Construction Estimating Services in Montreal
Optimar Precon provides construction estimating services in Montreal for contractors and subcontractors preparing multi-residential, commercial, institutional and renovation projects. We produce quantity takeoffs, bills of quantities and trade estimates from supplied construction drawings and tender documents.
Our offshore estimating team can organize bids in Canadian dollars using approved Québec labour assumptions, applicable GST/QST treatment and project-specific cost inputs.
Send Your Montréal Project Details
Share your drawings, trade package, project borough and tender deadline.
Company-wide figures, not Montréal project results.
What Makes Estimating in Montréal Different?
Urban construction, existing buildings and Québec trade requirements call for clear quantity breakdowns and carefully documented pricing assumptions.
Multi-Residential Buildings
Separate foundation, parking, podium, structural floor and residential unit quantities. Track variations between levels.
Heritage and Existing Buildings
Identify restoration, selective demolition and existing-service interfaces using the consultant’s defined scope and survey information.
Urban Access and Seasonal Work
Record specified allowances for winter protection, deliveries, restricted staging and phased work when relevant to the tender.
Construction Estimating for Montréal Contractors
Build an estimate around the actual tendered trades, rather than a generic whole-building cost allowance.
Concrete and Foundations
Footings, slabs, structural walls, formwork and reinforcement measured by drawing and level.
MEP and Electrical
HVAC distribution, plumbing, fixtures, electrical systems and specified equipment packages.
Building Envelope
Masonry, insulation, roofing, facade assemblies and exterior finishes.
Interiors and Renovations
Partitions, drywall, flooring, ceilings, doors and selective demolition packages.
Sitework and Structural Steel
Excavation, grading, drainage, steel members and connections from design documentation.
Tender Estimates and BOQs
Measured trade schedules, agreed cost assumptions, drawing references and revision records.
Québec-Specific Inputs for Montréal Estimates
The estimating basis should reflect the actual construction sector, contract requirements and tax treatment.
| Cost input | Estimating approach |
|---|---|
| CCQ Labour Rates | Use the applicable Québec trade, sector, collective agreement, benefits and employer-cost inputs confirmed for the assignment. |
| GST and QST | Account for 5% GST and 9.975% QST where applicable. Confirm which amounts are recoverable and how taxes should appear in the bid. |
| Borough and Heritage Scope | Review supplied permit conditions, heritage requirements and drawings for demolition, restoration and special construction scope. |
| Winter Construction | Include specified cold-weather protection, heating or scheduling allowances when applicable. |
| French Tender Documentation | Confirm document language, trade terminology, measurement units and required report format before work begins. |
From Québec Tender Documents to Cost Schedules
Need Additional Estimating Capacity?
Discuss individual trade takeoffs or recurring offshore estimating support for your Montréal bids.
Estimating Deliverables for Montréal Projects
Trade Quantity Takeoffs
Quantities, units and drawing references organized by the agreed trade scope.
Cost and BOQ Schedules
Material, labour and other agreed cost categories presented in CAD.
Review and Revision Notes
Assumptions, exclusions, outstanding information and changes arising from addenda.
Montréal Construction Estimating FAQs
What construction estimating services do you provide in Montréal?
Optimar Precon provides quantity takeoffs, BOQs, trade cost schedules and bid estimating support for defined residential, commercial, institutional and renovation scopes. Deliverables follow the supplied drawings and agreed requirements.
Can you use Québec CCQ labour rates?
Yes. Estimates can incorporate client-approved CCQ wage rates, trade classifications and applicable employer costs. The contractor must confirm the correct collective agreement, construction sector and rate basis.
Do Montréal estimates include GST and QST?
Estimates can account for the applicable GST and QST using the agreed bid format. The contractor or tax adviser should confirm recoverable amounts, exclusions and final tax treatment.
Can you estimate heritage renovations?
Yes. We can measure specified restoration, demolition, masonry, interior finish and MEP scopes using approved drawings and available condition records. Heritage approvals and design decisions remain with the responsible project professionals.
What documents do you need?
Submit the latest drawings, specifications, addenda, trade requirements, project borough, pricing assumptions, preferred report language and tender closing date.
Prepare Your Next Montréal Construction Bid
Send your tender documents, trade scope and project requirements for review.