Data Centre BIM Modelling Services Singapore
Optimar Precon provides data centre BIM modelling services in Singapore for consultants and M&E contractors: IFC-SG models prepared for each CORENET X gateway, coordination for multi-storey data halls and models that feed prefabrication.
Models are built so the same data supports approvals, installation and handover, in line with Singapore’s push for integrated digital delivery.
Send Your Singapore BIM Scope
Tell us the gateway you are preparing for, the disciplines and the model dates, and we will propose a team and programme.
Group-wide figures across all Optimar Precon services.
Data Centre Models for Each CORENET X Gateway
CORENET X approvals run through a series of gateways. The model develops at each one, so it is planned from the start to carry what each review needs.
| Gateway | What the model supports | Our focus |
|---|---|---|
| Design Gateway | Design approval by the regulatory agencies | Coordinated architectural, structural and M&E models exported to IFC-SG |
| Piling Gateway (optional) | Early start on piling works | Structural and site models for the piling submission |
| Construction Gateway | Approval to start building works | Detailed M&E models, fire protection and services coordination |
| Completion Gateway | Approval to occupy | As-built models updated with installed changes |
IFC-SG exports are checked for the required properties before each submission, so models are not returned for missing data.
Coordinating Multi-Storey Data Centres in Singapore
Limited land means Singapore data centres stack halls and plant over several levels. Vertical coordination becomes the main challenge.
Vertical Risers
Power, cooling and fire services risers coordinated floor by floor, with spare capacity reserved.
Plant on Several Levels
Chillers, pumps and electrical rooms placed with structural loads and access checked.
Liquid Cooling per Floor
Secondary loops and CDUs routed on each data hall level without clashing with containment.
Hoisting Routes
Paths for lifting heavy equipment to upper floors kept clear in the model.
Data Centre Models Across BCA’s Integrated Digital Delivery Stages
BCA’s Integrated Digital Delivery (IDD) links design, fabrication, construction and operation through one set of digital data. The data centre model is set up to serve each stage.
| IDD stage | Model deliverable | On a Singapore data centre |
|---|---|---|
| Digital design | Coordinated models exported to IFC-SG | Submitted through the CORENET X gateways |
| Digital fabrication | Spool, rack and module models | Supports DfMA and prefabricated M&E for faster, safer installation |
| Digital construction | Model views by level and zone | Progress on stacked data halls checked floor by floor |
| Digital asset delivery | As-built models with equipment data | Handed to the operator for facilities management |
Singapore Data Centre BIM Deliverables
IFC-SG Submission Models
Models exported and checked for each CORENET X gateway.
Revit M&E Models
Electrical, mechanical, plumbing and fire protection models.
Clash Reports
Navisworks clash tests across levels, with issues tracked to closure.
Combined Services Drawings
Coordinated drawings for installation and builder’s work.
Prefabrication Models
Spool, rack and module models for offsite fabrication.
As-Built Models
Verified models with equipment data at completion.
Related services: Singapore data centre preconstruction, Singapore data centre estimating, preconstruction services Singapore, data centre MEP clash detection case study, US data centre BIM modelling.
Preparing for a CORENET X Gateway?
Send the current models and gateway date, and we will scope the IFC-SG modelling and checks.
Singapore Data Centre BIM Modelling: FAQs
How do you prepare models for CORENET X gateways?
Models are developed for the Design, Construction and Completion Gateways, and the optional Piling Gateway, with IFC-SG exports checked for required properties before each submission.
What does IFC-SG require from a data centre model?
IFC-SG requires specific properties on building elements so regulatory agencies can check them. Exports are checked before issue so models are not returned for missing data.
How do you coordinate multi-storey data centres?
Risers, plant on several levels, liquid cooling loops on each data hall floor and hoisting routes are coordinated floor by floor in a federated model.
Do your models support BCA’s Integrated Digital Delivery?
Yes. The same model supports digital design for CORENET X, digital fabrication of prefabricated M&E, construction progress by floor and as-built data for the operator.
Do you coordinate fire protection for SCDF submissions?
Yes. Sprinkler, gas suppression and detection layouts are coordinated in the model to the SCDF Fire Code, ready for the fire safety submission.
Is IFC-SG needed for every data centre project?
IFC-SG is required for new erections and major addition and alteration works with new gross floor area of 5,000 m² or more, which covers most new data centres. Smaller works follow other CORENET X submission routes.
Model Singapore Data Centres From Approval to Handover
IFC-SG models by gateway, coordinated across every level and ready for fabrication.