Construction Estimating Services in London
London tenders are tight on time and heavy on detail: restricted sites, phased refurbishments and M&E-dense towers. Optimar Precon provides construction estimating services in London for main contractors, subcontractors, QSs and developers who need priced estimates and BOQs without adding to their commercial team.
- Priced estimates, BOQs and tender pricing in GBP
- Measured to NRM1, NRM2 or your own format
- UK office in Chertsey, just off the M25
London Estimate Request
Drawings, trades to price, your format and tender deadline.
Fixed quote within 24 working hours, depending on complexity. NDA available on request.
Where London Teams Need Pricing Help
Four kinds of work that fill London tender calendars.
Office and fit-out
Cat A and Cat B fit-outs and refurbishments across the City, West End and Canary Wharf.
Residential towers
Build-to-rent and mixed-use blocks in Nine Elms, Stratford and the outer boroughs.
Refurbishment
Occupied buildings, restricted access and phased works that change preliminaries.
M&E-heavy buildings
Hospitals, labs and data centres where services drive most of the cost.
London Costs Priced From the Drawings, Not Guessed
Logistics, access and working-hour limits move London prices more than anywhere else in the UK. We price them as separate, visible items, so your team can see and adjust every assumption before the tender goes in.
Rate build-ups you can audit
Labour, plant and materials shown for every major rate.
Site constraints priced
Access, deliveries, hoarding and phasing as separate items.
Clear exclusions
Assumptions and provisional sums ready for your tender letter.
Estimating Services for London Projects
From early cost plans to final tender pricing.
Tender and bid estimates
Full priced bids with summaries, prelims and qualifications.
Bid estimating →Priced BOQs
Bills measured to NRM2 and priced with rate analysis.
BOQ estimating →M&E estimating
HVAC, electrical, public health and fire packages priced by system.
MEP estimating →Frame and structure
Concrete, rebar, formwork and steel priced for the build sequence.
Steel estimating →Fit-out and finishes
Drylining, ceilings, flooring and decorations for Cat A and Cat B.
Drywall estimating →Value engineering
Alternative materials and methods priced side by side.
Value engineering →What London Teams Receive
Everything your commercial manager needs at tender review.
GBP cost summary
Totals by trade, with prelims, OH&P and VAT on separate lines.
Rate build-ups
Labour, plant and materials behind the high-value items.
Preliminaries schedule
Staff, welfare, hoarding, access and logistics priced.
Quantity workbook
Measured quantities with marked-up drawings.
Qualifications list
Assumptions and exclusions ready for your tender letter.
Revision reports
Cost changes shown after each addendum.
We prepare the estimate. Your team sets the final margin and signs the tender. Quantities only? See our takeoff services in London.
Typical London Requests
Three common jobs from London contractors and QSs.
City Cat A refurbishment
A main contractor needs a priced tender for three floors in an occupied building.
- You send
- Drawings, spec, prelims rules
- You get
- Priced estimate and qualifications
- Typical time
- 5–7 days
Stratford BTR M&E package
An M&E subcontractor needs services priced by system for a tower tender.
- You send
- M&E drawings, schedules
- You get
- Priced M&E estimate
- Typical time
- 5–6 days
School extension BOQ
A consultant needs a priced bill for a borough school extension.
- You send
- Design drawings, specification
- You get
- Priced NRM2 BOQ
- Typical time
- 1–2 weeks
These are example scopes, not completed client projects. See finished work in our success stories.
How a London Estimate Runs
Send
Drawings, specification, addenda and your deadline.
Get a fixed quote
Fee and delivery date within 24 working hours.
Measure and price
Quantities taken off, rates built up and checked.
Review and issue
Summary, qualifications and workbook sent for your review.
Estimating Services in London: FAQs
What estimating services do you provide in London?
Tender and bid estimates, priced BOQs, cost plans, trade estimates for M&E, structure and fit-out, value engineering and variation pricing for London contractors, QSs and developers.
Do you price in GBP and to NRM?
Yes. Estimates are in pounds sterling, measured to NRM1 for cost plans or NRM2 for detailed bills, or to your own template and coding.
How do you handle London site constraints?
Access, delivery windows, hoarding, working hours and phasing are priced as separate preliminaries items from the information in your tender, so your team can adjust them.
Where do your rates come from?
From build-ups using labour outputs, plant and materials, plus your rate library or supplier quotes. Every rate can be traced, and final pricing decisions stay with your team.
Which areas of London do you cover?
All of Greater London, from the City and Canary Wharf to Stratford, Croydon, Wembley and Kingston. Our UK office is in Chertsey, Surrey, just outside the M25.
How do I get a quote?
Send your drawings and tender deadline through the form, by email to support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA). You’ll receive a fixed quote within 24 working hours, depending on complexity.
Nearby and related
London Tender Due?
Send the drawings. You’ll receive a fixed fee and delivery date within 24 working hours.