CAD Drafting Services in Dubai
A Dubai building goes through three rounds of drawings: shop drawings while it’s built, as-builts before the completion certificate, and fit-out sets once tenants move in. Optimar Precon drafts all three for contractors, fit-out firms and consultants, on your title blocks and to each reviewer’s checklist.
- Shop drawings released ahead of each pour, install and inspection
- As-built sets that pick up every site change before handover
- Tenant fit-out packages for developer and authority NOCs
Dubai Drafting Quote
Tell us which stage you’re at (shop, as-built or fit-out), how many sheets, and when they’re due.
Every Inspection and Handover Needs Drawings
What Dubai’s site teams got through in the first three months of 2026.
Dubai figures for Q1 2026. Each completion certificate depends on as-built drawings, and each inspection on approved shop drawings.
Don’t Let Paperwork Delay Handover
On many Dubai projects the building is finished before the drawings are. Site changes never reached the CAD files, shop drawings are on revision F, and the handover pack is due. We take the backlog so your engineers can stay on site.
Site mark-ups into clean CAD
Photos of marked-up prints, foreman sketches and site instructions turned into proper revisions.
One register for every sheet
Drawing number, revision, status and reviewer for each sheet, so you always know what’s still open.
Comments back the next day
Most consultant comments on shop drawings are closed and reissued within one working day.
Construction, Completion and Fit-Out
Six Dubai drawing packages, grouped by the stage you are at.
Rebar and formwork shop drawings
Pour-by-pour reinforcement and formwork details for cores, slabs and podiums, ready before the structural inspection.
Structural CAD →MEP coordinated shop drawings
Ductwork, pipework, cable tray and sprinkler layouts with sections through tight ceilings and risers.
MEP CAD →Joinery, ceiling and façade details
Fabrication drawings for specialist subcontractors, with setting-out dimensions taken from the approved design.
Shop drawings →As-built drawings for completion
Architectural, structural and MEP as-builts updated from site records for the completion certificate and handover pack.
As-built drawings →Tenant fit-out sets
Layouts, reflected ceilings, finishes and fire life safety plans for shops, F&B units and offices in newly completed towers.
Architectural CAD →Old PDFs to editable DWG
Scanned or PDF drawings of older Dubai buildings redrawn in CAD before a renovation or change of use.
CAD conversion →Drawings a Dubai Reviewer Can Sign Off
The details that decide whether a set is approved or comes back with comments.
Revision clouds and tables
Every change clouded and listed, so reviewers see only what is new.
Developer fit-out checklists
Tenant sets laid out to the landlord’s fit-out guide, sheet order and naming included.
Fire and life safety plans
Exits, travel distances, fire-rated walls and detector layouts on separate sheets for the fire consultant.
Site change register
Each site instruction or RFI tied to the as-built sheet it changed, for the handover file.
DWG and signed-ready PDF
Native CAD files plus PDFs set up for your stamp and signature.
Your title block
Drawn on your template, so the set goes out under your company name.
Optimar Precon drafts from your design and site records. Your engineer of record reviews, stamps and submits.
One Request From Each Stage
The kind of Dubai packages we’re sent, with what usually comes back.
Slab rebar shop drawings for a tower
A main contractor needs reinforcement drawings for the next six slabs, released two at a time ahead of each pour.
- You send
- Structural drawings, pour sequence
- You get
- Shop drawings per pour, BBS on request
- Typical time
- 3–4 days per release
MEP as-builts for a residential building
An MEP contractor has a stack of marked-up prints and a handover date four weeks away.
- You send
- IFC drawings, site mark-ups, RFIs
- You get
- As-built DWG and PDF, change register
- Typical time
- 2–3 weeks
Café fit-out in a new tower
A fit-out firm needs a full NOC set for a ground-floor café in a building that has just opened.
- You send
- Design sketches, base-build drawings
- You get
- Layout, ceiling, finishes, FLS sheets
- Typical time
- 4–6 working days
These cards describe common requests, not completed client projects. Your fee depends on your own sheet count. For finished work, see our success stories.
From Drawing List to Approved Set
Share the list
Send the drawing register, or just the sheets that are late, plus your deadline.
Sequence agreed
We order the work around your inspections, submissions and handover date.
Sheets released daily
Finished sheets come back every day, so reviews can start before the full set is done.
Comments closed
Reviewer comments are fixed, clouded and logged until the set is approved.
Dubai Drafting FAQs
Can you produce as-built drawings from site mark-ups?
Yes. Photos or scans of marked-up prints, site instructions and RFI replies are enough. Each change is drawn in, clouded and listed in a change register for your handover file.
Do you prepare fit-out drawings for developer NOCs?
Yes. Send the landlord’s fit-out guide and we lay the set out to it, including the sheet list, fire and life safety plans and any forms the guide asks for. Your consultant submits it.
How fast can you turn around shop drawing comments?
Most comment rounds are closed and reissued the next working day. Our team is 1.5 hours ahead of Dubai, so comments received in the morning are often done the same day.
Can you draw on our title block and CAD standards?
Yes. Send your template, layer standard and a sample set. Everything we draft goes out under your company name.
How is Dubai drafting priced?
Per sheet or per package for one-off work, or a monthly rate for a dedicated drafter. Send the drawing list or WhatsApp +91 88008 75774 for a quote.
Related services
Handover Date Getting Close?
Send the list of sheets still open. We’ll tell you how fast we can clear them.