Germany | Frankfurt | Berlin | Munich

Data Centre Preconstruction Services Germany

Optimar Precon supports general contractors and building services (TGA) contractors in Germany with data centre preconstruction services: cost plans to DIN 276, bills of quantities for GAEB tenders, MEP takeoff and BIM coordination for data centres built under the Energy Efficiency Act.

Coordinated from our UK office, one hour behind German time, with estimates that carry efficiency, heat reuse and metering scope from the first cost plan.

Cost Plans to DIN 276
GAEB Bills of Quantities
EnEfG Efficiency Scope
One Hour From CET
Discuss Your German Data Centre Project →
Germany Data Centre Projects

Send Your German Project

Tell us the location, HOAI work stage and cost groups to price, and we will reply with a proposal and timeline.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecurityProtected drawings and models
ISO27701
Privacy InformationSupports GDPR-aligned data handling
ISO19650
BIM InformationUK BIM Framework compatible
Efficiency Law

How the Energy Efficiency Act Changes German Data Centre Scope

Germany’s Energy Efficiency Act (EnEfG) sets efficiency, renewable power and heat reuse rules for data centres with 300 kW or more of non-redundant connection capacity.

RequirementEnEfG ruleWhat it adds to the build
PUE, new facilities1.2 or lower for data centres starting operation from 1 July 2026High-efficiency cooling plant, free cooling and full metering
PUE, existing facilities1.5 from 1 July 2027 and 1.3 from 1 July 2030Cooling and controls upgrades on live sites
Energy reuse factor10% for facilities starting from 1 July 2026, rising to 15% and then 20% for later start datesHeat recovery plant, heat pumps and a heat network interface
Renewable electricity50% since 2024 and 100% from 1 January 2027Mostly procurement, plus metering and any on-site generation
Energy managementEnergy or environmental management system with continuous meteringSub-metering, power monitoring and BMS points

Exemptions apply in some cases, for example where no heat network operator will take the heat. We confirm which rules apply with your project team before pricing.

Heat Reuse

Pricing Waste Heat Recovery in German Data Centres

Heat reuse turns part of the cooling system into an energy supply. Each element is priced as its own package so the scope boundary with the heat network is clear.

Heat Recovery Plant

Heat exchangers on chilled water or liquid cooling loops, sized to the reuse target.

Heat Pumps

Plant to raise recovered heat to the temperature a district heating network needs.

Heat Transfer Station

The interface with the heat network operator, including metering and controls.

ERF Metering

Meters to measure reused energy against total consumption for annual reporting.

Off-Site Pipe Routes

Trenching and pipework to the network, with the ownership boundary agreed early.

Liquid Cooling Synergy

Higher return temperatures from liquid cooling make heat reuse more efficient.

Standards and Format

German Standards and Estimate Structure

AreaGerman referenceHow we deliver it
Cost structureDIN 276 cost groups, with building services under cost group 400Estimates structured by cost group
Design stagesHOAI work stages (Leistungsphasen)Cost estimate, cost calculation and cost approval matched to each stage
Bills of quantitiesLeistungsverzeichnis to VOB, exchanged in GAEB formatPriced BoQs set up for GAEB tenders
ElectricalVDE standards and DIN EN 50600Electrical scope priced to the standards specified
Currency and taxEUR, net of 19% VATVAT shown separately
Frankfurt am MainBerlin and BrandenburgMunichHamburgDüsseldorf and Rhine-Ruhr
What We Deliver

Preconstruction Services for German Data Centres

DIN 276 Cost Plans

Cost estimates and cost calculations for developers and design teams.

TGA Bid Estimates

Priced BoQs for building services contractors bidding data centre packages.

MEP Takeoff

Quantities by system, hall and phase for your own pricing.

Heat Reuse Estimates

Heat recovery, heat pump and network interface packages priced separately.

BIM Coordination

Coordinated Revit MEP models, clash-checked in Navisworks, to the employer’s BIM requirements (AIA).

Dedicated Teams

Full-time estimators or BIM coordinators working close to German hours.

Tendering a German Data Centre?

Send the LV, drawings and tender date, and we will confirm what we can price before submission.

Send Your Tender →
German Market Snapshot

German Data Centre Projects Moving Beyond Frankfurt

Large new German campuses are being planned outside the established Frankfurt market, bringing grid and heat reuse scope with them.

Regional Campus

Multi-Building Campus in Eastern Germany

Brandenburg, near the Polish border
Scale
Up to six 60 MW buildings, about 360 MW in total (reported estimate)
Investment
Around €3.5 billion, as reported by local officials
Status
Planned; full details not yet public
Power
Likely to need a new on-site substation

Preconstruction takeaway: campuses outside Frankfurt bring substation, grid connection and heat reuse scope into the estimate from the first cost plan.

Anonymized examples of publicly reported German projects, shown for market context. These are not Optimar Precon projects, and figures may have changed since the dates shown.

Frequently Asked Questions

Germany Data Centre Preconstruction: FAQs

How does the Energy Efficiency Act affect data centre construction in Germany?

New data centres starting operation from 1 July 2026 must reach a PUE of 1.2 or lower and reuse at least 10% of their energy, rising for later start dates. That adds high-efficiency cooling, heat recovery, heat pumps and metering to the construction scope.

What is the energy reuse factor requirement?

The energy reuse factor is the share of a data centre’s energy that is reused, usually as heat. Under the EnEfG it starts at 10% for facilities beginning operation from 1 July 2026 and rises to 15% and 20% for later start dates, with exemptions in some cases.

Do you prepare data centre estimates to DIN 276?

Yes. Estimates are structured by DIN 276 cost group, with building services under cost group 400, and matched to the HOAI work stage of the design.

Can you price bills of quantities for GAEB tenders?

Yes. Bills of quantities can be priced and set up for tenders exchanged in GAEB format, so they can be used in German tendering software.

Which electrical standards do you price German work to?

Electrical scope is priced to the VDE standards and DIN EN 50600 requirements specified for the project.

How do you work with German project teams?

Coordination runs from our UK office, one hour behind German time, with ISO/IEC 27001 certified handling of project documents and ISO/IEC 27701 privacy controls that support GDPR obligations.

Build German Data Centres to the Efficiency Act

DIN 276 cost plans, GAEB bills and BIM with efficiency and heat reuse scope built in.

Start Your German Project →
Scroll to Top