20-cost-savings-with-cloud-based-off-for-150-M-UAE-hotel-UAE-hotel-project

20% Cost Savings with Cloud-Based Takeoff for a $150M UAE Hotel Project

20%-cost-savings-with-cloud-based-takeoff-for-a-$150M-uae-hotel-uae-hotel-project

Project Overview

In Abu Dhabi, UAE, a $150 million luxury hotel project aimed to create a 500-room, 25-story resort with sustainable features compliant with the UAE’s Estidama Pearl Rating. Optimar Precon was brought in to provide cloud-based takeoff and Bill of Quantities (BOQ) estimation services to ensure accurate budgeting and a competitive bidding process. The 20-month project required tight cost control to meet investor expectations.

Our expertise in Bluebeam, PlanSwift, and digital estimation—backed by a 92% bid-hit ratio—enabled us to deliver accurate, efficient results that kept the project on budget and schedule.

Challenge: CAD Inconsistencies and Tight Timelines

The project faced serious issues with inconsistent CAD files and outdated manual takeoff methods. This created a 12% risk of budget overrun due to errors in material quantities for concrete, steel, and interior finishes—translating to nearly $10 million in potential extra costs and a three-month delay. The client also needed Estidama-compliant estimates to support sustainable material use and attract reliable subcontractors. Traditional estimating methods couldn’t meet the timeline or accuracy requirements.

Solution for UAE Hotel

Optimar Precon implemented a cloud-based takeoff and estimation strategy:

  • Digital Takeoff: Used Bluebeam Revu to process 350+ drawings, extracting quantities for 15,000+ items including concrete, rebar, finishes, and MEP systems.
  • Cloud Access: Hosted data on a secure platform for seamless collaboration between local UAE contractors and international stakeholders.
  • BOQ Development: Built a detailed BOQ in PlanSwift with verified quantities and 99% item accuracy.
  • Cost Optimization: Identified over $12 million in savings through procurement analysis, such as bulk buying of low-carbon concrete and modular systems.
  • Estidama Compliance: Ensured all estimates aligned with Estidama requirements, prioritizing low-impact and regionally sourced materials.

Weekly cost updates and estimation workshops helped keep all parties aligned on cost and sustainability.

Results of UAE Hotel Takeoff & Estimation

Our takeoff and estimation services delivered remarkable results:

  • Cost Savings: Cut projected material costs by 20%, saving $12 million through optimized procurement and reduced waste.
  • Time Efficiency: Delivered the complete takeoff 35% faster than traditional methods, saving nearly 8 weeks.
  • Bid Accuracy: Supported a 92% bid-hit ratio, helping the client attract top-tier subcontractors.
  • Compliance: Fully met Estidama sustainability standards and passed all related audits.
  • Transparency: Provided real-time cost tracking, boosting investor confidence during progress reviews.

The client commended our precision and ability to deliver under pressure, ensuring a cost-effective project.

Client Testimonial

Optimize your project costs with our takeoff services. Contact us at support@optimarprecon.com or visit our Takeoff and Estimation Services page to learn more.

Scroll to Top