BIM Services in the UAE
Optimar Precon builds Revit models, MEP coordination models and clash reports for main contractors, MEP subcontractors and consultants across the UAE, delivered to your BIM execution plan and coordination schedule.
- Architectural, structural and MEP models in Revit, from LOD 300 to LOD 400
- Federated clash detection in Navisworks, with issue reports ready for each coordination meeting
- Team 1.5 hours ahead of UAE time, so we join your coordination meetings live
Get a UAE BIM Quote
Share drawings, Revit or IFC models and your BEP, plus the next coordination milestone. We reply with scope, fee and delivery date.
BIM Capacity for Fast-Track UAE Projects
Towers, hospitals and data centres in the UAE pack dense MEP into tight ceiling zones, often on compressed programmes. We add modelers and coordinators when your own BIM team is stretched, working inside your models and standards.
Your BEP and standards
We follow your BIM execution plan, templates, shared coordinates and ISO 19650 file naming from the first model issue.
Strong on building services
Chilled water, ductwork, cable trays, drainage and fire fighting, coordinated in plant rooms, risers and ceiling voids.
Live in your coordination meetings
India is 1.5 hours ahead of the UAE, so clash reviews and model updates happen during your working week.
BIM Services for UAE Projects
Order one discipline or a full coordination package. Each service links to more detail.
Architectural and structural BIM
Revit models of walls, floors, ceilings, facades, concrete and steel, built from approved design drawings to the agreed LOD.
BIM modeling →MEP BIM modeling
HVAC, chilled water, electrical, plumbing, drainage and fire fighting, modeled with real equipment sizes and access zones.
MEP BIM →BIM coordination
Federated models, weekly coordination cycles and an issue register that the main contractor and trades work from.
BIM coordination →Clash detection
Navisworks clash tests filtered into real issues, grouped by zone and trade, and issued as viewpoints or BCF files.
Clash detection →CAD to BIM
2D CAD and PDF drawing sets turned into editable Revit models for design development, coordination or refurbishment.
CAD to BIM →Scan to BIM
Existing buildings modeled from your laser-scan point clouds, for retrofits, fit-outs and facility records.
Point cloud to BIM →Models Set Up the Way UAE Projects Require
What UAE clients, consultants and main contractors usually ask for in a BIM scope, and how we handle it.
Authority BIM submissions
Dubai Municipality requires BIM for larger and specialist buildings. We prepare models to your consultant’s submission requirements.
ISO 19650 and EIRs
Many UAE developers and government clients write ISO 19650 into their information requirements. We follow the naming, status codes and exchange rules in your EIR and BEP.
Right LOD for the job
LOD 300 for design coordination, LOD 350 where trades need connections and supports, and LOD 400 only where a model is used for fabrication.
Handover data
Asset parameters and COBie-style data for developers and facility managers, when it’s included in the scope.
Open exchanges
Native RVT plus IFC exports and BCF issue files, so consultants and trades on other platforms can still take part.
Model QA before every issue
Shared coordinates, levels, worksets, parameters and file naming are checked before each model goes out.
We build and coordinate models from your design information. Design decisions, engineering checks and authority approvals stay with the appointed consultants.
How We Run MEP Coordination
A documented data centre coordination programme, and three typical UAE BIM packages.
1,268 MEP issues resolved before construction release
On a 24 MW data centre fit-out with two data halls and six electrical rooms, five trade models had no single coordinator. We ran an 11-week federated programme with weekly clash cycles. The first run showed 9,847 raw clashes, which we filtered into 1,412 real issues and tracked to closure. UAE data centre and hospital projects face the same density.
MEP coordination for typical tower floors
A main contractor needs trade models federated and clash-checked floor by floor ahead of each pour cycle.
- You send
- Trade models, BEP, programme
- You get
- Weekly clash reports, issue register
- Typical time
- First report in 1–2 weeks, then weekly
CAD to BIM for a refurbishment wing
A contractor has only 2D drawings of an existing wing and needs a Revit model to plan new MEP routes.
- You send
- As-built CAD, survey notes
- You get
- Architectural and MEP Revit model
- Typical time
- 3–4 weeks
Structural and MEP model at LOD 300
A design-and-build contractor needs a coordinated model of a steel warehouse for design review and quantities.
- You send
- Structural and MEP drawings
- You get
- Coordinated RVT plus IFC, clash report
- Typical time
- 2–3 weeks
The three packages are example scopes, not client case studies. Your quote is based on your own models and drawings. See more in our success stories, including our ISO 19650 university project.
From BEP to Coordinated Models
Scope and BEP review
We review your models, drawings and BEP, then confirm disciplines, LOD, fee and milestones.
Model setup
We set up shared coordinates, templates, worksets and file naming before any modeling starts.
Model and federate
We model each discipline, then combine them in Navisworks. Anything unclear in the design goes back to you as an RFI.
Clash cycles and issue
Weekly clash runs, filtered issue reports and checked model issues, timed to your coordination meetings.
Questions UAE Teams Ask About BIM
Will you work to our BIM execution plan and ISO 19650 requirements?
Yes. We follow your BEP, templates, shared coordinates and the naming, status and exchange rules in your information requirements, including ISO 19650 conventions where the client specifies them.
Which LOD do you model to?
Usually LOD 300 for design coordination and LOD 350 where trades need connections, supports and clearances. We model to LOD 400 only when the model will be used for fabrication and the inputs support it.
Can you join our weekly coordination meetings?
Yes. Our team is 1.5 hours ahead of the UAE, so we join meetings live during your working day, present clash reports and update the models straight after. You can also reach us on WhatsApp at +91 88008 75774.
Can you prepare models for a Dubai Municipality BIM submission?
Yes. We build and check the models to your consultant’s submission requirements. The submission itself and design responsibility stay with the appointed consultant.
How is BIM work priced?
As a fixed fee per modeling package, based on area, disciplines, LOD and deadline. For ongoing coordination, you can hire a dedicated BIM modeler or coordinator on a monthly basis.
Related UAE services
Coordination Meeting Coming Up?
Send the models, BEP and your next milestone. You’ll get a scope, a fixed fee and a delivery date, usually the same working day.