Data Centre Preconstruction Services Saudi Arabia

Optimar Precon supports contractors delivering Saudi Arabia’s data centre build-out with data centre preconstruction services: BoQs in SAR, MEP takeoff and BIM coordination aligned to the Saudi Building Code.

Saudi programmes move fast and at national scale, so we plan long-lead equipment, power strategy and phasing into the estimate from day one.

BoQs in SAR, Client Format
SBC 401 Electrical Scope
Long-Lead Equipment Planning
BIM to Client Requirements
Discuss Your Saudi Data Centre Project →
Saudi Arabia Data Centre Projects

Send Your Saudi Project

Share the city or region, project stage, trades and deadline. We will reply with scope, fee and timing.

29+Years of Group Experience
3,270+Projects Completed Across Services
98%Client Retention
7+Global Delivery Centres

Group-wide figures across all Optimar Precon services.

ISO9001
Quality ManagementReviewed, documented deliverables
ISO27001
Information SecuritySupports data residency obligations
ISO27701
Privacy InformationManaged handling of project data
ISO19650
BIM InformationMeets client BIM requirements
A National Build-Out

Why Saudi Data Centre Preconstruction Is Different

Saudi Arabia’s national data centre strategy targets around 1.5 GW of capacity by 2030, as part of Vision 2030 digital transformation.

National-Scale Programmes

Large campuses delivered in repeated phases, where consistent estimating across buildings matters.

Multiple Power Routes

Grid supply, behind-the-meter generation, hybrid arrangements and green PPAs each change the electrical scope.

Water-Efficient Cooling

Low-water-intensity and closed-loop cooling systems are favoured where feasible.

Data Residency Rules

Localisation and cyber standards make secure handling of project data essential.

Power Strategy

How Power Supply Choices Change the Estimate

Grid connection, capacity allocation and tariffs are set through SERA and the Ministry of Energy. The chosen supply route decides what the contractor builds.

Power routeWhat it means on siteWhat we price
Grid supplyConnection through the national utility networkSubstation, HV and MV switchgear, metering and connection works
Behind-the-meter generationDedicated on-site power plant for the data centreGeneration plant, fuel systems, exhaust, controls and interconnection
HybridGrid supply backed by on-site generationBoth scopes, with interface and protection packages
Green PPA or certificatesRenewable supply procured off siteMetering and interface scope; no on-site plant

Where on-site generation is part of the scope, we estimate it as its own set of packages so it can be tendered and programmed separately from the data halls.

Codes and Format

Saudi Building Code and Estimate Format

AreaReferenceHow we deliver it
ElectricalSaudi Building Code SBC 401Electrical scope priced to SBC 401 requirements
Fire protectionSBC 801 and Civil Defense approvalSuppression and detection scope to Civil Defense requirements
Energy conservationSBC 601Envelope and MEP efficiency measures carried as cost items
MeasurementPOMI, NRM or client formatBoQs in the specified format, in SAR
DocumentsEnglish, with Arabic where requiredDeliverables in English; bilingual titles on request
RiyadhEastern Province (Dammam, Dhahran, Al Khobar)Jeddah and Western RegionNew economic and industrial hubs
Programme Risk

Long-Lead Equipment, Planned Into the Estimate

Transformers, switchgear, generators and cooling plant are the main schedule risks on Saudi data centres. Our estimates flag them early.

Transformers

Ratings, quantities and delivery assumptions listed so procurement can start from the estimate.

Switchgear

MV and LV lineups priced by section, with quote leveling across suppliers.

Generators

Standby or prime generation counted by rating, with enclosures and fuel systems.

Cooling Plant

Chillers and CRAH units sized for high ambient conditions and priced with alternates.

Early Procurement Packages

Long-lead items grouped into packages that can be released before the main tender.

Phased Delivery

Equipment mapped to build phases so cash flow and programme line up.

Starting a Saudi Data Centre Programme?

Send the location, phase plan and documents, and we will scope estimating, takeoff and BIM support for each stage.

Send Your Project →
Saudi Market Snapshot

Saudi Data Centre Projects Shaping Demand

Saudi campuses are now being planned at gigawatt scale, with major grid infrastructure delivered as enabling works.

AI Campus

Multi-Gigawatt AI Campus

East Riyadh
Scale
6 GW campus on a 24 sq km site, built in two phases across six 1 GW plots
Status (September 2026)
Enabling infrastructure contract awarded
Power infrastructure
380 kV, 132 kV and 33 kV networks with a 2,000 MVA bulk supply point

Preconstruction takeaway: enabling works such as HV networks and bulk supply points are tendered before the data halls, so estimates are needed early and in separate packages.

Anonymized examples of publicly reported Saudi projects, shown for market context. These are not Optimar Precon projects, and figures may have changed since the dates shown.

Frequently Asked Questions

Saudi Arabia Data Centre Preconstruction: FAQs

What is driving data centre construction in Saudi Arabia?

Saudi Arabia’s national data centre strategy, part of Vision 2030, targets around 1.5 GW of capacity by 2030. Demand comes from cloud, AI and government digital services, with large campuses in Riyadh, the Eastern Province and the Western Region.

Which building codes apply to Saudi data centre MEP?

Electrical work follows the Saudi Building Code SBC 401, fire protection follows SBC 801 with Civil Defense approval, and energy conservation follows SBC 601. We set up estimates to the code editions specified for your project.

How does the power supply route change the estimate?

Grid supply needs substation and connection works, behind-the-meter generation adds a dedicated power plant, and hybrid schemes need both plus interface packages. We price the route chosen for your site, separately from the data halls.

Which BoQ format do you use for Saudi tenders?

We follow the consultant or client format, commonly POMI, NRM or a client template, with rates and totals in SAR and deliverables in English.

How do you manage long-lead equipment risk?

Transformers, switchgear, generators and chillers are listed with ratings, quantities and delivery assumptions, and grouped into early procurement packages that can be released before the main tender.

How is project data protected for Saudi projects?

NDAs are signed before documents are shared, access is limited to named team members, and Optimar Precon is certified to ISO/IEC 27001 and ISO/IEC 27701, which supports clients with data residency and cyber obligations.

Build Saudi Data Centres on a Solid Cost Base

Estimates and models that plan power, equipment and phasing for national-scale programmes.

Start Your Saudi Project →