New York · Local Law 97 retrofits · Existing towers · Scan to BIM · MEP upgrades

BIM Services in New York

In New York City, much of the work ahead is on existing buildings, not new towers. Local Law 97 puts carbon limits on most large buildings, and the limits tighten from 2030. Replacing boilers with heat pumps, rerouting risers and adding rooftop plant all start with knowing exactly what’s already there. Optimar Precon provides BIM services in New York for engineers, MEP contractors and owners’ teams working on those upgrades.

  • Existing buildings modeled from laser scans
  • New MEP systems coordinated inside occupied buildings
  • Phased models for floor-by-floor retrofit work

New York BIM Enquiry

Building size and use, the systems being replaced, and whether you have scan data.

Fixed quote within 24 working hours, depending on complexity. NDA available on request.

24 hrsFixed quote turnaround
3,270+Projects completed
DallasUS office, Eastern-time overlap
ISO 19650Certified for BIM, plus ISO 9001 & 27001
Local Law 97

Thousands of Buildings, One Deadline

The city’s emissions law is turning existing buildings into retrofit projects, and each one needs an accurate model before new systems can be designed.

Boiler to heat pump

Central plant replaced with heat pumps, with new refrigerant and power routes through the building.

Riser and shaft rework

New risers threaded through shafts that rarely match the drawings on file.

Rooftop plant

New rooftop units and dunnage placed around existing structure and bulkheads.

Electrical upgrades

Larger electrical services and distribution to carry new electric heating loads.

Retrofit risk

Old Drawings Don’t Show What’s in the Walls

Many New York buildings have been altered for decades, and the drawings on file rarely match what’s in the shafts and ceilings. Designing new heat pumps, ductwork and electrical service from those drawings leads to surprises during demolition. We model the building as it really is, then coordinate the new systems against it.

Scan

As-is conditions

Shafts, mechanical rooms and roofs modeled from point clouds.

Elec

Electrification routes

New heat pump, refrigerant and power routes checked against structure.

Phase

Occupied phasing

Work split into phases so tenants stay in place.

BIM model of an existing New York building being retrofitted
New York BIM work

BIM for Existing and New Buildings

Most of it in occupied buildings across the five boroughs.

MEP retrofit models

New heating, cooling and electrical systems modeled against existing conditions.

MEP BIM →

Roof and plant rooms

Rooftop units, cooling towers and dunnage coordinated in tight spaces.

BIM coordination →

High-rise new build

Typical floors, risers and mechanical floors for new towers.

BIM modeling →

Structural models

Steel and concrete frames modeled for openings and new loads.

Structural BIM →
Platforms: RevitNavisworksRecapACC
Deliverables

What Retrofit Teams Receive

For engineers, MEP contractors and owners’ representatives.

Existing-conditions model

The building as it stands, by floor and system.

Retrofit design model

New systems placed in the existing model.

Demolition plans

What comes out, shown floor by floor.

Clash reports

Conflicts between new and retained work.

Phasing views

Model views for each stage of occupied work.

As-built handover

Final model updated for the owner’s records.

We model from your engineers’ design. Emissions calculations, filings and stamped drawings stay with your registered design professionals.

Example scopes

Typical New York Requests

Three kinds of job New York teams send us.

Example scope · Electrification

Prewar co-op boiler replacement

An engineer needs the building modeled before designing heat pumps.

You send
Laser scan, old drawings
You get
Existing model, new MEP model
Typical time
4–7 weeks
Example scope · Office

Midtown office floor upgrades

An MEP contractor needs new ductwork coordinated floor by floor.

You send
Design drawings, scans
You get
Coordinated model, shop drawings
Typical time
3–6 weeks
Example scope · Roof

Rooftop plant replacement

An owner’s team needs new rooftop units placed on existing dunnage.

You send
Roof scan, equipment data
You get
Roof model, clash report
Typical time
2–3 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

How it runs

From Scan to Retrofit Model

Send the data

Point cloud from your surveyor, old drawings and the retrofit design.

Get a fixed quote

Scope, level of detail and dates confirmed within 24 working hours.

Model and coordinate

Existing building modeled, new systems added and clash-checked.

Phase and issue

Drawings issued for each stage of work.

FAQs

BIM Services in New York: FAQs

Can you model an existing New York building from a laser scan?

Yes. We turn point clouds into Revit models of floors, shafts, mechanical rooms and roofs, at the level of detail your retrofit design needs. We do not carry out site scanning ourselves.

Do you calculate Local Law 97 emissions or file reports?

No. Emissions calculations and filings stay with your registered design professionals and energy consultants. We provide the models and drawings for the retrofit work.

Can you coordinate work in an occupied building?

Yes. We split models into phases by floor or zone so new systems can be installed while tenants stay in place.

Do you also work on new towers?

Yes. We model and coordinate typical floors, risers and mechanical floors for new high-rise buildings.

How is a New York BIM project priced?

As a fixed fee based on building size, systems and level of detail. Send your scope and you’ll receive a fixed quote within 24 working hours.

Planning a Local Law 97 Retrofit?

Send what you have on the building. You’ll receive a fixed quote with scope, fee and dates within 24 working hours.

Scroll to Top