drawings. Anything unclear in the drawings is raised as a query before modelling continues, so the model matches the approved design.

How much does a Dubai BIM submission model cost?

The fee depends on floor count, how many typical floors repeat, and whether structure is needed as well as architecture. Send the drawing set or WhatsApp +91 88008 75774 for a fixed quote.

Not Sure If Your Project Is Covered?

Send the floor count and gross area. We’ll tell you which models the permit needs and what they will cost.