City · Canary Wharf · Nine Elms · Stratford · Greater London

Construction Estimating Services in London

London tenders are tight on time and heavy on detail: restricted sites, phased refurbishments and M&E-dense towers. Optimar Precon provides construction estimating services in London for main contractors, subcontractors, QSs and developers who need priced estimates and BOQs without adding to their commercial team.

  • Priced estimates, BOQs and tender pricing in GBP
  • Measured to NRM1, NRM2 or your own format
  • UK office in Chertsey, just off the M25

London Estimate Request

Drawings, trades to price, your format and tender deadline.

Fixed quote within 24 working hours, depending on complexity. NDA available on request.

24 hrsFixed quote turnaround
3,270+Projects completed
ChertseyUK office, Surrey
ISO 9001Certified quality management
London projects

Where London Teams Need Pricing Help

Four kinds of work that fill London tender calendars.

Office and fit-out

Cat A and Cat B fit-outs and refurbishments across the City, West End and Canary Wharf.

Residential towers

Build-to-rent and mixed-use blocks in Nine Elms, Stratford and the outer boroughs.

Refurbishment

Occupied buildings, restricted access and phased works that change preliminaries.

M&E-heavy buildings

Hospitals, labs and data centres where services drive most of the cost.

Why Optimar Precon

London Costs Priced From the Drawings, Not Guessed

Logistics, access and working-hour limits move London prices more than anywhere else in the UK. We price them as separate, visible items, so your team can see and adjust every assumption before the tender goes in.

GBP

Rate build-ups you can audit

Labour, plant and materials shown for every major rate.

Site

Site constraints priced

Access, deliveries, hoarding and phasing as separate items.

Scope

Clear exclusions

Assumptions and provisional sums ready for your tender letter.

Construction cost estimate prepared for a London tender
Estimating services

Estimating Services for London Projects

From early cost plans to final tender pricing.

Tender and bid estimates

Full priced bids with summaries, prelims and qualifications.

Bid estimating →

M&E estimating

HVAC, electrical, public health and fire packages priced by system.

MEP estimating →

Frame and structure

Concrete, rebar, formwork and steel priced for the build sequence.

Steel estimating →
Tools: CostXBluebeamPlanSwiftExcel
Deliverables

What London Teams Receive

Everything your commercial manager needs at tender review.

GBP cost summary

Totals by trade, with prelims, OH&P and VAT on separate lines.

Rate build-ups

Labour, plant and materials behind the high-value items.

Preliminaries schedule

Staff, welfare, hoarding, access and logistics priced.

Quantity workbook

Measured quantities with marked-up drawings.

Qualifications list

Assumptions and exclusions ready for your tender letter.

Revision reports

Cost changes shown after each addendum.

We prepare the estimate. Your team sets the final margin and signs the tender. Quantities only? See our takeoff services in London.

Example scopes

Typical London Requests

Three common jobs from London contractors and QSs.

Example scope · Office

City Cat A refurbishment

A main contractor needs a priced tender for three floors in an occupied building.

You send
Drawings, spec, prelims rules
You get
Priced estimate and qualifications
Typical time
5–7 days
Example scope · Residential

Stratford BTR M&E package

An M&E subcontractor needs services priced by system for a tower tender.

You send
M&E drawings, schedules
You get
Priced M&E estimate
Typical time
5–6 days
Example scope · Education

School extension BOQ

A consultant needs a priced bill for a borough school extension.

You send
Design drawings, specification
You get
Priced NRM2 BOQ
Typical time
1–2 weeks

These are example scopes, not completed client projects. See finished work in our success stories.

Working with us

How a London Estimate Runs

Send

Drawings, specification, addenda and your deadline.

Get a fixed quote

Fee and delivery date within 24 working hours.

Measure and price

Quantities taken off, rates built up and checked.

Review and issue

Summary, qualifications and workbook sent for your review.

FAQs

Estimating Services in London: FAQs

What estimating services do you provide in London?

Tender and bid estimates, priced BOQs, cost plans, trade estimates for M&E, structure and fit-out, value engineering and variation pricing for London contractors, QSs and developers.

Do you price in GBP and to NRM?

Yes. Estimates are in pounds sterling, measured to NRM1 for cost plans or NRM2 for detailed bills, or to your own template and coding.

How do you handle London site constraints?

Access, delivery windows, hoarding, working hours and phasing are priced as separate preliminaries items from the information in your tender, so your team can adjust them.

Where do your rates come from?

From build-ups using labour outputs, plant and materials, plus your rate library or supplier quotes. Every rate can be traced, and final pricing decisions stay with your team.

Which areas of London do you cover?

All of Greater London, from the City and Canary Wharf to Stratford, Croydon, Wembley and Kingston. Our UK office is in Chertsey, Surrey, just outside the M25.

How do I get a quote?

Send your drawings and tender deadline through the form, by email to support@optimarprecon.com, or call +44 74 2787 2167 (UK) or +1 (469) 210-7530 (USA). You’ll receive a fixed quote within 24 working hours, depending on complexity.

London Tender Due?

Send the drawings. You’ll receive a fixed fee and delivery date within 24 working hours.

Scroll to Top