Montréal, Québec | Construction Estimating

Construction Estimating Services in Montreal

Optimar Precon provides construction estimating services in Montreal for contractors and subcontractors preparing multi-residential, commercial, institutional and renovation projects. We produce quantity takeoffs, bills of quantities and trade estimates from supplied construction drawings and tender documents.

Our offshore estimating team can organize bids in Canadian dollars using approved Québec labour assumptions, applicable GST/QST treatment and project-specific cost inputs.

✓ Quantity Takeoffs
✓ Québec Cost Inputs
✓ Trade Bid Estimates
✓ BOQ Documentation
Request a Montréal Estimate →

Send Your Montréal Project Details

Share your drawings, trade package, project borough and tender deadline.

29+Years of Group Experience
3,270+Projects Across Services
98%Client Retention
7+Global Delivery Centres

Company-wide figures, not Montréal project results.

Montréal Construction Conditions

What Makes Estimating in Montréal Different?

Urban construction, existing buildings and Québec trade requirements call for clear quantity breakdowns and carefully documented pricing assumptions.

01

Multi-Residential Buildings

Separate foundation, parking, podium, structural floor and residential unit quantities. Track variations between levels.

02

Heritage and Existing Buildings

Identify restoration, selective demolition and existing-service interfaces using the consultant’s defined scope and survey information.

03

Urban Access and Seasonal Work

Record specified allowances for winter protection, deliveries, restricted staging and phased work when relevant to the tender.

Trade Quantity Estimating

Construction Estimating for Montréal Contractors

Build an estimate around the actual tendered trades, rather than a generic whole-building cost allowance.

01

Concrete and Foundations

Footings, slabs, structural walls, formwork and reinforcement measured by drawing and level.

02

MEP and Electrical

HVAC distribution, plumbing, fixtures, electrical systems and specified equipment packages.

03

Building Envelope

Masonry, insulation, roofing, facade assemblies and exterior finishes.

04

Interiors and Renovations

Partitions, drywall, flooring, ceilings, doors and selective demolition packages.

05

Sitework and Structural Steel

Excavation, grading, drainage, steel members and connections from design documentation.

06

Tender Estimates and BOQs

Measured trade schedules, agreed cost assumptions, drawing references and revision records.

Québec Tender Cost Considerations

Québec-Specific Inputs for Montréal Estimates

The estimating basis should reflect the actual construction sector, contract requirements and tax treatment.

Cost input Estimating approach
CCQ Labour Rates Use the applicable Québec trade, sector, collective agreement, benefits and employer-cost inputs confirmed for the assignment.
GST and QST Account for 5% GST and 9.975% QST where applicable. Confirm which amounts are recoverable and how taxes should appear in the bid.
Borough and Heritage Scope Review supplied permit conditions, heritage requirements and drawings for demolition, restoration and special construction scope.
Winter Construction Include specified cold-weather protection, heating or scheduling allowances when applicable.
French Tender Documentation Confirm document language, trade terminology, measurement units and required report format before work begins.
Estimating Process

From Québec Tender Documents to Cost Schedules

01. Review Check plans, specifications, scope, addenda and tender requirements.
02. Measure Build takeoffs by trade, floor or construction phase.
03. Price Apply agreed CAD cost inputs, labour assumptions and tax treatment.
04. Verify Reconcile quantities, exclusions, updated drawings and cost schedules.

Need Additional Estimating Capacity?

Discuss individual trade takeoffs or recurring offshore estimating support for your Montréal bids.

Discuss Your Tender Scope →
What You Receive

Estimating Deliverables for Montréal Projects

Trade Quantity Takeoffs

Quantities, units and drawing references organized by the agreed trade scope.

Cost and BOQ Schedules

Material, labour and other agreed cost categories presented in CAD.

Review and Revision Notes

Assumptions, exclusions, outstanding information and changes arising from addenda.

Frequently Asked Questions

Montréal Construction Estimating FAQs

What construction estimating services do you provide in Montréal?

Optimar Precon provides quantity takeoffs, BOQs, trade cost schedules and bid estimating support for defined residential, commercial, institutional and renovation scopes. Deliverables follow the supplied drawings and agreed requirements.

Can you use Québec CCQ labour rates?

Yes. Estimates can incorporate client-approved CCQ wage rates, trade classifications and applicable employer costs. The contractor must confirm the correct collective agreement, construction sector and rate basis.

Do Montréal estimates include GST and QST?

Estimates can account for the applicable GST and QST using the agreed bid format. The contractor or tax adviser should confirm recoverable amounts, exclusions and final tax treatment.

Can you estimate heritage renovations?

Yes. We can measure specified restoration, demolition, masonry, interior finish and MEP scopes using approved drawings and available condition records. Heritage approvals and design decisions remain with the responsible project professionals.

What documents do you need?

Submit the latest drawings, specifications, addenda, trade requirements, project borough, pricing assumptions, preferred report language and tender closing date.

Prepare Your Next Montréal Construction Bid

Send your tender documents, trade scope and project requirements for review.

Send Your Project Requirements →
Scroll to Top