Quantity Takeoff Services in Singapore
Optimar Precon measures quantities from drawings and BIM models for Singapore main contractors, subcontractors, quantity surveyors and developers, so your team can price, procure and check subcontractor quotes faster.
Every takeoff comes with colour-coded marked-up drawings and is organised the way Singapore QS teams build their bills.
Quick answer: Our Singapore takeoff services measure piling, substructure, reinforced concrete, precast and PPVC, architectural finishes and M&E quantities from 2D drawings or models, delivered in Excel, CostX or Bluebeam with a fixed quote within 24 working hours depending on project complexity.
- SMM2-style measurement on request
- Drawing and model-based takeoff
- Same-day clarifications
Request Quantities for Your Singapore Project
Tell us the packages to measure, whether you have drawings or models, and your tender closing date.
Why Singapore QS Teams Outsource the Measuring
Quantity surveyors in Singapore are stretched across tenders, variations, progress claims and final accounts at the same time. Measurement is usually the most time-consuming part of a tender, and it is also the part that is easiest to hand over without losing control of the commercial outcome.
When we measure, your QSs keep the pricing, rates and negotiation. They receive quantities they can trace line by line to marked-up drawings, and spend their time checking and pricing instead of scaling.
What is a quantity takeoff? A quantity takeoff is the process of measuring the materials and work items shown in drawings or models, such as cubic metres of concrete, tonnes of reinforcement or square metres of ceiling, and organising them so they can be priced or ordered.
- Measurement following SMM2 principles or your firm’s own rules
- Item descriptions written to suit your BQ format
- Drawing conflicts and missing information logged as tender queries
Takeoff Scope for Singapore Building Projects
| Package | What we measure | Typical units |
|---|---|---|
| Piling and substructure | Bored and driven piles, pile caps, ground beams, basement slabs and walls | no., m, m³, m² |
| Reinforced concrete frame | Concrete by grade, formwork by element, reinforcement by bar size | m³, m², t |
| Precast and PPVC | Precast elements, PPVC modules, prefabricated bathroom units, joints | no., m |
| Structural steel | Members by section, plates, connections and protective coatings | t, m², no. |
| Architectural works | Drywall partitions, ceilings, floor and wall finishes, doors, windows, waterproofing | m², m, no. |
| External works | Drains, roads, paving, turfing and boundary walls | m, m², m³ |
| M&E | ACMV ductwork and pipework, electrical points and containment, plumbing and sanitary, fire protection | m, m², no. |
Trade Takeoff Services
Concrete Takeoff
View service →Structural Steel Takeoff
View service →Drywall Takeoff
View service →Flooring Takeoff
View service →Masonry Takeoff
View service →Painting Takeoff
View service →Electrical Takeoff
View service →HVAC and ACMV Takeoff
View service →Plumbing Takeoff
View service →Mechanical Takeoff
View service →Earthwork Takeoff
View service →Roofing Takeoff
View service →Quantities From Your CORENET X Models
With BIM now required for new projects in Singapore, more tenders arrive with a model alongside the drawings. We extract quantities directly from Revit or IFC models where the model is reliable, and fall back to drawing measurement where elements are generic or incomplete.
We also cross-check model quantities against the drawings, because a model built for submission is not always modelled for measurement. Differences are reported so you know which number to trust.
Buildability and concrete usage
Accurate concrete and floor area quantities also help design teams review the Concrete Usage Index used in BCA’s buildability framework. We can provide concrete volumes by element and floor so your team can check the figures early.
Request a Takeoff QuoteOur Singapore Takeoff Workflow
Receive documents
Drawings, models, specifications and your BQ format.
Fixed fee
Confirmed within 24 working hours, depending on complexity.
Measure
Packages measured by block, level and zone with mark-ups.
Cross-check
Totals checked against schedules, sections and the model.
Issue
Quantities, marked drawings and query list, revised for addenda.
Built for Singapore Contractors and Consultants
- Main contractors preparing tenders for public and private projects
- QS consultancies preparing BQs under tight documentation programmes
- M&E contractors measuring ACMV, electrical and plumbing packages
- Precast and PPVC suppliers counting elements and modules for production planning
- Developers checking quantities in contractor submissions
Dedicated QS support: if you tender every week, a dedicated takeoff specialist works only on your projects, in your formats, and overlaps almost your full working day from 2.5 hours behind Singapore time.
More Preconstruction Support in Singapore
Quantity Takeoff Services in Singapore: FAQs
What does your quantity takeoff service in Singapore cover?
We measure piling and substructure, reinforced concrete, precast and PPVC, structural steel, architectural works, external works and M&E packages, with colour-coded marked-up drawings for every quantity.
Do you measure to SMM2?
We can follow SMM2 measurement principles or your firm's own measurement rules and BQ format, whichever your tender requires.
Can you take quantities from BIM models?
Yes. We extract quantities from Revit and IFC models where the model is reliable and cross-check them against drawings, reporting any differences.
Do you price the quantities too?
Takeoff is quantities only. If you need priced BQs or tender estimates in SGD, we provide those through our estimating service using your rates.
Which software do you use?
We use CostX, Bluebeam Revu, PlanSwift, Revit and Excel, and deliver in the format your team prices in.
How do you handle drawing errors or missing information?
We log conflicts and missing information as a query list during measurement, so you can raise tender clarifications early.
How quickly can you start?
We confirm a fixed fee within 24 working hours of receiving documents, depending on project complexity, and plan delivery around your closing date.
Let Us Do the Measuring
Send drawings or models with your closing date. Your fixed quote arrives within 24 working hours, depending on project complexity.